2013/14 Plan of Work

2013/14 Plan of Work . Neil Stephens. Current Position. Originally final year of 3 year plan Plan extended by 1 year to align with HSE Business plan – 2014/15 = final year Priority sectors Small Sites (30%) – 37% delivered Refurbishment (25%) – 18% Asbestos (20%) – 19%

demitrius
Download Presentation

2013/14 Plan of Work

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 2013/14 Plan of Work Neil Stephens

  2. Current Position Originally final year of 3 year plan Plan extended by 1 year to align with HSE Business plan – 2014/15 = final year Priority sectors Small Sites (30%) – 37% delivered Refurbishment (25%) – 18% Asbestos (20%) – 19% Major Projects & Large Contractors Local Priorities

  3. 2013/14 Updates Priority sectors remain same Small Sites (increase to 35%) Refurbishment (25%) Asbestos (20%) Major Projects & Large Contractors Local Priorities

  4. Inspection initiative • Currently in last week of this year’s • Delivered over 2176 inspections so far* • Promoting – no change message on hard hats • Excellent regional media coverage • 2013/14 will take place in September 2013

  5. Fragile Materials Inspection by CD Inspection FOD Estates Excellence Busy Builder (type) Sheet CSkills videos WWT SHADs Ag SHADs ORR Research on human factor causes Trade articles Presentations (toolbox talk) 2013/14 New Field Projects

  6. 2013/14 field projects…….. • Fireplace Installation • VO led project • Tile Cutting (roof valley) • NRFC guidance • Health Risks in paving & block work • Noise • Havs • Silica • Asbestos Removal in Retail • Temp de-mountable structures and timber frame construction - continues

  7. Non - Field work examples • Clients Standard (or Charter) • Client Engagement on Nuclear Build/Estate • H&S and BIM - guidance • Lift installation and maintenance • Dust partnership • Visualisations (Elvis) • On-tool extraction • Resolving Face fit testing • COHME - revision