1 / 13

MAVEN PFFSW STATUS 10/02/2012 Conf: 866-541-6330 #7064930

MAVEN PFFSW STATUS 10/02/2012 Conf: 866-541-6330 #7064930. Overview of Activities. Deliveries Development (Build 3) During Period SWEA PAD simulated on laptop verified against DWC’s Excel spreadsheet Incorporated in V3.0 Dave Mitchell now wants changes SWIA MOMENTS

derick
Download Presentation

MAVEN PFFSW STATUS 10/02/2012 Conf: 866-541-6330 #7064930

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. MAVEN PFFSW • STATUS • 10/02/2012 • Conf: 866-541-6330 #7064930

  2. Overview of Activities Deliveries Development (Build 3) During Period • SWEA PAD • simulated on laptop • verified against DWC’s Excel spreadsheet • Incorporated in V3.0 • Dave Mitchell now wants changes • SWIA MOMENTS • Simulated on PC environment • Transferred to FSW V3.1 • Simulation did not work • Code required a lot of changes • Successful simulation of P1 and P2 Moments against test cases • SWIA LUTs • Required rewriting sections of Flash Write/Read functions • Allows Read/Write from/to a Specific Block on Flash • Tested on ETU • Limit Monitor Database Building • Received inputs from instrumenters last Sunday. • Have built a database but will need to test it. • On the “Cutting Room Floor”

  3. SPRs and SCRs

  4. Charts CHARTS

  5. Op SLOC

  6. Module Status Chart

  7. Metrics Chart

  8. Margin Chart

  9. Margin Chart

  10. Defect Chart NULACCERRs reported and fixed.

  11. Charts FORMAL TEST OUTLINES

  12. CPT and Stress Tests • Acceptance Testing • Performed on ETU PF System • Highly Automated Using Approved Test Scripts • Comprehensive Performance Test All Requirements Verified All Arms/Disarms Verified All Errors and Events Verified All Telemetry and Commands Used All PF Mode Configurations Used CPU Resource Usage Measured • Long Duration & Stress Test • High Rate of Commands • Command Pass Simulation Every Hour for 72 hours • Memory Load – Uplink of Script Database (1KB) • Serial Commands – Max commands rate for 250 commands • Memory Dump Script Database • Execute Script and Verify Results • High Rate of Telemetry • Continuous Telemetry at 200% nominal • Real Time Data @ 200% • Archive Playback @ 200% • CPU Intensive Processing • Calculations @ 100% • Archive Writing (200% nominal) • Data Compression Enabled • SDRAM and SRAM Memory Scrubbing Enabled • Verification • Test Status Logged Every Hour • No Errors in FSW or GSE • No Memory Leaks

  13. Acceptance Testing • Acceptance process – reviews (e.g., Acceptance Test Readiness Review, Acceptance Test Review), approval, and signoff processes • Final Builds Have Review/Test/Review Sequence • ATRR • LDS • CPT • ATR • Approval and Signoff • PF PM • PF SQA

More Related