Europa Oil & Gas (Holdings) plc 2006 AGM

Europa Oil & Gas (Holdings) plc 2006 AGM. Timelines Established 1995 First well drilled 1999 First UK Production 2003 Floated on AIM 2004 First Romania production 2006 Focus on Europe and North Africa

darcie
Download Presentation

Europa Oil & Gas (Holdings) plc 2006 AGM

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Europa Oil & Gas (Holdings) plc 2006 AGM

  2. Timelines • Established 1995 • First well drilled 1999 • First UK Production 2003 • Floated on AIM 2004 • First Romania production 2006 • Focus on Europe and North Africa • Currently producing c.600 BOEPD (240 BOPD in the UK, 360 BOEPD (2 mmscf/d) in Romania/Ukraine • Anticipate up to 6 wells in 2007: • 2 in the UK • 4 in Romania (possibly as many as 5 if supported by technical work) Synopsis

  3. Current Portfolio Europe and North Africa

  4. Turnover £2.83 million, up 18% • Operating Profit £1.09 million, up 29% • Profit before tax £0.91 million, up 157% • Profit after tax on 2006 activity £0.51 million, up 43% • Provision for £1.08 million Deferred Tax which may come due in over one year’s time • Loss after total tax provision of £0.57 million Financial Results To 31 July 2006

  5. Historic Performance and Projections Note: 2004 Accounts covered an 18 month period and figures have been rebased to 12 months.

  6. Production Start-up at Bilca (Romania) • Acquired Crosby Warren Oilfield (UK Onshore) • Diversity of production streams allowed for first debt financing for Crosby Warren acquisition • Successful Licence Round Applications: • Egypt – West Darag Concession • Western Sahara – Bir Lehlou and Hagounia Concessions • France – Bearn des Gaves Concession • 3 Seismic surveys undertaken in Romania • Secured extension to EPI-3 Concession (Romania) 2006 Achievements

  7. 2006 Achievements

  8. Drilling Programme • Romania • Arbore-1 Firm Exploration Q1 • Costisa-1Y Firm Appraisal Q1 • E Radauti-1 Firm Exploration Q1 • Boistea-1 Firm Exploration Q2 • Voitinel Contingent (S) Exploration Q2 • Siretu-1 Contingent (S) Exploration Q2 • UK • Holmwood-1 Contingent (P) Exploration H2 • PEDL150 Contingent (S) Exploration H2 • Seismic Programme • UK • PEDL150 Firm 50km 2D Feb (P) Planning Permission (S) Outcome of Seismic Evaluation 2007 Capital Programme

  9. 2007 Planned Activity

  10. 2007 Drilling Programme Details

  11. E W Bilca 2 Bilca 1 Bilca Play Exploration Plenty of potential NE Radauti Extending the Miocene AVO gas play Large area between Fratauti and Todiresti totally unexplored, 260km data acquired in 2006 – Initial results confirms Arbore and E Radauti Prospects for 2007 drilling. Area of 2006 Seismic Infill Arbore NE Codru Voitinel – up to 300 bcf gross potential Work in progress - Drilling ?2007

  12. Bilca Play Exploration Boistea-1 well Extending the Miocene AVO gas play southwards Seismic anomalies developed in area to north of Roman (600bcf) Gasfield.

  13. Costisa-1 Re-entry Testing a potential gas reservoir Costisa well encountered a 25 metre gas column, well to be tested early 2007 Delays have been due to access issues Costisa feature difficult to map Currently up to 100 bcf potential – will need new 3D for development

  14. Weald Exploration High Quality Prospect – Holmwood-1 • Low risk exploration prospect 1:2 chance of success • Reserve size on prospect of 10 – 20mmbo gross. Combined net risked valuation of $28mm, unrisked $90mm • Holmwood ready to drill subject to planning permission

  15. Whisby-4 well encountered new reservoir zone – Loxley edge Reservoir performance to date is very encouraging for large volumes in Loxley 2006 Seismic reprocessing developed 4 leads East Midlands Exploration PEDL150 Seismic programme planned for Q1/07 to choose well location

  16. Production Forecasts

  17. Near Term Revenue Potential Existing Production Assets Assumes $50/bbl, Romania gas price on ramp to $220/mcm

  18. Crosby Warren Immediate Upside Realised

  19. Peer Group analysisSustainability & Value

  20. Summary • Ending 2006 with c.600 boepd production, • Rising to c.700 boepd in Q2 07. • Current Monthly wellhead revenues c.$560k per month. • Equates to £3.7 mm per annum, • Set to rise in the next 6 months. • £8 mm net assets and only £200k debt. • Strong Drilling programme to bring exploration into Appraisal • And Appraisal into development in 2007 • Portfolio contains: bankable production, Appraisal projects to increase reserves, low risk step-out exploration and Company-making exploration projects (up to 100 bcf net potential to be tested in 2007 alone).