General Information: TOTAL AREA - 40000 sq.m. TERRITORY – 10 hectares.

General Information: TOTAL AREA - 40000 sq.m. TERRITORY – 10 hectares. MASTERPLAN. FIRST LEVEL PLAN. Construction systems: Industrial building: -Structure – concrete columns ( 12*18 m step), 9m high. -Walls – concrete plates , double glass windows

deepak
Download Presentation

General Information: TOTAL AREA - 40000 sq.m. TERRITORY – 10 hectares.

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. General Information: TOTAL AREA - 40000 sq.m. TERRITORY – 10 hectares.

  2. MASTERPLAN

  3. FIRST LEVEL PLAN

  4. Construction systems: Industrial building: -Structure – concrete columns ( 12*18 m step), 9m high. -Walls– concrete plates , double glass windows -Floors - monolith concrete, flat, painted. -In some spaces (15%) there are technologic tunnels 60*60sm for engineering network. Administrative block: -Structure – 3 leveled building with concrete columns (6m step). -Floors – concrete, marble, tiles, linoleum, laminate.

  5. ADMINISTRATIVE BLOCK . FACADE

  6. INDUSTRIAL BUILDING . FACADE / RENOVATION

  7. EXTERNAL SPACE

  8. INTERIOR INDUSTRIAL BUILDING

  9. Engineering equipment: 1-External engineering network Highway M4 (Moscow-DON) from Moscow 220 km 2-Water supply system: City water network (pipe d=300 mm) in 30m from administrative building wall. Input- plastic pipe d=70 mm goes into concrete reservoir (2*250=500m3), then network pump by steel pipes. There are 3 chinks and a pump –for the moment preserved. 3-Drainage system: Industrial complex is supplied with Underground canalization network in concrete wells. The system works in city cleaning network. There is also acid-alkaline canalization with the neutralized station. 4-Heating: Industrial building and administrative block – water heating system 5-Ventilation: Influx - extract. Ventilators - on the mezzanine and on the roof of the industrial building. 6-Air-conditioning: There are 30 split systems in the industrial complex. 7-Heating supply: There is gas boiler house with 2 boilers (КВГМ-10 - 10 000 Gkal each). The heat goes by the still tubes d=270 mm.

  10. Engineering equipment: 8-Power electric equipment: The industrial complex works on electro station N 68 with 2 underground lines. There are 7 transformation stations ( Power 1MBT). 9-Lighting: The interior lighting - pendant luminescent lamps. There is also external lighting on the territory of the industrial building. 10-Communication networks: The industrial building works on 2 city communication networks. Also there is Internet access and internal computer network. 11-Complex of technical systems of protection There is a complex of technical systems of protection in the industrial complex 12-Fire protection: There is a local fire system of the alarm system of some spaces of factory with an access to the central checkpoint. There are two circles of the fire pipeline; external is equipped by hydrants, internal – fire hydrants.