An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. MAAC INFRA PVT. LTD. WELCOME

  2. CONTENTS • Brief Introduction • Details of electrical works executed • Current Commitments • Organisation Structure • Details of Tools & Plants • Working Methodology • Financial Parameters • Quality & Safety policy • Competitive Edge MIPL

  3. MAAC INFRA PVT. LTD. ELECTRO-MECHANICAL DIVISION COMPANY PROFILE

  4. MAAC INFRA: Shaping the Future Vision MAAC INFRA to become a key player in MEP Contracts. Mission To generate pool of intelligent professionals in respective areas of operation to offer multifold business modules in Construction industry. Quality policy To offer the Services which are technology driven, system supported & of international standards. We foster an open culture that recognises, values and welcomes diversity in our people- visible and invisible

  5. Whom We Serve • Architects • Interior Decorators • Hotels • Universities • Builders • Electrical Consultants • Project Management Companies • Hospitals • Defence • Airport • Railways • Telecommunication Companies • Developers • Infrastructure Companies

  6. A Robust Community of Partners

  7. Our Esteemed Clients

  8. BRIEF OVERVIEW MAAC INFRA E&M DIVISION ►Having acquired strong presence in the field of Electrical Bus Trunking, Car parking management, Addressable Fire Alarm System. A separate SBU is formed to provide MEP services solutions under one roof in 2010. ►Proven track record in execution of large & complex projects in record time by the core team of professionals who are on board now. ►Team of Dedicated & Experienced Staff from various disciplines of engineering.

  9. Maac Infra-Capabilities The depth & breadth of the Maac Infra portfolio reflects our diverse capabilities & areas of expertise. Our In-house expertise in Electrical, Plumbing & Fire Fighting ,HVAC helps us to identify key challenges, find solutions early in the preconstruction process. We provide high level of commitment to each and every client. As a Turnkey MEP agency, we shall be : ► Keeping project on track ► Delivering value in every phase ► Meeting project deadlines ► Protecting your investment ► Expertise you can count on

  10. Maac Infra (E&M) Offers Solutions For - ►DG sets, Power Transformers, Switchboards, Relay & Control Panels etc. ►Overhead and Underground electrical networks. ►Indoor and outdoor Illumination works ►Public address, Communication system, Security System, Fire Alarm, Computer network. ►Bus trunking systems. ►Car parking management ►Basement ventilation system

  11. PRESTIGIOUS E&M WORKS

  12. PRESTIGIOUS E&M PROJECTS • M/s Cadbury India Ltd, Baddi 56 lacs • Alpha One, Ahmedabad 284 lacs • M/s World Trade Park, Jaipur 750 lacs • M/s Purvanchal Developer 250 lacs • M/s Ginger Hotel-Chennai 150 lacs • M/s Dream City- Khanna –Township 380 lacs • M/s Ilbs Hospital Vasant Kunj 350 lacs • Adani Belvedere Club –Ahmedabad 280 lacs • GokulDham Township-Ahmedabad 410 lacs • Uppal Hotel –Delhi 210 lacs

  13. WORLD TRADE PARK JAIPUR

  14. World Trade Park - Jaipur SCOPE OF WORK – • Internal electrification work. • Bus trunking system. • Car parking management. • Basement Ventilation.

  15. Alpha One Mall - Amritsar SCOPE OF WORK – • Car parking management • Ventilation System

  16. Alpha One Mall - Ahmedabad SCOPE OF WORK – • Car parking management. • Bus trunking system. • Basement ventilation.

  17. DMRC IT PARK – NEW DELHI SCOPE OF WORK – • Substation equipment. • Supply and installation of DG sets, LT panels. • Bus trunking system. • Internal electrification work • Fire-fighting works.

