NOTE: REFERENCE SECTION 00200B FOR A COMPLETE SCOPE OF WORK REQUIRED – TYPICAL FOR ALL PHOTO SHEETS. P5. N. ADDENDUM 1 6/6/2013. P7. P6. P9. P10. P8. UPPER ROOF. UPPER ROOF. P11. HIGH ROOF. LOWER ROOF. P15. P15. P2. P4. P12. CFA P - THEATER. P1. P13. P19. LEGEND
E N D
NOTE: REFERENCE SECTION 00200B FOR A COMPLETE SCOPE OF WORK REQUIRED – TYPICAL FOR ALL PHOTO SHEETS. P5 N ADDENDUM 1 6/6/2013 P7 P6 P9 P10 P8 UPPER ROOF UPPER ROOF P11 HIGH ROOF LOWER ROOF P15 P15 P2 P4 P12 CFA P - THEATER P1 P13 P19 LEGEND AREAS TO BE REPOINTED, RE-CAULKED OR CRACKS TO BE REPAIRED (SEE PHOTO SHEETS FOR SPECIFIC SCOPE CLARIFICATIONS) LIMESTONE & CONCRETE TO BE POWERWASHED. ALSO, LIMESTONE & CONCRETE TO RECEIVE WATER REPELLANT (SEE PHOTO SHEETS) CONCRETE TO BE POWERWASHED ONLY (APPLICABLE TO BOTH SIDES OF LOADING DOCK WALLS – SEE PHOTO SHEETS) AREA TO BE POWERWASHED. ALSO, CONCRETE TO RECEIVE THOROSEAL WATERPROOF CEMENT-BASED COATING. COLOR SHALL BE GRAY AND SHALL BE APPLIED 8’ ABOVE UPPER ROOF ELEVATION AROUND ENTIRE HIGH ROOF PERIMETER. WATER REPELLANT SHALL BE APPLIED ABOVE THOROSEAL COATING. P14 LOADING DOCK WALLS P18 ADDENDUM 1 6/6/2013 P3 SEQUENCE OF WORK: 1. REPOINT LIMESTONE MORTAR JOINTS AS IDENTIFIED 2. RE-CAULK IDENTIFIED CAULK AREAS NOTE: DO NOT DISRUPT EXISTING CAULK JOINTS, TYPICAL 3. REPAIR CRACKS 4. PERFORM EXTERIOR CLEANING 5. APPLY WATER REPELLENT / COATING 6. WASH ALL WINDOWS CFA - DESIGN STUDIO CONCRETE PAVER PATIO P16 P17 WORK LOCATION PLAN N.T.S. CFA R - DANCE NOTE: REFERENCE PROJECT MANUAL DATED 01/04/13 FOR THE BALANCE OF PROJECT REQUIREMENTS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). DATE: 5/31/13 DWG. / PHOTO. NO. CFA P THEATER – EXTERIOR WATERPROOFING SECTION 00020 - EXISTING CONDITION PHOTOS REVISIONS WESLEYAN U N I V E R S I T Y Construction Services 170 Long Lane Middletown, CT 06459 P-104-1 ADDENDUM 1 6/6/2013 MAJOR MAINTENANCE FY 14
P1 REPOINT INDIVIDUAL MORTAR JOINTS AS SHOWN DATE: 5/31/13 PHOTO. NO. CFA J THEATER – EXTERIOR WATERPROOFING SECTION 00020 - EXISTING CONDITION PHOTOS REVISIONS WESLEYAN U N I V E R S I T Y Construction Services 170 Long Lane Middletown, CT 06459 P-104-2
P2 REPOINT ALL MORTAR JOINTS AT THE SOUTH WALL ELEVATION AS SHOWN WITHIN THE HATCHED AREA. DO NOT DISRUPT CAULK JOINTS. DATE: 5/31/13 PHOTO. NO. CFA J THEATER – EXTERIOR WATERPROOFING SECTION 00020 - EXISTING CONDITION PHOTOS REVISIONS WESLEYAN U N I V E R S I T Y Construction Services 170 Long Lane Middletown, CT 06459 P-104-3
P3 REPOINT INDIVIDUAL MORTAR JOINTS AS SHOWN ADDENDUM 1 6/6/2013 CONTRACTOR SHALL REPOINT ALL VERTICAL MORTAR JOINTS BELOW HORIZONTAL JOINT SHOWN CONTRACTOR POWER WASH ALLL EXPOSURES OF AND APPLY WATER REPELLENT TO BELOW GRADE STAIR TOWERS DATE: 5/31/13 PHOTO. NO. CFA J THEATER – EXTERIOR WATERPROOFING SECTION 00020 - EXISTING CONDITION PHOTOS REVISIONS WESLEYAN U N I V E R S I T Y Construction Services 170 Long Lane Middletown, CT 06459 P-104-4 ADDENDUM 1 6/6/2013
REPOINT ALL MORTAR JOINTS AT THE NORTH WALL ELEVATION AS SHOWN WITHIN THE HATCHED AREA (TOTAL OF 5 COURSES). DO NOT DISRUPT CAULK JOINTS P4 DATE: 5/31/13 PHOTO. NO. CFA J THEATER – EXTERIOR WATERPROOFING SECTION 00020 - EXISTING CONDITION PHOTOS REVISIONS WESLEYAN U N I V E R S I T Y Construction Services 170 Long Lane Middletown, CT 06459 P-104-5
