1 / 13

Purdue Experimental Program

NEES Research Demonstration PI: S. Wood UT Austin Purdue University Experimental Program Co-PI: J. Ramirez Collaborators: M. Eberhard and T. Ranf UW Purdue Graduate Research Assistant: A. Makido. Purdue Experimental Program. f’ c = 5000 psi

denton-rush
Download Presentation

Purdue Experimental Program

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. NEES Research DemonstrationPI: S. Wood UT AustinPurdue University Experimental ProgramCo-PI: J. RamirezCollaborators: M. Eberhard and T. Ranf UWPurdue Graduate Research Assistant: A. Makido

  2. Purdue Experimental Program f’c = 5000 psi N = 0.08f’cAg (180 kips for Specimen 2 and 45 kips for Specimen 1)

  3. Test Set-Up

  4. Specimen 1- Bent Column Ag= 113 in2 ρg= 1.6 % ρs= 0.9 % (Specimen 1-1) = 0.6 % (Specimen 1-2) 16-#3 Bars 0.75 in. Cover ρg : reinforcement ratio ρs : volume ratio of spiral hoop to the core volume Spirals W2.9@ 1.25 in. (Specimen 1-1) W2.9@ 2.25 in. (Specimen 1-2) 12 in.

  5. Specimen 2- Single Column Ag= 452 in2 ρg= 1.6 % ρs= 0.9 % (Specimen 2-1,2-2) = 0.6 % (Specimen 2-3) 16-#6 Bars 1.5 in. Cover ρg : reinforcement ratio ρs : volume ratio of spiral hoop to the core volume Spirals #3@2.5 in. (Specimen 2-1 and 2-2) #3@3.5 in. (Specimen 2-3) 24 in.

  6. Loading direction Column Cross Section Longitudinal strain gage Transverse strain gage 6” 6” 3” 3” 2.5” d/2=12” d=24” 120” d=24” d/2=12” 2.5” Strain gage Instrumentation Plan

  7. Loading direction Column Cross Section Potentiometer Steel Angle Bar 2.5” d/2=12” d=24” Potentiometer Instrumentation Plan 120” d=24” d/2=12” 2.5”

  8. Construction of Specimen 1-1 Spiral Hoop with Instrumentation Casting of column

  9. Construction of Specimen 2-1 Assembling Spiral Hoop Casting of column

  10. Report on Concrete Strength for Specimen 1-1,2-1 (psi)

  11. Proposed Displacement History : Test Stage at Reno 16 8Δ’y 15 6.4Δ’y 4.8Δ’y 14 13 3.2Δ’y Pre-yielding 1.6Δ’y 1Δ’y Pre-cracking Δ’y: average measured displacement corresponding to longitudinal reinforcement strain gauges first yield

  12. Test Set-up of Specimen 2-1

  13. Test Schedule

More Related