An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. DemoSat IV Launch Readiness Review 4/21/06 -David Gooding -Erik Andersen -Anna Vigil -Matt Elsner -Augustine Trujillo

  2. Mission Description • Successfully launch and land a payload that deploys a rover capable of taking pictures while traveling around the landing site autonomously. DemoSat IV

  3. Mission Goals and NASA Benefits • Box land on one of three designated sides. • Be the first team to have box open and rover travel out of box independently. • Rover maneuver around objects correctly. • Rover travel around for at least 10min taking at least 15 pictures. • Encourage learning and team building for students. • A simplistic design is utilized to perform a complicated experiment. • Design techniques allow the payload to land and traverse in nearly all terrains.

  4. System Requirements • Weight Specification - 1800g • Sense landing autonomously - micro switches • Carrier must open autonomously and upright - rat traps • Rover must drive out of carrier autonomously - program • Rover must take pictures of landing site - program DemoSat IV

  5. Carrier Rover Detect Emitter PIC Running During Flight Turn Camera On Initialize Pins Switches Pressed Run motor program: Forward DemoSat IV 10 Min Elapsed? No No: reset Object Sensed? Yes Send Signal to Emitter Yes Send Signal to Motors to Stop Signal to motor to open box Take Picture Turn

  6. Subsystem Description Rover • Oopic/ microcontroller board • Two gear boxed motors • Motor driver • IR Sensor • Camera • IR Detector • Batteries Carrier • Micro switches • PIC 16F819 • Emitter • Transistor switch • Box switches • Micro motor • Batteries

  7. Subsystem Description: Carrier • Micro switches – Sense landing. Must be pressed for a continuous 5 minutes. • PIC – Once 5 min has elapsed a signal is sent to turn on emitter. • Emitter – Emit IR signal to detector on Rover to turn it on. • Transistor switch – The base is being saturated allowing voltage to flow through it to the motor. • Box switches – Manual opening and closing. • Micro motor – Opening/closing mechanism for carrier. • Batteries – 1-9v for PIC, 2-AA for motor.

  8. Schematic of Subsystem: Carrier DemoSat IV

  9. Subsystem Description: Rover • IR Detector – Sense emitter to turn Rover on. • OOPic/ microcontroller board – Object oriented with built in functionality to perform extensive electronic commands. • Gear boxed motors – 6 gear box motor. • Motor driver – Takes a PWM signal and converts it into speed and direction of 2 independent motors. • IR sensor – Sense objects: avoid obstacle / picture. • Camera – Take pictures of landing site. • Batteries – 1-9v for OOPic, 4-AA for motor drivers.

  10. Tamiya 6-Gearbox MD22 Motordriver Tamiya 6-Gearbox Camera Relay Circuit FlatFoto Digital Camera 3MP OOPic IR Detector IR Scanner (Sharp GP2D12) Block Diagram of Subsystem: Rover DemoSat IV

  11. Expenses DemoSat IV

  12. Mass Budget DemoSat IV

  13. Testing • Carrier opening • Micro motor with latch • Rover traction • Wheels with tracks and spikes • Drag test • Trash bag stayed in tact • Drop test • Rover stayed in place • Cold test • In Freezer for 1 ½ hours. No Voltage loss. DemoSat IV

  14. Full Function Test DemoSat IV

  15. Project Organization • David – Rover circuitry and programming • Erik – Mechanical design and implementation • Anna – Carrier electronics and programming • Matt – Carrier electronics + rover mechanics • Augustine – Carrier opening design and implementation. DemoSat IV

  16. Questions???