1 / 27

SUBSTATION MODELING: PROTECTION AND AUTOMATION

SUBSTATION MODELING: PROTECTION AND AUTOMATION. JOEL MCDANIEL – SPRING TERM: 2014 SEMESTER PROJECT FOR ECE-544 SUPERVISORY CONTROL AND CRITICAL INFRASTRUCTURE SYSTEMS UNIVERSITY OF IDAHO – DEPARTMENT OF ELECTRICAL & COMPUTER ENGINEERING. THIS PRESENTATION COVERS BASIC ASPECTS OF.

darice
Download Presentation

SUBSTATION MODELING: PROTECTION AND AUTOMATION

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. SUBSTATION MODELING: PROTECTION AND AUTOMATION JOEL MCDANIEL – SPRING TERM: 2014 SEMESTER PROJECT FOR ECE-544 SUPERVISORY CONTROL AND CRITICAL INFRASTRUCTURE SYSTEMS UNIVERSITY OF IDAHO – DEPARTMENT OF ELECTRICAL & COMPUTER ENGINEERING

  2. THIS PRESENTATION COVERS BASIC ASPECTS OF • POWER DISTRIBUTION SUBSTATION PHYSICAL LAYOUT • POWER SYSTEM MODELING • COMMON POWER SYSTEM STUDIES • HUMAN-MACHINE INTERFACE (HMI) STRUCTURE AND PURPOSE

  3. SUBSTATION COMPONENTS AND OPERATION • UTILITY SUPPLY • HIGH SIDE BREAKER WITH PROTECTIVE RELAY • TRANSFORMER WITH PROTECTIVE RELAY • LOW SIDE BREAKER WITH PROTECTIVE RELAY • 4.16kV BUS • FEEDER BREAKERS WITH PROTECTIVE RELAYS

  4. Single Line Diagram of Substation as Rendered by ETAP v 12.5 Power System Modeling Software

  5. POWER SYSTEM MODELING • WHY DO WE MODEL POWER SYSTEMS? • PLANNING • PARAMETER AND DATA ESTIMATION • EQUIPMENT EVALUATION • HOW DO WE MODEL POWER SYSTEMS? • HAND CALCULATIONS • MODELING SOFTWARE (ETAP, SKM, ASPEN, …..)

  6. COMMON POWER SYSTEM STUDIES • LOAD FLOW STUDY • WHAT IS LOAD FLOW? • HOW IS LOAD MEASURED? • END GOAL OF A LOAD FLOW STUDY? • SHORT CIRCUIT STUDY • WHAT IS SHORT CIRCUIT STUDY? • HOW IS SHORT CIRCUIT CURRENT DETERMINED? • HOW IS THIS INFORMATION USEFUL? • PROTECTIVE DEVICE COORDINATION • WHAT IS A PROTECTIVE DEVICE? • HOW AND WHY DO WE COORDINATE PROTECTIVE DEVICES?

  7. LOAD FLOW RESULTS(ONE-LINE DIAGRAM WITH LOAD FLOW RESULTS)

  8. SHORT CIRCUIT RESULTS(ONE-LINE DIAGRAM WITH SHORT CIRCUIT RESULTS)

  9. RELAY COORDINATION STUDYTIME CURRENT COORDINATION CURVES • TRANSFORMER PROTECTION AND THE 4.16kV MAIN BREAKER PROTECTION

  10. RELAY COORDINATION STUDYTIME CURRENT COORDINATION CURVES (Continued) • COORDINATION BETWEEN 4.16kV MAIN AND MOTOR FEEDER RELAY

  11. RELAY COORDINATION STUDYTIME CURRENT COORDINATION CURVES (Continued) • COORDINATION BETWEEN 4.16kV MAIN AND STATIC FEEDER RELAY

  12. RELAY COORDINATION STUDYTIME CURRENT COORDINATION CURVES (Continued) • GROUND FAULT COORDINATION

  13. RELAY COORDINATION STUDYTIME CURRENT COORDINATION CURVES (Continued) • NEUTRAL ELEMENT COORDINATION

  14. DEVICE COMMUNICATIONSUSING WONDERWARE INTOUCH HMI DEVELOPMENT SOFTWARE • WHAT IS HMI? • WHY DO WE USE HMI? • COMMUNICATION PROTOCOLS? • PROPRIETARY • MODBUS VIA ETHERNET • DNP-3 • WHAT ISSUES DRIVE THE DESIGN OF A PARTICULAR HMI?

  15. INTOUCH HMI SCREENS • BASIC 1-LINE VIEW OF POWER SYSTEM VIA HMI SCREEN

  16. INTOUCH HMI SCREENS(CONTINUED) • SAMPLE LOGIN SCREEN

  17. INTOUCH HMI SCREENS(CONTINUED) • ENTER USER CREDENTIALS • ACCESS LEVELS / PERMISSION MENU

  18. INTOUCH HMI SCREENS(CONTINUED) • LOGGED IN!! NOW LET’S GO TO WORK!

  19. INTOUCH HMI SCREENS(CONTINUED) • 1-LINE DIAGRAM – FROM HERE, THE USER CAN NAVIGATE/CONTROL THE SYSTEM AS NEEDED

  20. INTOUCH HMI SCREENS(CONTINUED) • HIGH SIDE CIRCUIT BREAKER AND PROTECTIVE RELAY

  21. INTOUCH HMI SCREENS(CONTINUED) • MAIN POWER TRANSFORMER DISPLAY – HIGH AND LOW SIDE CURRENTS

  22. INTOUCH HMI SCREENS(CONTINUED) • TRANSFORMER DIFFERENTIAL RELAY (SEL-387)

  23. INTOUCH HMI SCREENS(CONTINUED) • 4.16kV MAIN BREAKER AND ASSOCIATED PROTECTIVE RELAY (SEL-351S)

  24. INTOUCH HMI SCREENS(CONTINUED) • STATIC LOAD FEEDER AND PROTECTIVE RELAY (SEL-351S)

  25. INTOUCH HMI SCREENS(CONTINUED) • MOTOR FEEDER WITH SEL-710 MOTOR PROTECTION RELAY

  26. CONCLUSIONS • WHAT DID I LEARN? • BASIC HMI STRUCTURE • TOOLS FOR BUILDING HMI (WONDERWARE – IN TOUCH) • COMMON PROTOCOLS USED WHEN IMPLEMENTING HMI • COMMON PROBLEMS WHEN IMPLEMENTING HMI / SCADA SYSTEM

  27. THE END