60 likes | 169 Views
“ C E R N s hou l d under t a k e de s i gn s t ud i es f or a cc e l era t or pro j e c t s i n a g l obal c on t e x t , w i t h e m pha s i s on pro t on-p r o t on and e l ec tr on - pos itr o n h i gh - ene r g y fr on ti e r m ach i nes . ”.
E N D
“CERNshouldundertakedesignstudiesforacceleratorprojectsinaglobal context,withemphasisonproton-protonandelectron- positronhigh- energy frontiermachines.” Highestpossibleenergye+e- withCLIC (CDR2012) Multi-lateralcollaboration TechnologyDepartment(TE) PlenaryMeeting March’14
FutureCircularColliderStudy-SCOPE • CDRandcostreview forthenextESU(2018) • Formingan international collaborationtostudy: • pp-collider(FCC-hh) • defininginfrastructure requirements • ~16T100TeVppin100km • ~20T100TeVppin80km • e+e-collider(FCC-ee)as potentialintermediatestep • p-e(FCC-he)option • 80-100kminfrastructure • in Genevaarea TechnologyDepartment(TE) PlenaryMeeting March’14
Main areasofFCC design study Acceleratorsand infrastructure conceptualdesigns Technologies R&Dactivities planning Physics experiments detectors Hadroncollider conceptualdesign High-fieldmagnets LucaBottura Hadroncoll.physics experiments interface,integration Superconducting RFsystems Leptoncollider conceptualdesign e+e-coll.physics experiments interface,integration Cryogenics LaurentTavian Hadronand Brennan Goddardleptoninjectors e-- pphysics, experiments, Interface,integration Specifictechnologies JoséMiguel Jimenez Safety,operation, energymanagement environmentalaspects Infrastructure Planning TechnologyDepartment(TE) PlenaryMeeting March’14
“CERNshouldundertakedesignstudiesforacceleratorprojectsinaglobal“CERNshouldundertakedesignstudiesforacceleratorprojectsinaglobal context,withemphasisonproton-protonandelectron-positronhigh- energy frontiermachines.” CDRand Cost Review2018 today 2022 Project FCCStudy: p-ptowards100TeVFCC:FutureCircularColliders TechnologyDepartment(TE) PlenaryMeeting March’14
Goals • Identify 2 or 3 main topics for R&D projects • Name project leaders for each item • Properly cost and schedule the R&D projects (milestones, deliverables, manpower, etc.) • Identify potential collaborators and funding sources (Horizon 2020?) • FCC design study will inform, to a large extent, the areas where R&D will be required. At what juncture will this input become available?