1 / 59

CDBG Applicant’s Workshop Neighborhood Revitalization Session

CDBG Applicant’s Workshop Neighborhood Revitalization Session. CDBG Neighborhood Revitalization. Types of Grants Single Activity : Housing Activities Only Multi-Activity : Housing PLUS Infrastructure Activities. 2. CDBG Neighborhood Revitalization. Assessing Needs

Download Presentation

CDBG Applicant’s Workshop Neighborhood Revitalization Session

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CDBG Applicant’s WorkshopNeighborhood Revitalization Session

  2. CDBG Neighborhood Revitalization • Types of Grants • Single Activity: • Housing Activities Only • Multi-Activity: • Housing PLUS Infrastructure Activities 2 December 12-14, 2012

  3. CDBG Neighborhood Revitalization • Assessing Needs • What are the needs community wide? • Are there concentrations of substandard housing? • Determine the project area (“TARGET AREA”) December 12-14, 2012

  4. CDBG Neighborhood Revitalization Housing Activities December 12-14, 2012

  5. Single ActivityNeighborhood Revitalization • Only Addresses Housing Activities • May Include Several Activities • Rehabilitation • Reconstruction • Acquisition • Relocation • Demolition/Clearance December 12-14, 2012

  6. Single ActivityNeighborhood Revitalization • Who May Receive Assistance: • Individual or Family Home-Owners (Owner Occupants). • Absentee Owners (Landlords). • Owner Occupants must meet Low-Moderate Income definitions. • Must possess clear Deed to property. • Property must be within Applicant Jurisdiction. December 12-14, 2012

  7. Single ActivityNeighborhood Revitalization • Limit of $500,000. • May be City/County Wide, Target Area, or Targeted to a Specific Group • Elderly • Handicapped • Working Families with Children December 12-14, 2012

  8. Eligible ActivitiesSingle Activity Neighborhood RevitalizationMaximum $500,000. • Rehabilitation – To repair and/or bring to Code existing substandard housing unit. • Reconstruction– Where Infeasible to Rehab, Demolish and construct new unit on same site – Owner Occupied ONLY. • “New” Construction - Construction of new unit on different site. December 12-14, 2012

  9. Eligible ActivitiesSingle Activity Neighborhood RevitalizationMaximum $500,000. New Construction is NOTeligible unless as “last resort” OR Approved Community Based Development Organization is used. December 12-14, 2012

  10. Eligible ActivitiesSingle Activity Neighborhood RevitalizationMaximum $500,000. • Acquisition - of Real Property • Disposition – Costs Incidental to Disposing of Property Acquired with CDBG Funds • Code Enforcement December 12-14, 2012

  11. Eligible ActivitiesSingle Activity Neighborhood RevitalizationMaximum $500,000. • Clearance – Of Dilapidated Structures, out-buildings, and Other Items • Interim Assistance • Relocation – Temporary or Permanent • Removal of Architectural Barriers December 12-14, 2012

  12. Eligible ActivitiesSingle Activity Neighborhood RevitalizationMaximum $500,000. • Home Ownership Assistance • Down Payment • Closing costs NOTE: DCA policy mandates use of fixed rate mortgages on all CDBG funded projects December 12-14, 2012

  13. Eligible ActivitiesRevitalization Area Strategy (RAS) Maximum $800,000. • Officially adopt a local Redevelopment Plan in accordance with the Urban Redevelopment Act O.C.G.A. 36-61 • Eligible area of Census Block Group(s) of 20% or greater poverty level. • Develop strong local partnerships focusing local resources within the Revitalization Area. • Submit application for designation to DCA. • Must be designated by DCA through application December 12-14, 2012

  14. CDBG Neighborhood RevitalizationApplication Review Process • Application Read and Reviewed by the Housing Panel • Rank and Score based on: • Feasibility of Project • Strategy Proposed • Impact of Project December 12-14, 2012

  15. Feasibility Considerations • Property Standards • Outside Services and Resources committed • Lead Based Paint (LBP) • Funding Sources and Commitments • Operation Oversight • Maps and Overview • Selling Your Project • Costs December 12-14, 2012

  16. Feasibility ConsiderationsMinimum Property Standards • Realistic Minimum Property Standards – you determine what standards you want in your community. • Property Standards vs. Construction Standards. • Code Violations and Incipient Violations. • First priority should be given to Health, Safety, and ADA compliance. December 12-14, 2012

