1 / 6

Software development news and problems.

Software development news and problems. Software/analysis meeting 22.10.05. E.Choumilov on behalf of OfflineSoftware group. Bug in the Birks’ law simulation codes of Geant3 (GBIRK routine) is corrected ( Z>1 were affected).

denna
Download Presentation

Software development news and problems.

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Software development news and problems. Software/analysis meeting 22.10.05. E.Choumilov on behalf of OfflineSoftware group.

  2. Bug in the Birks’ law simulation codes of Geant3 (GBIRK routine) is • corrected ( Z>1 were affected). • Better parametrization of Birks’ law is introduced (thank to V.Choutko). • It improves behaviour at high Z. The parameters were defined by fit to • TOF ions test-beam data. Now saturation effect is already visible for • carbon (z=6, ~ 10% effect) and rise to ~30% for aluminum(Z=13). • As the consequence new set of TOF dE/dX MC reference distributions • was generated (only for Z=1-9). Extension to higher Z-range have to be • done simultaneously with tracker (and other subdetectors). Particle • charge calculation algorithm should be modified to implement other • subdetectors measurements (RICH, TRD). • All TOF simulation/reconstruction/calibration software was modified to • implement new (final) readout scheme (gain-5 readout was removed both • for anodes and dynodes). DB files were recreated according to new • format. • 5) TOF SFET(A,C) boards temperature data handling algorithm have to be • developed for event-by-event time/charge corrections. Participation of

  3. TOF hardware group is absolutely needed. • Fast/level1 trigger configuration data (like mask of TOF paddles/sides • included in the trigger decision logic, TOF-layers AND/OR-ing scheme, • mask of subtrigger branches etc) were collected in one object and • introduced in DB-structure. ANTI/ECAL trigger configuration parameters • have to be added (need input from ECAL-group). • TOF-section of AMS online monitor was developed. The following • sections were developed earlier : LVL1, RICH, AxAMS (need to be • extended). • The ANTI, ECAL, TRACKER, TRD sections are still missing and wait • for volunteers (i can provide ANTI section also if there is no other • pretenders). • As an example few pictures from TOF-section are shown below.

More Related