Bi-monthly update on UMass Boston construction projects, including workforce diversity, M/WBE participation, upcoming projects, and budget details.
E N D
Boston-Access & Opportunity Committee Bi-Monthly Report January 19, 2016 The University of Massachusetts Building Authority Patricia A. Filippone, Executive Director
UMBA Staffing Director of Capital Projects – Joe Naughton Capital Projects Coordinator – Sean Regan Compliance Analyst – Maggie Drouineaud
UMass Boston Project Labor Agreement Projects • University Hall • Stage: Construction • Estimated Construction Cost: $105 M • OPM: Joslin, Lesser + Associates • CM: Gilbane, Inc. • Steve Duvel, Senior Project Executive • Jim Driscoll, Senior Project Manager • Danielle Skilling, EEO Compliance Officer • Utility Corridor and Roadway Relocation • Stage: Bidding/Construction • Estimated Construction Cost: $148 M • OPM: Joslin, Lesser + Associates • CM: BOND • Bob Mischler, Project Executive • Mike Spodek, Senior Project Manager • Elio DiBiase, Project Manager • Samantha Bond, Assistant Project Manager
Workforce Utilization Snapshot *Veterans goal was not established in the PLA and is measured on a “Best Faith Efforts” basis.
MBE/WBE Construction Business Participation *Some firms are both M and WBE.
University Hall Project – to – Date M/WBE Update • Boston Residents 34% • Minority 30 % • Female 6% • Veterans 5% • M/WBE 13% • Percentage of Contracts Awarded-to-date – 100 %
General Academic Building 1 Results by Trade –Project to Date
GAB 1 Workforce Diversity December 2015 Project-to-Date • Residents – % • Minority – % • Female – % • Veterans – % June 2015 • Residents – % • Minority – % • Female – % • Veterans – %
Utility Corridor & Roadway Relocation Project Project – to – Date M/WBE Update • Boston Residents 29 % • Minority 24% • Female 7% • Veterans 3% • M/WBE 14 % • Percentage of Contracts Awarded-to-date 97%
Utility Corridor and Roadway RelocationResults by Contractor – December 2015
Utility Corridor and Roadway RelocationResults by Trade – December 2015
Utility Corridor and Roadway RelocationResults by Trade – Project to Date
Utility Corridor & Roadway Relocation Project Project-to-Date • Boston Residents – % • Minority – % • Female – % • Veterans – % Month of June • Boston Residents – % • Minority – % • Female – % • Veterans – 0% *Graph courtesy of Policy Group on Tradeswomen Issues (PGTI)
Upcoming UMBA Projects at UMass Boston • Renovation of Existing Academic Buildings • Stage: Schematic Design • Construction Commencement – Temporarily on hold • Project Budget = $75 million • OPM: Hill International • Architect: Cannon Design • Energy Producing Facility • Stage: Entering Design Development • Construction Commencement – Summer 2016 • Project Budget = $32 million • OPM: Jacobs • Architect: Cambridge 7 • CM: Gilbane • Parking Garage • Stage: Study • Construction Commencement – Summer 2016 • Project Budget = $45 million • OPM: Skanska • Residence Hall • Stage: Study • Construction Commencement – Summer 2016 • Project Budget = $120 million