REPOINT ALL MORTAR JOINTS AT THE EAST WALL ELEVATION AS SHOWN WITHIN THE HATCHED AREA (TOTAL OF 6 COURSES). DO NOT DISRUPT CAULK JOINTS P5 DATE: 5/31/13 PHOTO. NO. CFA J THEATER – EXTERIOR WATERPROOFING SECTION 00020 - EXISTING CONDITION PHOTOS REVISIONS WESLEYAN U N I V E R S I T Y Construction Services 170 Long Lane Middletown, CT 06459 P-104-6
UPPER ROOF REPOINT ALL MORTAR JOINTS 6 COURSES DOWN AT AS SHOWN WITHIN THE HATCHED AREA – INCLUDE CORNERS. REPOINT ALL MORTAR JOINTS AT THE EAST WALL ELEVATION AS SHOWN WITHIN THE HATCHED AREA P7 P6 ADDENDUM 1 6/6/2013 CONTRACTOR POWER WASH ALLL EXPOSURES OF AND APPLY WATER REPELLENT TO BELOW GRADE STAIR TOWERS DATE: 5/31/13 PHOTO. NO. CFA J THEATER – EXTERIOR WATERPROOFING SECTION 00020 - EXISTING CONDITION PHOTOS REVISIONS WESLEYAN U N I V E R S I T Y Construction Services 170 Long Lane Middletown, CT 06459 P-104-7 ADDENDUM 1 6/6/2013
4 FULL LIMESTONE BLOCKS P8 REPOINT ALL MORTAR JOINTS AT THE EAST WALL ELEVATION AS SHOWN WITHIN THE HATCHED AREA (4 FULL LIMESTONE BLOCKS FROM THE CORNER TO THE NORTH) DATE: 5/31/13 PHOTO. NO. CFA J THEATER – EXTERIOR WATERPROOFING SECTION 00020 - EXISTING CONDITION PHOTOS REVISIONS WESLEYAN U N I V E R S I T Y Construction Services 170 Long Lane Middletown, CT 06459 P-104-8
P9 P11 P10 P14 P13 P12 P8 REPOINT ALL MORTAR JOINTS AT THE EAST WALL ELEVATION AS SHOWN WITHIN THE HATCHED AREA (4 FULL LIMESTONE BLOCKS FROM THE CORNER TO THE NORTH) DATE: 5/31/13 PHOTO. NO. CFA J THEATER – EXTERIOR WATERPROOFING SECTION 00020 - EXISTING CONDITION PHOTOS REVISIONS WESLEYAN U N I V E R S I T Y Construction Services 170 Long Lane Middletown, CT 06459 P-104-9
HIGH ROOF SOUTH WALL ELEVATION THOROSEAL COATING 8’ PROTECT ROOF REPLACED 8/2012 UPPER ROOF WEST WALL ELEVATION UPPER ROOF HIGH ROOF SOUTH WALL ELEVATION 8’ THOROSEAL COATING P15 SOUTH ELEVATION: CRACK REPAIR, 3 LOCATIONS. REFERENCE SHEET C-3, DETAIL A FOR REPAIR REQUIREMENTS. EAST & WEST ELEVATIONS: NO REPAIRS APPLY THOROSEAL WATERPROOF CEMENT-BASED COATING 8’ ABOVE UPPER ROOF ELEVATION AROUND ENTIRE PERIMETER - COLOR SHALL BE GRAY APPLY WATER REPELLENT TO ALL ELEVATIONS – ABOVE THOROSEAL COATING. UPPER ROOF DATE: 5/31/13 PHOTO. NO. CFA J THEATER – EXTERIOR WATERPROOFING SECTION 00020 - EXISTING CONDITION PHOTOS REVISIONS WESLEYAN U N I V E R S I T Y Construction Services 170 Long Lane Middletown, CT 06459 P-104-10
NORTH WALL ELEVATION P15 NORTH ELEVATION: CRACK REPAIR AT BASE OF WALL, 5 LOCATIONS, DETAIL A ON SHEET C-3. CONCRETE/REBAR REPAIR, 1 LOCATION, DETAIL C ON SHEET C-3. APPLY THOROSEAL WATERPROOF CEMENT-BASED COATING 8’ ABOVE UPPER ROOF ELEVATION AROUND ENTIRE PERIMETER - COLOR SHALL BE GRAY. APPLY WATER REPELLENT TO ALL ELEVATIONS, ABOVE THOROSEAL COATING. THOROSEAL COATING PRIOR TO THE START OF WORK, PROTECT ROOF. ROOF WAS REPLACED 8/2012 8’ NORTH WALL ELEVATION UPPER ROOF UPPER ROOF DATE: 5/31/13 PHOTO. NO. CFA J THEATER – EXTERIOR WATERPROOFING SECTION 00020 - EXISTING CONDITION PHOTOS REVISIONS WESLEYAN U N I V E R S I T Y Construction Services 170 Long Lane Middletown, CT 06459 P-104-11
