100 likes | 244 Views
DCS WG report: from dreams to reality. A fter Technical Run considerations. Main difficulties identified during TR Unstable and unreliable middleware (OPC servers) Worsening of the situation with increasing of complexity of the system and number of channels
E N D
After Technical Run considerations VF • Main difficulties identified during TR • Unstable and unreliable middleware (OPC servers) • Worsening of the situation with increasing of complexity of the system and number of channels • Basic control of whole system is better than sophisticated control of a part • Our resources are limited and job should be better planned
IT: ORACLE DB Main DCS hard- and middleware in TR PVSS 3.8 Advanced control for LKr Simplified control for the others Rudimentary LAV FE control WIENER FE crates OPC servers and other middleware LKr LV control CAEN HV 2012 CAEN FE crates RICH FE control STRAW HV & LV LAV FE control CHANTI PS KTAG FE control 2013 MPOD Hardware LV control HV and LV control FE control FE control FE control: 3 FE control WIENER FE crate WIENER FE crate WIENER FE crates: 5 WIENER FE crates: 4 WIENER FE crates: 3 WIENER FE crate WIENER FE crate CAEN FE crates: 32 CAEN HV CAEN HV CAEN HV: 1,2 CAEN HV CAEN HV: 4 MPOD: 4 CAEN HV: 3 PS (?) STRAW LAV LKr RICH CHANTI CEDAR MUV CHOD VF
IT: ORACLE DB Main DCS hard- and middleware evolution Win CC OA 3.11 WIENER FE crates OPC servers and other middleware LKr LV control CAEN HV 2013 CAEN FE crates RICH FE control STRAW HV & LV LAV FE control CHANTI PS KTAG FE control MPOD Hardware LV control HV and LV control FE control FE control FE control: 12 FE control WIENER FE crate WIENER FE crate WIENER FE crates: 5 WIENER FE crates: 4 WIENER FE crates: 12 WIENER FE crate WIENER FE crate CAEN FE crates: 32 CAEN HV CAEN HV CAEN HV: 1,2 CAEN HV CAEN HV: 4 MPOD: 4 CAEN HV: 12 PS (?) STRAW LAV LKr RICH CHANTI CEDAR MUV CHOD VF GTK ? IRC/SAC
Comparison of TR and final set-up in number of units/channels VF
Our constraint on man-power VF • Currently the central DCS team consist of 5 persons • Jonas Arroyo Garcia (100%) – our main developer • Roman Fedoseev (100%) – developper started to work with us in 2011 • Piotr Golonka (10%) – EN/ICE project leader • Riccardo Fantechi (10%) • ValeriFalaleev (50%) • Contract with Jonas will finish at the end of July. • Situation with Roman is unclear. • To ensure delivery of the system we should work under assumption of the worst case scenario: 10-12 man-months available and termination of main DCS tasks already in 2013.
DCS strategy in 2013 VF • Concentrate on basic control of whole detector without closing possibility of future upgrade (horizontal base) • Test and integration of all available middleware • Integration of all available hardware (in ideal case all experiment hardware should be integrated before August 2013) • Migration to final network and DB set-up • Simplified User Interface and functions • Implement advanced control in case of availability of extra manpower
First steps in 2013 VF • Movement of DCS into new environment: • Migration to new version of SLC6, WinCC OA 3.11 and FW 5.1.0 on one of our server • Migration of KTAG and LAV applications in new environment • The rest of TR system will be moved in February • Successful test of CEDAR NINO control with an ELMB (see CEDAR WG materials) • LAV4-8 HV system arrangement in PC farm area • First LKr CAEN FE crate (again in PC farm)
Message to our dear users CAEN FE crates RICH FE control STRAW HV & LV LAV FE control CHANTI PS KTAG FE control 2013 MPOD LV control HV and LV control FE control FE control FE control: 12 FE control WIENER FE crate CAEN FE crates: 32 WIENER FE crate WIENER FE crates: 5 WIENER FE crates: 4 WIENER FE crates: 12 WIENER FE crate WIENER FE crate CAEN HV CAEN HV CAEN HV CAEN HV: 1,2 CAEN HV: 4 MPOD: 4 CAEN HV: 12 PS (?) • Please take in consideration our limited recourses and goal to deliver a basic DCS for whole detector already in 2013 (in reality everything should be finished before August) • Help us NOW, even if the data taking will start in 2014 • Use supported by EN/ICE hardware to minimize integration efforts STRAW LAV LKr RICH CHANTI CEDAR MUV CHOD