1 / 8

Watershed TP Limit Setting Process and Modeling

Watershed TP Limit Setting Process and Modeling. Steve Weiss MPCA. Background. Old Policy (in general) State Rule – “affect” Restrict new discharge Wait for TMDL approval by EPA 2009 Petition to remove NPDES delegation TP Limits not restrictive enough Reasonable Potential (RP)

Download Presentation

Watershed TP Limit Setting Process and Modeling

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Watershed TP Limit Setting Process and Modeling Steve Weiss MPCA

  2. Background • Old Policy (in general) • State Rule – “affect” • Restrict new discharge • Wait for TMDL approval by EPA • 2009 Petition to remove NPDES delegation • TP Limits not restrictive enough • Reasonable Potential (RP) • Water Quality Based Effluent Limits (WQBELs) • New Policy (in general) • Federal Regulations – “cause or contribute” • Apply WQBELs prior to TMDL completion.

  3. Process 1. Estimate Load Sources • Point sources – simple • Nonpoint • Landcover – EMC • Load monitoring – Flux 2. Estimate Necessary Reductions • Consider other TMDLs • Lakes and reservoirs • Bathtub – simple tool, results compatible with standards • Rivers – near future • HSPF output, load duration curves, mass balance

  4. Process (Continued) 3. Slice the Pie • 4 scenario sequence • Current • NPDES Weighted • Nonpoint Weighted • Balanced

  5. Sauk River Watershed Routing Diagram No Significant NPDES Permittees NPDES Permittees NPDES Permittees City of Osakis Nonpoint source Runoff Nonpoint source Runoff Nonpoint source Runoff Nonpoint source Runoff Lake Osakis Bath tub model TBC Sauk Lake Bath tub model TBC SRCL Bath tub model completed Inflow WQ TP<100ug/L Inflow WQ TP = 60 ug/L Inflow WQ TP<100ug/L Outflow WQ TP ~ 40 Outflow WQ TP ~ 40 ug/L Outflow WQ TP=54 ug/L Includes Sauk R. & other minor tribs SR Watershed Outlet TP=100 ug/L

  6. Sauk River Chain of Lakes (SRCL) • 11 NPDES Permittees • 4 MNG49’s • Lake Modeling Completed • Sauk River < 60ug/L TP Summer Avg. • 68% reduction to Sauk River

  7. Final Thoughts • Optimally WQBEL = WLA • If your watershed has NPDES permits, check w/ Marco or me about TP limits. • HSPF / SWAT output very useful for limit setting process, especially with Rivers

More Related