130 likes | 243 Views
MAVEN PFFSW STATUS 10/02/2012 Conf: 866-541-6330 #7064930. Overview of Activities. Deliveries Development (Build 3) During Period SWEA PAD simulated on laptop verified against DWC’s Excel spreadsheet Incorporated in V3.0 Dave Mitchell now wants changes SWIA MOMENTS
E N D
MAVEN PFFSW • STATUS • 10/02/2012 • Conf: 866-541-6330 #7064930
Overview of Activities Deliveries Development (Build 3) During Period • SWEA PAD • simulated on laptop • verified against DWC’s Excel spreadsheet • Incorporated in V3.0 • Dave Mitchell now wants changes • SWIA MOMENTS • Simulated on PC environment • Transferred to FSW V3.1 • Simulation did not work • Code required a lot of changes • Successful simulation of P1 and P2 Moments against test cases • SWIA LUTs • Required rewriting sections of Flash Write/Read functions • Allows Read/Write from/to a Specific Block on Flash • Tested on ETU • Limit Monitor Database Building • Received inputs from instrumenters last Sunday. • Have built a database but will need to test it. • On the “Cutting Room Floor”
Charts CHARTS
Defect Chart NULACCERRs reported and fixed.
Charts FORMAL TEST OUTLINES
CPT and Stress Tests • Acceptance Testing • Performed on ETU PF System • Highly Automated Using Approved Test Scripts • Comprehensive Performance Test All Requirements Verified All Arms/Disarms Verified All Errors and Events Verified All Telemetry and Commands Used All PF Mode Configurations Used CPU Resource Usage Measured • Long Duration & Stress Test • High Rate of Commands • Command Pass Simulation Every Hour for 72 hours • Memory Load – Uplink of Script Database (1KB) • Serial Commands – Max commands rate for 250 commands • Memory Dump Script Database • Execute Script and Verify Results • High Rate of Telemetry • Continuous Telemetry at 200% nominal • Real Time Data @ 200% • Archive Playback @ 200% • CPU Intensive Processing • Calculations @ 100% • Archive Writing (200% nominal) • Data Compression Enabled • SDRAM and SRAM Memory Scrubbing Enabled • Verification • Test Status Logged Every Hour • No Errors in FSW or GSE • No Memory Leaks
Acceptance Testing • Acceptance process – reviews (e.g., Acceptance Test Readiness Review, Acceptance Test Review), approval, and signoff processes • Final Builds Have Review/Test/Review Sequence • ATRR • LDS • CPT • ATR • Approval and Signoff • PF PM • PF SQA