4 FULL LIMESTONE BLOCKS P16 REPOINT ALL MORTAR JOINTS AS SHOWN. REMOVE EXISTING CAULK AND RECAULK TREADS & RISERS WITHIN IDENTIFIED AREA SHOWN. DATE: 5/31/13 PHOTO. NO. CFA J THEATER – EXTERIOR WATERPROOFING SECTION 00020 - EXISTING CONDITION PHOTOS REVISIONS WESLEYAN U N I V E R S I T Y Construction Services 170 Long Lane Middletown, CT 06459 P-104-12
P17 REPOINT ALL MORTAR JOINTS AS SHOWN. REMOVE EXISTING CAULK AND RECAULK TREADS & RISERS WITHIN IDENTIFIED AREA SHOWN. DATE: 5/31/13 PHOTO. NO. CFA J THEATER – EXTERIOR WATERPROOFING SECTION 00020 - EXISTING CONDITION PHOTOS REVISIONS WESLEYAN U N I V E R S I T Y Construction Services 170 Long Lane Middletown, CT 06459 P-104-13
REMOVE FIRE ALARM BELL COVER AND CAULK AROUND PERIMETER OF CONDUIT PENETRATION – TYPICAL OF 2 LOCATIONS. REMOVE EXISTING CAULK ALONG THE ENTIRE VERTICAL HEIGHT OF THE LOADING DOCK RETAINING WALL. INSTALL NEW CAULK TO REPLACE REMOVED CAULK. P18 P19 DATE: 5/31/13 PHOTO. NO. CFA J THEATER – EXTERIOR WATERPROOFING SECTION 00020 - EXISTING CONDITION PHOTOS REVISIONS WESLEYAN U N I V E R S I T Y Construction Services 170 Long Lane Middletown, CT 06459 P-104-14
HIGH ROOF (NOT VISIBLE IN THIS PHOTO) UPPER ROOF LOW ROOF SOUTH ELEVATION PHOTO – FOR REFERENCE AND ORIENTATION DATE: 5/31/13 PHOTO. NO. CFA J THEATER – EXTERIOR WATERPROOFING SECTION 00020 - EXISTING CONDITION PHOTOS REVISIONS WESLEYAN U N I V E R S I T Y Construction Services 170 Long Lane Middletown, CT 06459 P-104-15
LOW ROOF LOW ROOF N PROTECT ROOF REPLACED 8/2012 SOUTH ELEVATION PHOTO – FOR REFERENCE AND ORIENTATION DATE: 5/31/13 PHOTO. NO. CFA J THEATER – EXTERIOR WATERPROOFING SECTION 00020 - EXISTING CONDITION PHOTOS REVISIONS WESLEYAN U N I V E R S I T Y Construction Services 170 Long Lane Middletown, CT 06459 P-104-16
UPPER ROOF LOW ROOF WEST ELEVATION PHOTOS – FOR REFERENCE AND ORIENTATION LOW ROOF DATE: 5/31/13 PHOTO. NO. CFA J THEATER – EXTERIOR WATERPROOFING SECTION 00020 - EXISTING CONDITION PHOTOS REVISIONS WESLEYAN U N I V E R S I T Y Construction Services 170 Long Lane Middletown, CT 06459 P-104-17
HIGH ROOF UPPER ROOF UPPER ROOF WEST ELEVATION PHOTO – FOR REFERENCE AND ORIENTATION DATE: 5/31/13 PHOTO. NO. CFA J THEATER – EXTERIOR WATERPROOFING SECTION 00020 - EXISTING CONDITION PHOTOS REVISIONS WESLEYAN U N I V E R S I T Y Construction Services 170 Long Lane Middletown, CT 06459 P-104-18
LOADING DOCK RETAING WALLS NORTH ELEVATION PHOTO – FOR REFERENCE AND ORIENTATION DATE: 5/31/13 PHOTO. NO. CFA J THEATER – EXTERIOR WATERPROOFING SECTION 00020 - EXISTING CONDITION PHOTOS REVISIONS WESLEYAN U N I V E R S I T Y Construction Services 170 Long Lane Middletown, CT 06459 P-104-19
UPPER ROOF HIGH ROOF UPPER ROOF UPPER ROOF LOW ROOF EAST ELEVATION PHOTO – FOR REFERENCE AND ORIENTATION DATE: 5/31/13 PHOTO. NO. CFA J THEATER – EXTERIOR WATERPROOFING SECTION 00020 - EXISTING CONDITION PHOTOS REVISIONS WESLEYAN U N I V E R S I T Y Construction Services 170 Long Lane Middletown, CT 06459 P-104-20
LOW ROOF EAST ELEVATION PHOTO – FOR REFERENCE AND ORIENTATION DATE: 5/31/13 PHOTO. NO. CFA J THEATER – EXTERIOR WATERPROOFING SECTION 00020 - EXISTING CONDITION PHOTOS REVISIONS WESLEYAN U N I V E R S I T Y Construction Services 170 Long Lane Middletown, CT 06459 P-104-21