PETRONAS MARITIME SERVICES SDN BHD presentation on

PETRONAS MARITIME SERVICES SDN BHD presentation on. PETRONAS SHIP VETTING PROCESS. Our History. 1988 – Marine Dept was introduced in PETRONAS 1990 – Department was renamed Marine Safety Dept, under the E&P Division of PETRONAS

dean-knight
Download Presentation

PETRONAS MARITIME SERVICES SDN BHD presentation on

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PETRONAS MARITIME SERVICES SDN BHDpresentation on PETRONAS SHIP VETTING PROCESS

  2. Our History • 1988 – Marine Dept was introduced in PETRONAS • 1990 – Department was renamed Marine Safety Dept, under the E&P Division of PETRONAS • 1994 – PETRONAS Maritime Services Sdn Bhd (PMSSB)was formed . Setting up and commissioning KPSB and SUPSB and Upstream

  3. 1996 – Marine Services Dept was formed in PMSSB with 5 surveyors. Ship Vetting was introduced. First database constructed by Avonautical – VIS Version 1.0 • 1997 – Policy on Maritime Activities were codified and given assent

  4. PETRONAS POLICY ON MARITIME ACTIVITIES Authority to Approve PMSSB is vested with the authority to exercise its expertise on behalf of PETRONAS when any reference to the requirement of an approval by PETRONAS is made in the Policy.

  5. Sect. 5.0 of the Policy: Vessels calling at PETRONAS Terminals and Vessels which are to be chartered by Operators for the carriage of petroleum or petrochemical products in bulk, shall be vetted by PMSSB

  6. PMSSB POST 1997 • buy-in from traders • Lesser upstream, more vetting • PMSSB begins to enforce Vetting requirements • VIS version 2.0 developed by GIRM to cater the increased volume.

  7. 2002 – High volume of inspections forced a re-structure within PMSSB which resulted in an independent Ship Vetting Dept headed by a manager reporting directly to the CEO. • 2005 – That baton was handed over to current Manager Taufiq Ben Sari • Nov 2005 – Certified as an ISO 9001-2000 by BVQI workscope Ship Vetting. • Dec 2005 – VIS Version 3.1 (web-based) was officially launched .

  8. Our Current Strength • Ship Vetting currently has 1 Manager, 1 full time Screener, 4 full time Inspectors , 6 vetters and 2 Admin Supervisors. • PMSSB has since November utilised the services of two 3rd Party Inspecting Companies. • Zenith Marine – based in PMSSB’s office - 4 inspectors. • Redstar Marine Services (Singapore) – 4 inspectors . • Reports submitted to the SIRE Program. • Average Inspection per month = 60 - 70 Inspections • Average 6 inspections per Month per Inspector • Total - 720 inspections / year

  9. Inspections statistics.

  10. What’s new? • PMSSB has since 01st Oct 2007 revised the inspection tariff. • In April 2007- VIS database has been upgradeed to Version 3.2 and the Version 3.3 will be rolled out in Feb/Mar 2008. • All PETRONAS Inspectors are now SIRE accredited and able to submit reports to the SIRE database.

  11. SHIP VETTING PROCESS

  12. PETRONAS VETTING PROCESS INTERNAL CHARTERER SCREENING SHIP OWNER / OPERATOR INSPECTION PETRONAS TERMINAL / PORT Request for inspection EVALUATION STATUS

  13. PETRONAS VETTING PROCESS Documentation check - PETRONAS database (VIS) - SIRE latest report - Other database (Equasis, Maritime Data) - Class Report - Other Oil Majors Report - Terminal Feedback - Port State Control database SCREENING

  14. PETRONAS VETTING PROCESS • Physical inspection / verification conducted by PMSSB Approved inspector • PMSSB uses the OCIMF VIQ 4th Edition Rev 1 2007 as a guideline during the inspection. INSPECTION

  15. PETRONAS VETTING PROCESS • Deliberate on findings & determine status • PANEL Review (Evaluation committee ) • consisting 2 Senior Vetters & the Manager. • Deliberate on inspection findings and • inspector report • Seek clarification if required • Decide on acceptability of corrective action • or responses • Determine the vessel status and its validity • (Vessel validity ranges from 1-24 mths) EVALUATION Ship owners / ship operators must submit their comments toh the attending inspector when responding to the inspection observations.

  16. PETRONAS PREFERED METHOD OF ADDRESING ANY OBSERVATIONS RAISED • Define the situation - Identify & describe the problem • Eg. T & P Corrections have not been applied to voyage charts • Fix / Quick fix - Temporary Repair • Eg. T&P Corrections were immediately applied • Identify root cause(s) • Eg. 2/0 had not applied the corrections as required by companys directive. • Take Long Term Corrective action • Eg. Raise a NC in the safety committee meeting. • Enter T&P as an item in the arrival checklist or passage plan • Evaluate & Follow up • Ensure that long term corrective action in place will prevent recurrence

  17. INSPECTION Requirements: • No inspection at doorstep (PETRONAS Terminals & ports) • Meet inspection request notice : Malaysia / Spore = 4 working days Other countries = 7 working days • Inspection during daylight hours ( approx 6-8 hours) • Within port limit under safe environment • No inspection at drydock Vessel which has just completed docking shall be required to complete 1 loading and 1 discharging before an inspection can be considered. • Submit the official request via website http://shipvett.petronas.com.my/ • Vessel of 20 yrs and abv shall hold a minimum of CAP Rating 2 for:- - Structural, machinery system and cargo system. - Vessels abv 10000 Dwt shall include a Fatigue Analysis . - Submission must be received 14 days in advance before the - proposed inspection date. • Vessel more than 25 years old will not be considered

  18. Mr. Taufiq BEN Sari - (Manager) Tel (Off) 603-2275 6780 Hp (24hrs) 6-019-3242148 Email :taufiq@petronas.com.my Capt Richard E Gomez - Tel: 603-22756781 - HP: 6012-2361003 - email: richardgomez@petronas.com.my Capt. Shahrul Azran - Tel: 603-2275 6784 - HP: 6019-4137679 - email: shussi@petronas.com.my Ship Vetting Department

  19. THANK YOU