1 / 9

PIRC documentation structure proposal Yan Wang Huawei technologies

PIRC documentation structure proposal Yan Wang Huawei technologies. Clause 5: Architecture overview. Amend this clause with the following: Providing overview text introducing PIRC. Clause 6: MAC service and reference model. Amend this clause with the following:

demont
Download Presentation

PIRC documentation structure proposal Yan Wang Huawei technologies

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PIRC documentation structureproposalYan WangHuawei technologies 802-17c

  2. Clause 5: Architecture overview • Amend this clause with the following: • Providing overview text introducing PIRC 802-17c

  3. Clause 6: MAC service andreference model • Amend this clause with the following: • Description of the Protected Inter-ring Connection within MAC service model with appropriate description 802-17c

  4. Clause 9: Frame formats • Amend this clause with the following: • Provide new controlType for new control frame used by PIRC 802-17c

  5. Clause 11: Topology discovery and protection • Amend this clause with the following: • Definition of ATTs indicating PIRC station and the type of load balancing • Definition of the transmission of the new ATTs • By ATD? • Only for PIRC nodes? 802-17c

  6. Clause 12: Operations, administration, and maintenance (OAM) • Amend this clause with the following: • New control frame using by PIRC • New control frame format • DA, Protection group ID, Forwarding status, Failure indication, Configuration information, etc. • New control frame operations • Appropriate transmission interval • Only inter-ring nodes process the status message • Notify the status between the two inter-ring station (between peers and mates) • Assistant failure detection 802-17c

  7. Clause 14: Spatially aware sublayer • Amend this clause with the following: • Provide the description that SAS is needed in PIRC nodes 802-17c

  8. Clause 15: Protected Inter-ring Connection • New clause that describes PIRC functionality, methodology • Provide description of rings interconnection through dual-station homing • Basic operations, learning, forwarding, etc. • Principles of protection • Strict and relax loop prevention, Failure detection, Protection switch, Recovery, SDB pruning procedures, multiple failures, etc. • Principles of load balancing • Mandatory (Active/Standby) • Optional (VLAN Hash/Static Assignment by management/etc.) • Service primitive interactions • Provide maintenance commands • Etc. 802-17c

  9. Annex D: SNMP MIB definitions • Amend this clause with the following: • Provide definition of any PIRC specific MIBs. 802-17c

More Related