1 / 13

Tier-2 Planning

Tier-2 Planning. History GridPP2 Planning Current Questions Future Planning. History. Lots of Hardware provided to Institutes through (S)HEFCE/JIF/JREI/SRIF... Little or no manpower support (System Managers already overloaded) GridPP1 Proposal had NO Tier-2 hardware or manpower request

debra-brady
Download Presentation

Tier-2 Planning

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Tier-2 Planning • History • GridPP2 Planning • Current Questions • Future Planning GridPP8 Tier-2 Planning

  2. History • Lots of Hardware provided to Institutes through (S)HEFCE/JIF/JREI/SRIF... • Little or no manpower support (System Managers already overloaded) • GridPP1 Proposal had NO Tier-2 hardware or manpower request • Towards end of 2002 agreed with PPARC Oversight Committee that we could half fund 4 Tier-2 support staff for the last year of GridPP1 • Currently being recruited GridPP8 Tier-2 Planning

  3. GridPP2 Planning • Support of Tier-2 given much higher priority in GridPP2 Proposal • Group institutes into 4 'regional Tier-2's' • London – Brunel, Imperial College, QMUL, RHUL and UCL • NorthGrid – CLRC Daresbury, Lancaster, Liverpool, Manchester, Sheffield • ScotGrid – Durham, Edinburgh, Glasgow • SouthGrid – Birmingham, Bristol, Cambridge, Oxford, RAL PPD GridPP8 Tier-2 Planning

  4. UK Tier-2s Tier-2 Regional Centres: ScotGrid NorthGrid SouthGrid London Grid GridPP8 Tier-2 Planning

  5. Existing Hardware • PP Share is ~ 75% of CPU, 88% of disk • Average KSI2000/CPU ~ 0.42 (~ 1GHz PIII) Existing hardware (1 April 2003) GridPP8 Tier-2 Planning

  6. Existing Hardware Some was earmarked for specific experiments and some for all experiments at that institute GridPP8 Tier-2 Planning

  7. Future Hardware Estimated hardware (September 2004) Estimated hardware (September 2007) How much for PP and how much for LCG, EGEE etc? (later) GridPP8 Tier-2 Planning

  8. Hardware Request • In the GridPP2 Proposal assumed that existing/future institute hardware will be sufficient (estimated to be worth £7.9M – not £3.0M as in proposal) • We requested £200k for 'interface hardware' between Tier-2s and Tier-1 GridPP8 Tier-2 Planning

  9. Manpower The main GridPP bid was for manpower to operate the Tier-2s We said that 4 of these were existing posts and requested 16 new posts (of which 4 are presumably continuation of the current 4 half posts) Note: Experiment support was supposed to be in experiment's own bids GridPP8 Tier-2 Planning

  10. Manpower The envisaged Specialist Support roles were (with current expertise): • Security Officer (Operational) 1 FTE (NorthGrid/SouthGrid) • Resource Broking 1 FTE (London) • Networking 1 FTE (London/NorthGrid) • Grid Data Management 2 FTE (ScotGrid) • VO Management & Services 1 FTE GridPP8 Tier-2 Planning

  11. Reduction Scenarios For the GSC presentation I prepared two reduction scenarios: GridPP8 Tier-2 Planning

  12. Resources for LCG • We have estimates of the total hardware from now to 2007 • Are these realistic? Have to assume so. • How much will PP get? (as function of time) • How much will be 'on the Grid’ • LCG • EGEE • What Tier-2 resources will be available for LCG-1? • SLL - 30% of total in 2004 to 60% in 2007 • Gives 3152 CPU + 338 TB in 2005 (Optimistic?) • JCG – 25-50% of a couple of sites per Tier-2 • Gives 1131 CPU + 100 TB in 2005 (Pessimistic?) • Do we assume that the resource contribution to LCG (PP) is the same as to EGEE (+other disciplines)? GridPP8 Tier-2 Planning

  13. Future Planning • Once we get a firm GridPP budget • Agree a reduction scenario (presumably) • Define in detail the manpower roles • Define allocation procedure (~ hardware in place on 1 June 2004?) • Need to agree (procedure for) hardware numbers for LCG/EGEE and other enquiries i.e. LCG(t) is ε(t) x Total (t) • what is ε(t)? • How do we interoperate with e-Science Level-2 Grid? • Need dialogue between Tier-2 'managers’ (and Tier-1) GridPP8 Tier-2 Planning

More Related