Manual HDL/LDL Override Summary for April QMWG

Discover unique HDL/LDL overrides captured in the March 2011 daily summary report. Identify reasons for manual overrides, including SPS activation and planned outage preparation, affecting total SCED executions.

dennisy
Download Presentation

Manual HDL/LDL Override Summary for April QMWG

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Manual HDL/LDL Override Summary for April QMWG

  2. Daily Summary for March 2011 • For this analysis, we captured unique HDL/LDL overrides • An override is considered unique if that same Resource did not have an override within the last 10 minutes

  3. Daily Summary for March 2011

  4. Reasons for Manual HDL/LDL Overrides • An override is considered unique if that same Resource did not have an override within the last 10 minutes • SPS Activation and Planned Outage Preparation were a smaller percentage of unique overrides, but cover a larger percentage of total SCED executions with overrides