  17. Feasibility ConsiderationsOutside Services and Resources • Identify service required and what service will be rendered. • Establish estimated cost. • Procure a FIRM commitment letter specifying on-going services on a cost-per-hour or per project basis. December 12-14, 2012

  18. Feasibility ConsiderationsLead Based Paint (LBP) • LBP evaluation is required on any structure built before 1978. • Evaluation services must be performed by an inspector/risk assessor licensed and certified by the State of Georgia. • Be prepared to seek services outside your local area. Consider travel and other expenses when preparing your estimate. December 12-14, 2012

  19. Feasibility Considerations Lead Based Paint (LBP) • Lead hazard control can be costly, budget 25% of estimated rehab cost. • Lead hazard control work must be performed by qualified workers – See the EPA Renovation and Remodeling Final Rule (EPA RRP Rule. • Demonstrate understanding of regulation requirements. December 12-14, 2012

  20. Feasibility Considerations Funding, Partnerships, Other Resources. • Obtain FIRM commitment letters from all parties. • Ensure that the commitment letters are issued and signed by authorized individuals. • Pledges of support without commitment letters will not be considered. • Indicate how each will be applied, at what point will these funds be released. • Home -Owner Participation contributions if required. • General Property Improvements (GPI) are not funded by CDBG. • Secure firm, convincing documentation of participation from investor-owners. December 12-14, 2012

  21. Feasibility Considerations Schedules and Time tables • Who will provide Project oversight? • Develop and show a schedule of start and completion dates. Indicate milestones and inspection points. December 12-14, 2012

  22. Feasibility Considerations Contracting and Construction • Can be a very problematic area. • Qualifying contractors: establish guidelines and criteria. • “Work Write-Up” and “Scope of Work”. • Bidding process and bid acceptance protocol. • Contract negotiations. • Change Orders protocol. • Draw Request and approval process. December 12-14, 2012

  23. Feasibility Considerations Maps and Photos • DCA Form 12 instructions spells out what is required on map. • Map should be in common scale. • Show details in subject area(s): existing structures, street names, schools, landmarks, etc. • Photographs must indicate Unit number or vista. • Indicate status of structure (e.g. occupied, vacant, absentee owner/rental, non-targeted structure). • Indicate rehab, reconstruction, or clearance. • INCLUDE FINANCIAL PLAN FORM (EXHIBIT H) December 12-14, 2012

  24. Feasibility Considerations Maps and Photos (cont.) • Photographs. • Show all 4 elevations if possible. • Interior photos should clearly represent condition of structure and problems described in narrative. Annotate photo. • Photographs of the owner, his or her family, children, in-laws, family pets, neighbors, automobiles, etc. are not required. December 12-14, 2012

  25. Street Names Unit Numbers December 12-14, 2012

  26. Unit # 10 - Left Front View December 12-14, 2012

  27. Unit #10 Interior Roof Leak Damage – Living Room December 12-14, 2012

  28. Feasibility Considerations Selling it to DCA • Exactly WHAT will this project achieve. • Exactly WHY do you need this project. • Exactly WHO will the project impact. • Exactly HOW you will accomplish the project. • Exactly WHERE the target area(s) are located. • DATA, we love data! BE SPECIFIC! December 12-14, 2012

  29. Feasibility Considerations • Financing Technique(s) AGAIN - BE SPECIFIC • Deferred Payment Loans • Leveraged Loans/Interest Buy Downs • Who are your partners • Include participation formula • Know your community! Be realistic with participation formula December 12-14, 2012

  30. Feasibility Considerations • Confirmation of proposed resources and partners • Compliance with Applicable Laws • Investor Owner Eligibility • Financing: 50%, DPL at full term. • Rent Regulatory Agreement • Timetable for proposed accomplishments December 12-14, 2012

  31. Feasibility Considerations Unit by unit analysis of proposed activity • Include per unit cost estimate. • Include description of proposed work needed with pictures illustrating problems (exterior and interior). Annotate photos. • Complete “Financial Plan” Form (Appendix H) • Include address on Financial Plan December 12-14, 2012

  32. Revised Strategy Criteria for 2013 • Applications will be compared on their support for comprehensive neighborhood revitalization or target population needs. • Competitive applications willplan to address most or all target area or target population community and economic development needs using CDBG and locally driven approaches. • Documentation and results measures are important. December 12-14, 2012

