1 / 13

Project: IEEE P802.15 Working Group for Wireless Personal Area Networks (WPANs)

Project: IEEE P802.15 Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [ TG8 Closing Report ] Date Submitted: [ September 18, 2013 ] Source: Myung Jong Lee [CUNY ], Huan-Bang Li [NICT], Suhwook Kim [LG Electronics]

deacon
Download Presentation

Project: IEEE P802.15 Working Group for Wireless Personal Area Networks (WPANs)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Project: IEEE P802.15 Working Group for Wireless Personal Area Networks (WPANs) Submission Title:[TG8 Closing Report] Date Submitted: [September 18, 2013] Source:Myung Jong Lee [CUNY], Huan-Bang Li [NICT], Suhwook Kim [LG Electronics] Address Dept of EE, CUNY, 140th St, New York, NY 10031] Voice:[+1-212-650-7260], FAX: [+1-201-650-8249], E-Mail:[lee@ccny.cuny.edu] Re: [.] Abstract:[] Purpose:[Report of TG8 activities during September 2013 Interim Meeting at Nanjing] Notice: This document has been prepared to assist the IEEE P802.15. It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor acknowledges and accepts that this contribution becomes the property of IEEE and may be made publicly available by P802.15.

  2. TG8 PAC Closing Report September 18, 2013 Myung Lee TG8 Chair Huan-Bang Li, Suhwook Kim TG8 Vice-chair

  3. Meeting Objectives Technical Proposal Classification Discussion on PAC Framework Document Harmonization among proposals Discussion on Project Plan

  4. Achievements • 7 time slots used at this meeting • 5 Proposals related enhancing and missing simulationshave been presented • DCN 485r0: Simulation Results for Final Proposal 15-3-0380 (Qing Li) • DCN 518r0: Performance evaluation for query-based discovery (Suhwook Kim) • DCN 529r0: New Simulation Results on PAC Discovery (Huan-Bang Li) • DCN 486r0: Enhancing and missing simulation result for PAC operating in synchronous mode (PHY) (HyungjinKim) • DCN 487r0: Enhancing and missing simulation result for PAC operating in synchronous mode (MAC) (Soojung Jung)

  5. Achievements (cont) • 2 Proposals related channel model and TGD have been presented • DCN 407r1: Comment and resolution to TGD (Marco Hernandez) • DCN 492r0: Comment and resolution for system level simulations in TGD (Marco Hernandez) • 4 proposals related technical issue have been presented • DCN 508r0 : multi channel operation (Jinyoung Chun) • DCN 553r0 : Technical Discussion on Peer Discovery (Seung-Hoon Park) • DCN 557r0 : Interference Avoidance Issues for the Distributed Controlled Multiple Peer Networks (Seong-Soon Joo) • DCN 559r0 : Revisit the Rational of Fully Distributed Coordination (Seung-Hoon Park)

  6. Achievements (cont) • Discussion on “Template of Proposal Categorization” • Doc. 427r3: Byung-Jae Kwak, Shannon Park • Continuing discussion on “Summary of E-mail Discussion on PAC technical Issues” • DCN 520r5: Byung-Jae Kwak, Shannon Park

  7. Plan for November Meeting • Discussed items in “Summary of E-mail Discussion on PAC technical Issues” • Discussion on Network Synchronization • Discovery type • Discovery ID: SS Joo • PHY issues (Duplex: Marco, Multiplex, Multiple access, channelization) • Application-specific network management: Qing • Blue name in each item will initiate e-mail thread before the 1st teleconference

  8. Plan for November Meeting • TG members who has comments on any technical issue are strongly recommended to join/initiate discussion in e-mail reflector • Items in “Summary of E-mail Discussion on PAC technical Issues” is 1st priority of discussion on reflector • All TG members who has technical proposal which is categorized in DCN 520r5 are recommended to prepare report for discussion on technical issue for November meeting and prepare text for PFD if possible

  9. Plan for November Meeting • First Teleconference: • October 15, Tuesday 8:00PM US EDT (9 AM WED KOREA/JAPAN) • Agenda: Discussion on pre-fixed items based on e-mail threads • Second Teleconference: • October 29, Tuesday 9:00 AM US EDT (10 PM TUE KOREA/JAPAN) • Agenda: Discussion on harmonization report is possible

  10. Timeline TG formation Mar 12 Call for Application April 12 Application presentation May 12 TGD approval/Call for proposal Jan 13 Re-affirmation of TGD/Call for proposal March 13 Preliminary proposal presentation May, 13 Final proposal presentation July 13 PAC Framework Document/Call for contribution Nov. 13 Contribution presentation March 14 Draft spec (P802.15.8 D1.0) complete/Letter Ballot Sept 14 LB Comment resolution/ LB recirculation Nov 14 Sponsor Ballot July 15 RevCom submission Jan 16

  11. Motion Move to accept “Comment and resolution to TGD” (DCN: 407r1) as part of Technical Guidance Document (9.4.1.1 ES/N0 Calculation) (DCN: 568r7) Moved by: Marco Hernandez Seconded by: Seung-Hoon Park Result: y-8 n-0 a-2 Motion passed

  12. TG8 PAC Officers Chair: Myung Lee (CUNY) Vice Chair: Huan-Bang Li (NICT), Suhwook Kim (LGE) Editors: Seung-HoonPark (Samsung), Byung-Jae Kwak (ETRI) Secretary pro tem SeungKwon Cho (ETRI)

  13. Thank you!

More Related