  18. ORGANISATION STRUCTURE & LIST OF TECHNICAL PERSONNELS

  19. OFFICE HEAD OFFICE CHENNAI No.66, JOSHIER STREET, FIRST FLOOR, NUGAMBAKKAM, CHENNAI-600034 GURGAON A-319A, SOUTH CITY – 1, UNITECH GURGAON-122001 HARYANA OFFICES MUMBAI 401, PATEL INDUSTRIAL ESTATE, Opp FAME ADLAB MULTIPLEX OFF ANDHERI LINK ROAD, ANDHERI WEST-400053 JAIPUR 381, INDIRA BAZAR, JAIPUR-302001 RAJASTHAN NEW DELHI 132/14, ONKAR NAGAR-B, TRI NAGAR, NEW DELHI-110035. KUALA LAMPUR No. 82-1-2, JALAN 8/62A, BANDAR MENJALARA, KEPONG, 52200 KUALA LAMPUR. NOIDA B 43, ALPHA 1 GREATER NOIDA UTTAR PRADESH CHANDIGARH SCO No. 89, INDUSTRIAL AREA PHASE-2, CHANDIGARH

  20. ORGANISATION CHART MAAC INFRA PVT. LTD. Board of Directors Director Admin/Purchases Director Operations Director Corporate Finance Director Marketing & Business Development GM Marketing AGM Design Engineer GM Finance GM Purchase Tendering Autocad Designer Company Secretary Team Leader Mktg Mgr Sales Manager Manager purchase Quality Banking Manager Accounts Site Manager Corporate Project Manager Purchase Engineer Application Engineer HR/Admin Project Coordinator

  21. TOOLS & PLANTS

  22. WORK SCHEDULE

  23. WORKING METHODOLOGY

  24. EXECUTION METHODOLOGY FOR INTERNAL ELECTRIFICATION F.A, P.A, CCTV, TEL. & BMS WORK Approved Drawing Drilling Of Base Saddle Marking Cutting of Conduit as per requirement Fixing of Conduit Thread on Conduit Fixing of Earth Wire Fixing of Accessories Fixing of DB/Pull Box Installation of Lighting Fixtures Switch/Socket Wiring

  25. EXECUTION METHODOLOGY FOR CABLE TRAYS, CABLE LAYING, RACEWAYS, BUS DUCT & BUS TRUNKING Marking 0f Route Fasten Marking Drilling Fixing of Fasteners Exact size of Bends, Cross ways Installation of Trays Fixing of Hangers Alignment (Quality Check) Measurement of Cable Fixing of Earth Strips Touch up on Hangers Fixing of Bends Measurement/Test Of Cable (Quality Check) Start laying of Cable Test of Drum Shifting of Drum Cut of cable Measurement of Core length (Quality Check) Quality Check Cute of length Testing of Cable Fixing of Gland Gland Hold Climping Tighten Terminal Tag Fixing Task Complete

  26. EXECUTION METHODOLOGY FOR HIGH SIDE EQUIPMENTS Delivery Erection Order to Vendor For TRS/HT Panel Approval From Owner Drawing & Data Sheet Submission Inspection & Testing Mfg. Order to Vendor For LT/PLC/BC Inspection & Testing Drawing & Data Sheet Submission Approval From Owner Mfg. Submission Drawing to client Submission of S/S Layout Drgs Approval of Drgs Construction Of S/S bld. Approval Of Drg Inspection of Electrical Inspector Supply of Power Approval of HT System Precommissloning Test Testing and Commissioning Power from SEB

  27. EXECUTION METHODOLOGY FOR DG SET & ALLIED EQUIPMENTS Delivery Erection Approval From Owner Drawing & Data Sheet Submission Inspection & Testing Order to DG Set Mfg. Order to Vendor For LT/PLC/BC Inspection & Testing Drawing & Data Sheet Submission Approval From Owner Mfg. Submission of S/S Layout Drgs Drawing & Data Sheet Submission Approval From Owner Inspection & Testing Mfg. Supply of Power Final Testing Precommissloning Test

