Programmatic CDM: Eligibility, Methodological Requirements and Implementation. Development Dividend Side Event December 5, 2005. Team members: Margaree Consultants Econergy International. Christiana Figueres Team leader. Goals of the WB Study. Conceptualize programmatic CDM
E N D
Programmatic CDM:Eligibility, Methodological Requirements and Implementation Development Dividend Side Event December 5, 2005 Team members: Margaree Consultants Econergy International Christiana Figueres Team leader
Goals of the WB Study • Conceptualize programmatic CDM • Confirm eligibility for 2008-2012 • Identify methodological requirements • Propose possible implementation mode
Material reviewed • Kyoto Protocol and Marrakech Accords • Executive Board reports ( 16, 17, 19, 20, 21) • Meth Panel reports ( 15, 16 and 18) • Meth Panel recommendations • NM0072- EE standards in Ghana • NM0100- EE motor replacement in Mexico • NM0108 – fuel switch biodiesel in India • CDM project pipeline (CD4CDM) • 406 on November 3, 2005 • 13 projects w/ programmatic characteristics
Classification of reviewed project activities Programmatic CDM Project Activities Private sector CDM Initiatives Public sector CDM Policies INCENTIVES (VOLUNTARY) REGULATIONS (MANDATORY) Nepal biogas partnership Kuyasa energy upgrade Morocco photovoltaic kits Moldova biomass & energy conservation (3 projects Khno Kaen ethanol (L) Mexico electric motor replacement (L) Bagepalli biogas stoves Aceh solar cooker India irrigation devices Andhra Pradesh biodiesel (L) Ghana EE standard (L) “L” denotes Large scale
Projects reviewed • Deploy renewable energy and EE technologies • Often involve household, small industry, transportation • High social benefits to poor and rural populations • High transaction costs/low credit flows • Need promoting program to occur
CDM project activities Multiple sites under one program Single site Types of CDM project activities
Mandatory Governmental policies Voluntary Private sector initiatives Types of CDM programs CDM programs Do not differentiate between “sectoral” and “policy-based” CDM
Definition • Programmatic CDM project activities are those in which emission reductions are achieved as the result of the implementation of a government measure or private sector initiative. • Restricted to those project activities that are real, measurable and verifiable.
Characteristics of programmatic project activities • Occur as the result of a deliberate program • Government policy (mandatory or voluntary) • Private initiative (voluntary) • Result in multiple dispersed actions • Not necessarily occur at the same time • Type, size and timing may not be known at outset • Each type of ER action should use appropriate baseline and monitoring methodology
Characteristics of programmatic project activities • One enacting agent • Private or public • Provides incentives or obligations • One of the “project participants” • Does not necessarily implement all actions • Program is the project activity • Actions are not project activities • Actions must be measured according to approved methodologies
Eligibility • No provisions in KP or MA to make programmatic project activities ineligible • “A project activity is a measure, operation or action that aims at reducing GHG emissions…” • 1 public sector voluntary registered • 2 private sector requesting registration • EB considering 3 private and 5 public sector voluntary • Only missing link: programmatic project activities based on mandatory programs
Methodological • Apply modalities and procedures for CDM mutatis mutandis • As in current CDM practice: • Boundary • Leakage • Double counting
Methodological • Baseline- adjust for two levels • Program level- program not included if after November 2001 • Action level- should reflect baseline at program level • Additionality- adjust for two levels • Program level - as in single site CDM • Action level- as in single site if few large, or combination of eligibility conditions and free riders if many small
Methodological • Crediting period • As in single site OR • Use of vintages where appropriate would reduce administrative burden • Monitoring – adjust for multiple small actions • Sampling, etc
Implementation • Eligibility should not be an issue • Methodological vacuum • Programmatic project activities are being submitted “as if” single-site • EB should provide methodological guidance ASAP • Multi dimensional application of existing methodologies • No new conceptual approaches
Potential of programmatic CDM • Broadens the scope of the CDM within the existing regulatory framework for 2008-2012 • Strengthens the CDM for energy efficiency and fuel switching projects (only about 5% of CERs in UNFCCC pipeline), also for renewables and waste management • Reaches the household sector, transportation sector and small enterprises with the CDM • Responds better to the needs of LDCs and poor communities
Thank You! Study on Programmatic CDM prepared for CFB World Bank by Christiana Figueres, Econergy International and Margaree Consultants available on: www.carbonfinance.org