  33. Strategy Considerations Describe Severity of problems • Demonstrate needs in Narrative AND with Pictures Alternatives to Strategy • Discuss other possible strategies and why the proposed strategy is best for problems described. “Do nothing” is only an uncreative solution. December 12-14, 2012

  34. Strategy Considerations • Discuss plan to prevent re-occurrence of problems addressed in grant proposal. • Adoption of policies or ordinances. • Code enforcement • More stringent codes • Ongoing maintenance December 12-14, 2012

  35. Strategy Considerations Marketing of Program • Who has expressed interest in Program? • How will Interested be generated? • Are residents supportive of the program? • Document Commitment from Owner Occupants and Investor Owners! December 12-14, 2012

  36. Impact Considerations Impact Of Project • Document severity of need. • Describe the effect the proposed project will have on the identified needs as well as the community as a whole. • Indicate Number of persons who will benefit. • Overall CDBG Cost per person. December 12-14, 2012

  37. Successful StrategiesFinancial Participation Owner Participation as Fixed Amount as Determined by Annual Income: Example: “Participants below 30% AMI will be required to pay $500 towards of the cost of their rehab” Example: “Participants between 30% and 50% AMI will be required to pay $1000 towards of the cost of their rehab” December 12-14, 2012

  38. Successful Strategies • Mandatory Homebuyer Counseling • Credit Counseling • Employment training • Holistic approach to neighborhood revitalization • Address issues and concerns along with housing/infrastructure problems December 12-14, 2012

  39. Compliance with Regulations Acquisition • Easements for Public Facility Improvements • Dilapidated Units • Uniform Relocation Act (URA) December 12-14, 2012

  40. Compliance with Regulations Relocation – Permanent • Uniform Relocation Act (42 months) • Owner OR Tenant • 104(d) “Barney Frank” (60 Months) • Tenant Only (Rent to Rent) • One for One Replacement December 12-14, 2012

  41. Compliance with Regulations • Identify Available Resources • Comparable Units • Provide Basis for Relocation • Current vs. available rents rates December 12-14, 2012

  42. Compliance with Regulations “New Construction” Eligibility • Last Resort • No Available Resources Exist • Application must provide credible evidence. • Cheaper to build (including parcel) than purchase. • Not-for-profit or for-profit developer • Approved Community-Based Development Organization. December 12-14, 2012

  43. For Target Area(s), Make sure you . . . Provide a Unit by Unit Analysis • Keyed to Map • Picture(s) of Units (Exterior and Interior) • List of Deficiencies for Targeted Units December 12-14, 2012

  44. For Target Areas, Make sure you . . . Provide Cost Estimates: • Keep in Mind that Actual work may be 1 or 2 years away….Budget Appropriately. • Provide reasonable estimates for each unit based on complete walk through. • Budget for Lead Hazard Control. (Program will pay all LBP Costs) December 12-14, 2012

  45. For Target Areas, Make sure you . . . Provide Target Area Data: • Total Number of Units. • Total Number of Substandard units. • Total Number of Dilapidated units. • Total Number of Owner Occupied. • Total Number of Renter Occupied. • Total Number of Vacant. December 12-14, 2012

  46. For City or County Wide Programs, Make sure you . . . • Describe how units were chosen in a fair and equitable manner. • Provide description of overall housing conditions jurisdiction wide - IMPORTANT • Overall assessment of need for Housing improvements and justification for the chosen units. • Scores for Applications lacking overall assessment are reduced. December 12-14, 2012

  47. Other Important things to Do • Provide Financial Plan!!! • In Narrative and on Form provided in Appendix H of Applicant Manual OR Exhibit H in Guidelines for Residential Rehabilitation Programs • Explain formula for Owner Participation Amounts. December 12-14, 2012

  48. Be sure to use this Revision December 12-14, 2012

  49. Things NOT TO DO • Work in Previous CDBG Target Areas or Units. • Propose 100% Grants or 100% DPL’s. • Propose Assistance to Landlords that exceeds 50% of Rehab Cost (Not including Lead Hazard Control). • Include Elected Officials or their family members without full disclosure in the application (Conflict of Interest). December 12-14, 2012

  50. Things NOT TO DO • Exceed $5,000 TOTAL COST to Rehab a Manufactured Housing Unit (MHU) without VERY strong justification. (Advance approval from DCA Required.) • Prepare grant request based on Maximum funds available rather than needs identified. December 12-14, 2012

More Related