Quick Overview Greenways 70+ miles Estimated 1 million users annually Sidewalks 400 + miles

Town of Cary Pedestrian & Bicycle Infrastructure Updates 4 th Annual Triangle Pedestrian & Bicycle Workshop Todd B Delk, PE Facilities Planning Engineer The Cary Theater May 2, 2014. Quick Overview Greenways 70+ miles Estimated 1 million users annually Sidewalks 400 + miles

demi
Download Presentation

Quick Overview Greenways 70+ miles Estimated 1 million users annually Sidewalks 400 + miles

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Town of Cary Pedestrian & Bicycle Infrastructure Updates 4th Annual Triangle Pedestrian & Bicycle Workshop Todd B Delk, PE Facilities Planning Engineer The Cary Theater May 2, 2014 Quick Overview Greenways 70+ miles Estimated 1 million users annually Sidewalks 400+ miles Bike Facilities 25 miles of roadway with striped lanes and sharrows 89 miles of signed routes Wide outside lanes standard on thoroughfares NEW 2014 BIKE & HIKE MAP!!!!

  2. Current Projects Greenways • 43 projects in the works • Additional 22.8 miles • $4,400,000 improvements funded by Community Investment Bonds (CIB) • White Oak Creek Phase V • Old Reedy Creek Trailhead • 2012 PRCR Master Plan – Priority Greenway Corridors Quick Overview Greenways 70+ miles Estimated 1 million users annually Sidewalks 400+ miles Bike Facilities 25 miles of roadway with striped lanes and sharrows 89 miles of signed routes Wide outside lanes standard on thoroughfares NEW 2014 BIKE&HIKE MAP!!!!

  3. Current Projects Greenways • 43 projects in the works • Additional 22.8 miles • $4,400,000 improvements funded by Community Investment Bonds (CIB) • White Oak Creek Phase V • Old Reedy Creek Trailhead • 2012 PRCR Master Plan – Priority Greenway Corridors Sidewalks • 17 projects in the works • $7,780,000 improvements funded by CIB • Walnut Street Bridge • W Chapel Hill Road • Old Apex Road Quick Overview Greenways 70+ miles Estimated 1 million users annually Sidewalks 400+ miles Bike Facilities 25 miles of roadway with striped lanes and sharrows 89 miles of signed routes Wide outside lanes standard on thoroughfares NEW 2014 BIKE&HIKE MAP!!!!

  4. Current Projects Greenways • 43 projects in the works • Additional 22.8 miles • $4,400,000 improvements funded by Community Investment Bonds (CIB) • White Oak Creek Phase V • Old Reedy Creek Trailhead • 2012 PRCR Master Plan – Priority Greenway Corridors Sidewalks • 17 projects in the works • $7,780,000 improvements funded by CIB • Walnut Street Bridge • W Chapel Hill Road • Old Apex Road Bike Facilities • $1,000,000 improvements funded by CIB • 28 additional miles of bike lanes and sharrows • Improved detection at signals • Bike lockers at Cary Depot • Bike & Hike App Quick Overview Greenways 70+ miles Estimated 1 million users annually Sidewalks 400+ miles Bike Facilities 25 miles of roadway with striped lanes and sharrows 89 miles of signed routes Wide outside lanes standard on thoroughfares NEW 2014 BIKE&HIKE MAP!!!!

  5. www.imaginecary.orgwww.caryhaveyoursay.com