590 likes | 696 Views
Closing / Cierre / Amaiera. SEE YOU NEXT YEAR ON 21·22·23 October. Venue. The Conference Centre and Concert Hall. Euskalduna Jauregia. Bilbao / Spain. It received the Apex Award for Best Convention Centre of the World 2003. The Conference Centre and Concert Hall.
E N D
Closing / Cierre / Amaiera SEE YOU NEXT YEAR ON 21·22·23 October
The Conference Centre and Concert Hall. Euskalduna Jauregia. Bilbao / Spain It received the Apex Award for Best Convention Centre of the World 2003
The Conference Centre and Concert Hall. Euskalduna Jauregia. Bilbao / Spain One of the most outstanding contemporary works carried out by Spanish architects
Opening – Begoña Laibarra, Jesús de la Maza, Cristina Oyón and Doron Cherkovsky 29 Supporting the present and building the future
Tutorial 1 - Master class: Applying the Result driven test principles in your work 29 Derk-Jan de Grood - Collis (The Netherlands) “Testing is a process that gives a judgment about the quality of the system and the measure in wich ot can be expected that the set goals are going to be reached”
Tutorial 2 - Industrial-Strength Technical Inspections 29 Paul Jorgensen - Grand Valley State University (USA) “Technical people like to fix things, it’s in their nature. But identify issues, please don’t resolve them.”
Keynote - Testing the Heathrow Terminal 5 Baggage Handling System 29 Roger Derksen - Transfer Solutions (The Netherlands) “Site integration time is often reduced - airport opening date is fixed - to ‘no time left’ ”
Keynote - Programs that test themselves 30 Bertrand Meyer - Swiss Federal Institute of Technology (Switzerland) “The programmer wants to make a program right and the tester wants the program to fail”
Keynote – Challenges of Testing on the Telecommunications Industry 31 Jussi Mäkinen – Oulu Innovation Ltd / Octopus Network (Finland) “Testing is a growing business...good news for us!”
TRACK A · QA Management (1) - Grid-QCM: the grid Quality Certification Model 29 Adriano Rippa - Engineering Ingegneria Informatica S.p.A. (Italy) “Grid QCM requires less human effort to be used because it is almost fully automatable”
TRACK A · QA Management (2) - Designing Change Request Workflows 29 Eric Mariacher - Logitech (France) “The goals of change request workflow are visibility, traceability and communication between teams”
TRACK B · Test Automation (1) - Let’s get into the product!!! “In-built Automation Software” 29 Abhisheck Talwar - Adobe Systems India Pvt. Ltd. Noida (India) “In-built test automation software has control over the application as an ‘insider’ ”
TRACK B ·Test Automation (2) - From Manual Testing to an Automated Testing Framework 29 Alvin Sumter - Cox Newspaper (USA) “Getting an early start with test automation has contributed to the success of projects”
TRACK C ·Test Management (1) - Test Policy: Gaining Control on IT Quality and Processes 30 Chris Schotanus - Lógica-Testmanagement & Consultancy (The Netherlands) “TestGrip describes a vision on test policy and its impact on the test organisation, based upon working experience”
TRACK C ·Test Management (2) - Vertical approach in managing testing of Software projects 30 Myroslav Palenychka - IBM Rational Modeling Tools (Canada) “In Vertical approach, testers for different components work together bringing deeper knowledge of their features”
TRACK C ·Test Management (3) - RISKI: An efficient Risk Driven Methodology for Woftware QA 30 Sudipta Debnat - Aricent technologies (India) “‘RISKI’ is a framework for dynamic risk identification and analysis”
TRACK C ·Test Management (4) - Risk Based Test Strategy Judged 30 Leo van der Aalst - Sogeti Nederland B.V (The Netherlands) “Testing should continue as long as the costs of detecting and repairing defects during testing are lower than the costs if the defects occurs during production”
TRACK C ·Test Management (5) - Requirement Verification Matrix (RVM) 30 Avner Engel - Holon Institute of Technology (HIT) (Israel) “The need is to plan, in an early stage of the system development, how each requirement shall be verified”
TRACK D · Testing Techniques (1) - Exploratory Testing put in practise 30 Erik Boelen - QA Consult Services (Belgium) “Testing is a process that provides insight into, and advice on, quality and the related risks”
TRACK D · Testing Techniques (2) - Resolving Security Test Coverage Dilemma: A threat modeling based approach 30 Vaibhav Mittal & Vibhore Garg - Adobe Systems India (India) “Threat modeling is a technique where you can identify the possible attack vectors and vulnerabilities your application can face and identify the potential attack points your application can have”
TRACK D · Testing Techniques (3) – Test KPIs 30 Anil Kumar - Aricent Technologies (UK) “Observation KPIs can be used to measure ‘ Project Health’ or for ‘Product Readiness Review ‘ after testing”
TRACK D · Testing Techniques (4) - Extending Model Driven Development to Model Driven Testing 30 Moshe S. Cohen - Telelogic (Israel) “By adopting MDD, developers increased their productivity to offer more complex and more competitive products in less time...”
TRACK D · Testing Techniques (5) - Comparing Agile Testing Techniques 30 Paul Jorgensen - Grand Valley State University (USA) “The product is a solution. If the problem isn’t solved, the product doesn’t work”
TRACK E · Testing Organisations (1) - Test Factory Implementation at Zurich CoE 31 Javier Fernández-Pello & Raúl Alares - Zurich Insurance (Spain) “Test factory provides a standarized platform for proposing and delivering application testing services and enables faster response to customer requests”
TRACK E · Testing Organisations (2) - Independent Software Testing Group 31 Karina Gomes - C.E.S.A.R. (Brasil) “Finally the salaries of testers and developers are getting equal”
TRACK E · Testing Organisations (3) - Assuring your test organisation Quality - find the best for the job? 31 Galit Zucker - QA Consultant (Israel) “Hire for people with added values – Avoid hiring YOU in another suit”
TRACK F ·Configuration Management (1) - 5 Steps of Configuration Management Functionalities 31 Eric Mariacher - Logitech (France) “CMMI = not how we do it but how well we do it”
TRACK F · Configuration Management (2) - Lesson learned in Test - and configuration management 31 Eric Megens - High Tech Solutions (The Netherlands) “Avoid branching as much as possible, keep the lifetime short”
TRACK F · Configuration Management (3) - Configuration Control: Keep items synchronized 31 Juan Carlos Sánchez Mirabal - NTE SA / Werfen Group (Spain) “Configuration Management is the implementation of a database that contains details of the organisation’s elements that are used in the provision and management of its IT services”
TOOL LAB 29 Jose Luis Fernandez (PPOOA) PPOOA, a model base approach for the architecture and performance evaluation of real-time systems
TOOL LAB 30 Telelogic (IBM) Functional Test Management and Planning with Telelogic DOORS
TOOL LAB 30 Visure Solutions IRQA Demo: Corporate Solution for Requirement Engineering
TOOL LAB 31 SQS SQS Test Framework
Round Table 31 What is the future of testing? Threats of open source? No! ‘Professional developers’ have the advantage of R&D which always brings the tools one step further.
Conference Dinner at Sociedad Bilbaína 30th October 2008 30 The Dinner
Conference Dinner at Sociedad Bilbaína 30th October 2008 30 The Dinner
QA&TEST 2008 Chairmen Thanks!