70 likes | 315 Views
Overview of AC 150/5300-18B. Where to Start. Understand the survey requirements as specified in the SOWAirport Geodetic Control (2.6.10.1) Runway (2.6.10.2)Navigational Aid (2.6.10.3)Obstacle Analysis (2.7)Vertically Guided Surfaces (2.7.1)Obstacle criteria (2.7.1.2) Non-Vertically Guided Surfaces (2.7.1.3)Obstacle criteria (2.7.1.4).
E N D
1. NGS role in supporting to FAA
2. Overview of AC 150/5300-18B What information you, as the SME, are expected to Identify, Collect and Deliver
What information you, as the SME, are expected to Identify, Collect and Deliver
3. Where to Start What information you, as the SME, are expected to Identify, Collect and Deliver
What information you, as the SME, are expected to Identify, Collect and Deliver
4. Airport Obstruction Chart
5. Airport Safety Critical Data
6. Chapter 5: Data Content Standard and Specifications What information you, as the SME, are expected to Identify, Collect and Deliver
What information you, as the SME, are expected to Identify, Collect and Deliver
7. The Big Picture
8. 150/5300-18B Data Content Standard