1 / 6

Ole’ Miss DOSAR Grid

Ole’ Miss DOSAR Grid. Institutional Analysis Center. Michael D. Joy. Current Hardware. 168GB Backplane Gigabit Switches Gigabit fiber connection to campus backbone 10GB Ethernet Capability Campus Backbone 10G Fiber Upgrade Possible 24 2.2Ghz Dual AMD Opteron Servers

deliz
Download Presentation

Ole’ Miss DOSAR Grid

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Ole’ Miss DOSAR Grid Institutional Analysis Center Michael D. Joy

  2. DOSAR ‘05

  3. Current Hardware • 168GB Backplane Gigabit Switches • Gigabit fiber connection to campus backbone • 10GB Ethernet Capability • Campus Backbone 10G Fiber Upgrade Possible • 24 2.2Ghz Dual AMD Opteron Servers • Equivalent to 3.4Ghz Intel Xeons • 8 TB Storage Server • 3 1.4Ghz Dual AMD Opteron Servers • Job Delegation • Administrative Servers DOSAR ‘05

  4. Current Status • Running Scientific Linux 4.1 x86_64 • Monitoring • Ganglia, Monalisa Running • VDT 1.3.6 Installed • /opt/vdt as per OSG standards • Still need to tailor UPS/UPD to point to this install • Condor needs configuring • Working on getting a grid certificates for Sam station setup DOSAR ‘05

  5. Backend • Currently the nodes are in standby until I get one node configured properly • Once one node is configured it will be used as a template to image the other nodes • Standard tools ‘dd’ piped through tftp will be used for imaging. Imaging takes approximately 20 min. • All nodes can be imagine simultaneously • Small issues such as host names / ip’s will be adjusted once imaged. • Authentication has been setup using LDAPS/Kerberos • NFS is running on the storage server • AFS cell is being created DOSAR ‘05

  6. To Do • Finish getting the Sam certificates straightened out • Get VDT tailored to the /opt/vdt directory • Configure Condor • Work on OSG/Voms once operational DOSAR ‘05

More Related