  28. EXECUTION METHODOLOGY FOR DG SET & ALLIED EQUIPMENTS Drg. And data Sheet Submission Approval from PMC/Owner Fuel Yard Sub. & approval Of Drg. From appropriate authority Construction as per approved Drawing Order for equipment Manufacturing Inspection and Testing Delivery Erection Commissioning and submission of completion report Approval from Appropriate Authority Fuel to DG Set

  29. EXECUTION METHODOLOGY FOR EXTERNAL ELECTRIFICATION Approval of Pole/ Fixture from PMC/ Owner Approval of Drawing Order to Vendor Manufacturing of Pole Pole Foundation Installation of Pole Installation of Fixture Pole Earthing and Cabling Laying Final Painting of pole Testing Termination

  30. SAFETY

  31. Safety is a critical component of Quality. We believe safety is essential to the completion of a quality project. Safety is our top priority. We have no tolerance for any practice that does not promote safety at work. We have worked hard at developing a safety culture. Our goal is tough: we want to eliminate all accidents from project site workplaces. Our positive approach to safety has enabled us to grow. Our commitment to safety is an important part of our vision. SAFETY MANAGEMENT We consider safety as no accident. We constantly work at it with hands-on training. Proactive safety management keeps our job site injury-free. Safety Record Thanks to the efforts of our safety conscious employees, we hold the best safety records .

  32. Management Commitment to Safety • We are committed to maintaining a safe and healthful working environment. • We pledge our best efforts to work together safely to achieve this goal. • We regularly communicate our goal to all employees. • Our Programme • Our Safety Program includes: • Employee Orientation • Project Safety Plan • Emergency and Communication Plan • Safety Inspections • Safety Committee Meetings

  33. Safety Philosophy • All injuries can be prevented. • Management and every individual is responsible for preventing injuries. • Working safely is a condition of employment. • All operating exposures can be safeguarded. • Training employees to work safely is essential. • Prevention of personal injuries is good business. • Safety Department • We have qualified, experienced, committed and result focused safety engineers. • Safety Statement • Safety comes first at Maac Infra Pvt. Ltd. Always we think it, • plan for it, make it happen.

  34. QUALITY ASSURANCE

  35. Quality assurance system may be visualized as a series of inter-related controls which are exercised to achieve the desired quality Objectives. They are:- • 1.PROCESS CONTROL-Drawing & Technical Specification, Construction Methodology,Quality Assurance Plan,Resource based planning etc. • 2.PROCUREMENT CONTROL-Vendor evaluation & Registration, Specification for Work order,Qualification of Procured items . • 3.MATERIALS CONTROL-Material receipt, QA/QC verification,Storage,Non conforming material segregation storage,Issue of materials,Stores Register. • 4.INSPECTION & TEST CONTROL-Quality Assurance Plan,Calibration of measuring Equipments,Inspection Records,Statistical Analysis. • 5.NON-CONFORMANCE CONTROL-Preventive & Corrective Action.

  36. Quality assurance system may be visualized as a series of inter-related controls which are exercised to achieve the desired quality Objectives. They are:- • 6.DESIGN CONTROL-Basic Design,Process Design • 7.DOCUMENT CONTROL-Controlled copy,Distribution,Old copy Disposition. • 8.RECORD CONTROL-Document identification,Storage ,Retrieval, • Maintenance,Permanent & Temporary records. • 9.TRAINING CONTROL-In-House Training,Institutional Training. • 10.QUALITY SYSTEM AUDIT-Audit by Internal Quality Auditors

  37. Our Commitment • To act as problem-solvers and innovators that assist senior decision-makers to realize their corporate objectives. • To deliver outstanding value, to exceed expectations and to build long-term business relationships. • MAAC INFRA bring the managerial and technical experience needed to collaborate with your team from problem definition to solution implementation.. We are the trusted advisor of choice, partnering with government and commercial industries to achieve best business value in dynamic environments characterized by business, organizational, and technical change.

  38. Thank you! Contact Us: MAAC INFRA PVT.LTD. A 319A SOUTH CITY-1 UNITECH GURGAON HARYANA-122001, INDIA Email: business@maacinfra.net