This blueprint addresses capacity constraints on HDN B.V. L. Narayana routes, including feeder routes and terminal constraints, through strategic capacity expansions. The plan identifies critical sections, projects capacity utilization, and recommends 124 works totaling 14185 crores in investments. Leveraging the LRDSS tool, the recommendations aim to optimize long-term investments for enhancing throughput. LRDSS encompasses various modules for comprehensive investment analysis, incorporating market analysis, traffic forecasting, and benefit-cost analysis. Input data includes production forecasts, traffic surveys, and cost data, enabling simulation of train operations for effective planning.
E N D
Blue print for throughput enhancement on HDN B.V.L.Narayana SPTM/ RSC/ BRC
Critical issues and redressal • Constraints • CAPACITY CONSTRAINTS ON HDN ROUTES • Terminal constraints • Overcome by • Investments in Strategic capacity expansions
High density network • Consists of • Seven routes • Six feeder routes • Carries • 76% of freight GMT • 71% of passenger and freight GMT • Accounts for 28% of route KMs
ISSUES CONSIDERED • GROWTH PATTERNS OF MAJOR COMMODITIES FOR ALL ROUTES EXCEPT NDLS-HWH and NDLS-BB • STEEL • COAL • CONTAINERS • IRON ORE • PORT CONNECTIVITY • LRDSS PROJECTIONS FROM 2005-06
Methodology • Collate all line capacity statements for all HDN routes • Project capacity utilization till 2011-12 • Identify critical sections • Validated by projections from LRDSS • Review with zonal railways • Estimate level of investments
Recommendations • 124 works • 14185 crores investments • Over and above DFC projects • Investment needs for 25t Axle load separately done
LRDSS • an objective tool for planning and prioritizing capacity enhancement projects based on traffic projections over the next two decades. • Started in 1994 • Strategic tool for long term investment planning
LRDSS • The system consists of a comprehensive set of modules which cover different aspects of the investment analysis viz:- • 1)Facility Performance Module • 2)Market Analysis Module • 3)Traffic Forecasting Module • 4)Traffic Assignment Module • 5)Benefit Cost Analysis Module • 6)Terminal Analysis Module • 7)Multi-modal Corridor Analysis Module
LRDSS • Inputs required • Production and consumption forecasts • From planning commission • Ministries • Traffic surveys • Market surveys for customer sensitivity • Cost data • Field Level Data To Simulate Train Running On a Section