1 / 17

Steel Tube Summit 2011 Boiler Industry - User Perspective

Steel Tube Summit 2011 Boiler Industry - User Perspective. Sustainable Solutions in Energy and Environment. To be a globally respected high performance organization offering sustainable solutions in energy and environment. Vision. Our Belief.

darren
Download Presentation

Steel Tube Summit 2011 Boiler Industry - User Perspective

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Steel Tube Summit 2011 Boiler Industry - User Perspective Sustainable Solutions in Energy and Environment

  2. To be a globally respected high performance organization offering sustainable solutions in energy and environment Vision

  3. Our Belief “Profit is not only a set of figures, but of values.” Rohinton D. Aga 1935 - 1996 Founder Chairman, Thermax

  4. Thermax Evolution • Established in 1966 as Wanson (India) • Rs. 5,000 Crore Group with sales & service network in Asia, Middle East, Africa, Europe and the Americas. • Manufacturing facilities in India and China. • Supports customers in over 75 countries with solutions to conserve energy and preserve the environment.

  5. Our Core Business THERMAX Boilers & Heaters Cooling & Heating Power Generation Chemicals & Water Air Pollution Control Renewable Enviro • ESP & Bag filters • Scrubbers • Air purification • Retrofit & Revamp Turnkey Power Plants • Solid fuel based • Gas based combined cycle • Waste heat recovery based • RE based incl. Biomass, Bagasse, solar, etc. • O&M of power plants Cooling • Exhaust & Multi-energy fired chillers • Steam fired chillers • Hot water fired chillers • Direct fired chillers Chemicals • Ion exchange resins • Cooling water chemicals • Fireside chemicals • Polyelectrolyte Water and wastewater • Wastewater & Effluent water treatment systems • Water recycling • Waste management Solar • Heating • Cooling Boiler & Heater • Package boilers • Large capacity power boilers • Thermal oil / water heaters • Energy recovery systems Heating • Steam/Hot water power plants • Packaged solid/oil/gas fired boilers • Fired thermic fluid heaters • Exhaust waste heat recovery boilers

  6. THERMAX - Boiler Business Industrial Boilers - Present • Capacity - Max 500 T / Hr, • 165 Kg / cm2 pressure range, • 570 deg C Utility Boilers • Capacity – Max 1000 T / Hr, • 180 Kg / cm2 pressure range, • 570 deg C Critical and Super Critical range of Boilers • For and up-to 1000 MW.

  7. BOILER TUBES / PIPES - APPLICATION • Smoke Tubes • Boiler Panels • In bed tubes • Convection Bank • Super-heater • Re-heater • Economizer • Air Preheater • Mineral Oil Heaters • Fired Heaters • Header’s • RCDC • Internal Piping

  8. Boiler Tubes / Pipes Grades • Types of Grades • Seamless Carbon & Alloy Steel Tubes SA 210 A1 , SA 213 T 11, T12, T22, T23 , T 91 and T92 • Seamless Carbon & Alloy Steel Pipes SA 106 Gr B , Gr C, SA 335 P11, P22 & P91 • ERW Tubes BS 3059 , Part I / II , Gr 320/360 • Air Preheater Tubes IS 6323 , Part V , NKLM • Stainless Steel Tubes SS 304 / 316 / 316 L / 430 TI • Tube Sizes • OD 31.75 mm OD to 101 mm OD • Thickness range of 3.25 mm to 10 mm • Maximum length 13 meter

  9. Industry Scenario Growing Industries Stagnant, Contracting Industries Cement Paper & Pulp Textile Power Generation Tea Steel Automobile Refineries & Petrochemical Oil & Gas Sponge Iron Chemicals Plywood Non Ferrous Hospitality Pharma Packaging Food Man Made Fiber Edible Oil Beverage

  10. Power Scenario • Installed Capacity as on 31st March 2011 – 174,364.4 MW • Per Capita Energy consumption (2008-09) – 733.54 Kwh / year • Per Capita Global Energy Consumption – 2,340 Kwh / year (USA – 15,000 Kwh / year, China – 1,800 Kwh / year) • Thermal Power generation – 65% ( 113,337 MW) • “POWER FOR ALL” Mission • Target to add by 2012 (end of 11th Plan) – 78,000 MW(could be curtailed to 58,000 MW) • Power required by 2020 – 400,000 MW by 2030 – 950,000 MW • A significant reason for missing capacity addition for the 10th & current 11th five year plan has been equipment shortage “Boiler”.

  11. Power Capacity Addition Plan

  12. Source Countries for Tubes & Pipes China Japan Germany France Spain Italy Romania

  13. Market Expectations • Deliveries Boiler supply completion • Process Boilers up-to 10 TPH (Tubes – BS 3059) Required within Current Performance • < 1 TPH : 8 Weeks 10-12 Weeks • 1-6 TPH : 12-14 Weeks 16 Weeks • 7-10 TPH : 16 Weeks 22 Weeks • Bi-drum Boilers • 15-25 TPH : 7 Months 9 Months • Power Boilers • 200 TPH 12 months Tubes are expected on 3rd month from the O date in plant • 500 T / Hr 18 months Tubes are expected on 4th month from the O date in plant

  14. Market Expectations Deliveries • Heaters • 8 - 10 Mkcal/hr : 5 Months 8 Months • Europe manufacturers’ take 3/4 months , • China supplies within 2 / 3 months. • Indian manufacturers’ For Carbon Steel Tubes 4 / 6 months. However, there are in-ordinate delays. On Alloy Steel tubes There no firm commitment. • Allocation of capacities OCTG vs Boiler • Competition from China – is now a reality to the Indian Boiler manufacturers !!! Also there is a substantial price difference ?

  15. Market Expectations Availability • Along with schedule pipes – Heavy sizes above 14” & extra wall thickness like 28 mm, 35 mm , 40 mm , 60 mm thk seamless pipes for higher pressure ranges for Headers • T11, T22 & T 91 seamless tubes & P11 , P22 , P91 – heavy thick seamless pipes with straightness requirement of 3 mm / meter • Availability of alloy steel tubes / pipes from Indian mills on a firm schedule basis. Quality • For Seamless Tubes/ Pipes – Improvement in surface coating/treatment • For ERW tubes/ Pipes – Improvements in Stenciling / Surface finish desired. • Value addition - Finning facility , Tube bending by Tube manufacturers ?

  16. Market Expectations Others • Fixed Prices • Latent defects – Warranty / Guaranties (as desired by end users) • Completion of a Boiler with assembly-wise 100% tubes supply of fixed length – No waiting time on the shop floor – cycle time reduction • Regular production update with status on Billet / Strip availability to plan in house production • Documentation – As desired.

  17. Thank you