Division of Engineering Presented By: Terry Becker Date: 12-12-2012. Alamo power plant – unit 2. Agenda and Overview. Introduction Project Location Summary of Work Project Timelines Project Budgets Project Considerations. Introduction. Background
E N D
Division of Engineering Presented By: Terry Becker Date: 12-12-2012 Alamo power plant – unit 2
Agenda and Overview • Introduction • Project Location • Summary of Work • Project Timelines • Project Budgets • Project Considerations
Introduction • Background • Purpose: Install Second Generating Unit at Alamo Power Plant to maximize the generation capacity of water that is delivered through the East Branch of the California Aqueduct • Alamo Power Plant • Located on the East Branch of the California Aqueduct bifurcation • Plant was constructed between 1982 and 1985, operational 1986 • 133-FT Static Head Differential between Tehachapi Second After Bay and Pool 43 of CA. Aqueduct • Turbine Generation Unit 1: • Kaplan Type Turbine • 18 MW Generation Capacity, downgraded to 16 MW post TEA construction • Plant Hydraulic Capacity is 3150 cfs, 1740 cfs for Unit 1 and 1410 cfs for Unit 2 • Turbine Generation Unit 2: • To Be in Future Contract (Francis Turbine)
General Map - EastBranch Aqueduct Tehachapi Mountains Teerink Pumping Plant BuenaVista Pumping Plant Tehachapi East Afterbay Edmonston Pumping Plant Alamo PowerPlant Chrisman PumpingPlant Oso PumpingPlant Pearblossom Pumping Plant West Branch East Branch
Alamo Powerplant • Existing Kaplan Turbine Unit No.1 • Void left for future FrancisTurbine Unit No. 2
Alamo Powerplant • Existing Kaplan Turbine Unit 1
Alamo Powerplant • & EL. 2948 • Existing Kaplan Turbine Unit 1 Generator Shaft
Alamo Powerplant • Existing Unit 1 Penstock in the Generator Cooling Room
Alamo Powerplant • Existing Unit 1 Penstock in the Coupling Chamber • Watertight door
New Francis Turbine GENERAL PLAN Existing Tehachapi East After Bay New Surge Tank Existing 12 Ft Diameter Penstock PROFILE
Alamo Powerplant - Layout Existing hatch and location of Kaplan Unit 1 New Francis Unit 2 Alamo Powerplant
Scope of Work 12 FT Diameter Penstock Electrical Generator Civil Engineering Connect Existing Penstock to new turbine unit Construction of concrete containment of new turbine unit Construction of new surge tank Additional Site Work - Civil Mechanical Engineering Install Francis Turbine Unit and all pertinent features Electrical Engineering Electrical Generator Excitation Governor Control System Protection System Additional Site Work - Electrical Sleeve couplings Encase Reducer in Existing Opening Francis Turbine Fill void in existing Building with concrete
Project Budget Project Cost * Note: Benefit/Cost Ratio without enlargement of the East Branch = 1.28
Project Considerations • Power Acquisitions • Right of Way • Environmental • FERC • Confined Space • High Voltage Hazards during Testing and Startup
New Francis Turbine GENERAL PLAN Existing Tehachapi East After Bay New Surge Tank Existing 12 Ft Diameter Penstock PROFILE