1 / 12

Post Mortem readiness TC 25-11-2005

Post Mortem readiness TC 25-11-2005. Post Mortem Analysis readiness. Adriaan Rijllart, Boris Khomenko, Alessandro Raimondo, Hubert Reymond. Post Mortem Analysis for QPS IST. Outline. PM data flow Individual system analysis Data viewer and analyser Status Planning Demo. PMA: Data flow.

deiondre
Download Presentation

Post Mortem readiness TC 25-11-2005

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Post Mortem readiness TC 25-11-2005 Post Mortem Analysis readiness Adriaan Rijllart, Boris Khomenko, Alessandro Raimondo, Hubert Reymond PM readiness TC, Adriaan Rijllart

  2. Post Mortem Analysis for QPS IST Outline PM data flow Individual system analysis Data viewer and analyser Status Planning Demo PM readiness TC, Adriaan Rijllart

  3. PMA: Data flow PMA report PMA PM Analysis Alarms Files on PM server Logging QPS PC PIC Systems LHC arc SSS1 D1 D2 D3 SSS2 D4 D5 D6 PM readiness TC, Adriaan Rijllart

  4. PMA: Four levels of analysis • 4. Event analysis • Transient+alarms • Generate event report Alarms Logging • 3. Interactions analysis • Sequence of events • Logging • Delays • 2. Individual system analysis • Status flags • Time stamps/sync • Waveform analysis • 1. Data format recognition • Header • Data structure QPS PC PIC PM readiness TC, Adriaan Rijllart

  5. PMA: Data selection for QPS Using QPS info file Info file viewer, with pointers to data files for direct access. PM readiness TC, Adriaan Rijllart

  6. PMA: Analog and digital graphs QPS quench heater supply discharge test. Analog graph with selection, hide and zoom functions. First cursor locked on trigger-time. Digital graph that remain synchronised with the analogue plot during zooming. PM readiness TC, Adriaan Rijllart

  7. PMA: Multi-graph Threshold test. Two analogue graphs with different scales and one digital for faster visual inspection. PM readiness TC, Adriaan Rijllart

  8. PMA: QPS data table view Table view of data file with quick selection of columns of interest (Selected in graphs, external signals, …) PM readiness TC, Adriaan Rijllart

  9. PMA: Logging and Alarms • Logging data is accessed from the PMA program by a Perl interface to Oracle from LabVIEW. • Alarm data will be accessed through a SDDS dump file produced by the LASER system. Logging Alarms PM readiness TC, Adriaan Rijllart

  10. PMA: Status • 4. Event analysis • Transient+ logging+alarms • Generate event report Alarms Logging • 3. Interactions analysis • Sequence of events • Delays Done • 2. Individual system analysis • Status flags • Time stamps/sync • Waveform analysis • 1. Data format verification • Header • Data structure QPS PC PIC PM readiness TC, Adriaan Rijllart

  11. PMA: Agenda of meetings • 28-11-05: Power Converter - Stephen and Quentin • Current and voltage analysis • PC state analysis • 2. 29-11-05: QPS - Reiner and Felix • Other controllers than AMC • 3. 02-12-05: PIC - Markus, Bruno and Robert • PIC signal analysis requirements • 4. 08-12-05: SACEC • PMA discussion • 5. Data import from sequencer? Not yet defined. PM readiness TC, Adriaan Rijllart

  12. PMA: Demo PMA viewer/analyser System selection System Files QPS PC PIC PM readiness TC, Adriaan Rijllart

More Related