Demand Response Reserve Project

Demand Response Reserve Project. Robert B. Burke NEPOOL Markets Committee February 8, 2005. The Projects. Two concurrent aspects: Performance Acquire performance data Validate Demand Response performance Using existing IBCS OS infrastructure Dispatch & Telemetry Methodology

daryl-lane
Download Presentation

Demand Response Reserve Project

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Demand Response Reserve Project Robert B. Burke NEPOOL Markets Committee February 8, 2005

  2. The Projects • Two concurrent aspects: • Performance • Acquire performance data • Validate Demand Response performance • Using existing IBCS OS infrastructure • Dispatch & Telemetry Methodology • Determine method to interface with ISO dispatch software • Determine telemetry requirements & solution

  3. Program • Operate for 1 year • 50 MW total enrollment • SWCT & NEMA only • Reduce in 30 minutes • Registered in RT 30 minute Demand Response • Less than 5 MW • Activated during Shared Activation Reserves (SAR) events • Forward Reserve Auction price • Performance payment / penalty

  4. Program Design * Settlement Only Generators change registration to RTDR

  5. Program Design (continued)

  6. Program Design (continued)

  7. Program Design (continued)

  8. Dispatch & Telemetry • Investigate concurrently with Performance portion of project • Determine information required by ISO • Examine alternatives • Lower cost compared to RIG & SCADA

  9. Next Steps • ISO complete White Paper • Present update to Markets Committee • February 8 • Discuss funding alternatives • Tax – all load (RTLO & NL); something else