An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Bilan and Objectives SU Dominique Missiaen

  2. Departures-Arrivals • Arrivals • Francis Klumb (ST) • Philippe Dewitte (ST) • Christophe Podevin • Sebastian Waniorek (FE) • Mathieu Duquenne (FE) • Petre Radut (VIA) • Michael Udzik (FSU) • Mehdi Belhay (FE) • Ales Hrabe (TECH) • Olivier Ggouabre Seri (TL) • Bruno Perret (TL) • 13 personsfrom the contract c201 • Departures : • Joanna Hulboj (FE) • Sylvain Griffet (FE) • Juha Kemppinen (FE) • Sylvain Mico (FSU) • Yann Bailly (VIA) • Mohamed Khamfir (TL) • Montse Montero (FE) • Christophe Podevin (end of August) • Bernard Noël (TL) ABP group meeting D. Missiaen

  3. Before LS1 • Alignment of K12 and Na62 : • 1st beam in November 2012 • Linac4 : • Fiducialisation of Components : RFQ, CCDTL, DTL, etc • 3MEV test stand : RFQ, diagnostic line • Tunnel : marking on the floor, alignment of the source and LEBT • LHC • Fiducialisation of 15 dipoles and 3 SSS • Levelling tests in sector 67 to prepair LS1 NA62  LAV, STRAW, MUV ABP group meeting D. Missiaen

  4. Before LS1 • low beta quads • Loadsensorsunder • Installation at PT 5 (100 %) and 2 (80%) • Visualisation under PVSS • Irradiation tests performedwithsuccess • Design of remote validation units for the HLS and WPS alignmentsystems • Prototypes validated (mechanics, electronics, acquisition and control) ABP group meeting D. Missiaen

  5. Experiments ALICE DCAL : Load test CMS : YE4 assembly LHCb Magnet : Photogrammetry With and without B ATLAS IBL / New beam pipe: Mock-up scale1 (H180) LEB : Preparation of beam pipe changes (ATLAS, CMS, LHCb LS1, ALICE LS2) ABP group meeting D. Missiaen

  6. NA62 – COMPASS – ALPHA – CAST – NA61 – ISOLDE – Others Non-LHC Experiments ALPHA  Full installation • Survey in multiple areas • All along the year ISOLDE  Survey of all lines CAST  Grid, Dynamic survey COMPASS: New RPD, RICH, Liquid H target … HIE-ISOLDE  Intégration 3D Scan Réunionannuelle 2012 D. Missiaen

  7. LS1- accelerators LHC : -Fastlevelling - Network machine-exp. for Atlas and CMS PSB : Vertical shape SPS : Vertical realignment of the «hole» of sextant 6 TI2: V and H realignment ABP group meeting D. Missiaen

  8. LS1 – accelerators (comingnext) • LHC : • LSSs and alignment of new components • Smoothing of the arcs fromSummernextyear • Maintenance of the permanent monitoring system of low beta quads • Installation of loadsensors and of validation systems for HLS and WPS in PT1 and 5 • SPS : • H and V realignment of all components • TI8 : H and V realignment of all components • TT10 • PS : Measurement/re-alignment of the PSR • Linac4 : • alignment of the components 3 MEV test stand in the L4 tunnel • Duringassemblychecks of CDDTL and DTL ABP group meeting D. Missiaen

  9. LS1 -Experiments • Main survey done • Geodetic networks • Stabilities ATLAS – CMS • Experiment Opening surveys • ATLAS EE Muon alignment completed • CMS Pixel / bulkhead-YE1 3D scanning CMS Pixel Survey CMS Bulkhead/YE1 3D Scan • Some tasks for the next future • ATLAS: Muon Barrel / Install. Muon Sector 13 / Start of Open Close Monitoring installation • CMS: MABs Calib. / YE4 assembly start / Upgrade BCAM / Prepa insertion beam pipe and Pixel CT • ALICE: Installation DCAL and new TRD mod. • LHCb: Installation of new Beam Pipe (Full length) • And many others operations foreseen in 2014 ATLAS: Muon Barrel ABP group meeting D. Missiaen

  10. Projects • CLIC • LAMBDA : validation of solution on short range • Development and validation of cammovers • Compact • Standard • Validation of the alignmentstrategy on the TBTM mock-up • Comparison of movementmeasuredwith CMM, WPS and AT401within 10 microns • Fiducialisation and active alignment : important progress • AbsolutemeasurementswithcWPS and oWPSwithin a few microns ABP group meeting D. Missiaen

  11. Projects • HIE-Isolde • Bcam monitoring system • Open/Close monitoring system for Atlas • CLIC • Development of cammovers: • Standard and compact to betestedunder 5 DOF • Compatibility withstabilization solution to bechecked • Lambda project: • Validation of the concept on short range using a veryaccuratedisplacement table • Dimensional control, fiducialisation and alignment on test setups: • On the TBTM (including control of alignmentduring thermal and transport tests) ABP group meeting D. Missiaen

  12. Projects • HIE-Isolde • Bcam monitoring system • Open/Close monitoring system for Atlas ABP group meeting D. Missiaen

  13. Projects (future) • CLIC • Development of cammovers: • Lambda project: • Validation of the concept on short range using a veryaccuratedisplacement table • Dimensional control, fiducialisation and alignment on test setups: • On the TBTM (including control of alignmentduring thermal and transport tests) • Collaboration with NIKHEF: • Inter-comparisonbetweenalignmentsystems on short & long range • Follow-up of the spoke design in MDI area • PACMAN project (Particle Accelerator Components’ Metrology and Alignment up to the Nanometrelevel) • Marie Curie Initial Training Network, Innovative Doctoral Programme ABP group meeting D. Missiaen

  14. Software and Database • The development of the APEX interface has been continued • Calculation menu • Measurements menu • Several versions of • Post-processing : LGC++, CHaBa++, • Data acquisition : SFB, PFB, carnet, Pctopo32 • Somedevelopmentswillbecontinuedduring LS1 ABP group meeting D. Missiaen

  15. Conclusions • A huge LS1 ahead of us • A good start for the first 4 months • Motivation willbevery the mostdifficultthing to maintain all along the 20 months • But not only LS1 • LC and HIE-Isolde studiesstill continue • Software and databasedevelopments as well ABP group meeting D. Missiaen