1 / 4

BSOP 429 Week 8 Final Exam DeVry

Just Click on Below Link To Download This Course:<br><br>https://www.devrycoursehelp.com/product/bsop-429-week-8-final-exam-devry/<br><br>BSOP 429 Week 8 Final Exam DeVry<br> <br>BSOP 429 Production Activity Control and Just-in-Time with Lab u2013 DeVry<br><br>BSOP 429 Week 8 Final Exam u2013 Set 1<br><br>u2022tPage 1<br>1.t1.(TCO 4) The priority rule, which will sequence jobs in the order they are received, is _____.(Points : 5)<br>2. (TCO 2) In an assignment method problem, if it takes Abe 3 hours to build a birdhouse and 4 hours for a doghouse, and Betty takes 4 hours for a birdhouse and 3 hours for a doghouse, what is the reduced cost (in hours) of assigning Betty to build the doghouse? (Points : 5)<br><br>

Download Presentation

BSOP 429 Week 8 Final Exam DeVry

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. BSOP 429 Week 8 Final Exam DeVry Just Click on Below Link To Download This Course: https://www.devrycoursehelp.com/product/bsop-429-week-8-final-exam-devry/ Or Email us help@devrycoursehelp.com BSOP 429 Week 8 Final Exam DeVry BSOP 429 Production Activity Control and Just-in-Time with Lab – DeVry BSOP 429 Week 8 Final Exam – Set 1 Page 1 • 1. 1.(TCO 4) The priority rule, which will sequence jobs in the order they are received, is _____.(Points : 5) 2. (TCO 2) In an assignment method problem, if it takes Abe 3 hours to build a birdhouse and 4 hours for a doghouse, and Betty takes 4 hours for a birdhouse and 3 hours for a doghouse, what is the reduced cost (in hours) of assigning Betty to build the doghouse? (Points : 5) 3. (TCO 2) A major difference between manufacturing and service systems in terms of scheduling is (Points : 5) 4. (TCO 3) Scheduling in service systems may involve scheduling which of the following?(Points : 5) 5. (TCO 5) The owner and operator of the local franchise of Handyman, Inc., has four jobs to do today, shown in the order they were received: 6. (TCO 6) Building up an inventory of standard parts or modules instead of immediately producing the finished end items is the essence of (Points : 5) 7. (TCO 7) With regard to suppliers, JIT systems typically require (Points : 5) 8. (TCO 10) Which of the following is characteristic of the JIT philosophy? (Points : 5) 9. (TCO 1) In make-to-stock systems, fluctuations in sales volume are managed through which of the following? (Points : 5)

  2. 10. (TCO 5) In an MRP master schedule, the planning horizon is often separated into a series of times periods called (Points : 5) Page 2 • 1. 1.(TCO 8) Explain how cellular manufacturing represents a flexible manufacturing system.(Points : 25) 2. (TCO 11) State the four building blocks of lean operations, and explain how fast and simple are the two common threads that run through them. (Points : 25) 3. (TCO 9) Elaborate on the statement: “The output of the system cannot exceed the output of the bottleneck operation(s).” (Points : 25) 4. (TCO 4) Differentiate between infinite loading and finite loading as two major approaches used to load work centers. (Points : 25) 5. (TCO 12) The theory of constraints has a goal of maximizing flow through the entire system. (Points : 25) 6. (TCO 2) Refer to the following data for jobs waiting to be processed at a single work center (jobs are shown in order of arrival): 7. (TCO 10) Respond to the question: “Which is better, MRP or JIT?” (Points : 25) 8. (TCO 1) The design of the MPC system is influenced by some key features of market demand and product design. Name the key features that will lead to an assemble-to-order system and explain the rationale. (Points : 25)9. (TCO 6) Market requirements drive the choice of the shop floor system approach. Describe and explain the type of market requirements that would be suitable for an MRP-based system, along the lines of product design, product variety, product volume per period, product mix changes, and delivery schedule changes. (Points : 25) 10. (TCO 10) Manufacturing strategy also drives the choice of shop floor system. Describe and explain the strategies that lend themselves to a JIT-based system, from the perspective of WIP, changeover cost, and process choice. (Points : 25) BSOP 429 Week 8 Final Exam – Set 2 Page 1 • 1. 1.(TCO 4) The two different approaches to load work centers in job-shop scheduling are (Points : 5) 2.(TCO 2) The priority rule where jobs are processed according to the smallest ratio

  3. of due date to processing time is (Points : 5) 3. (TCO 2) A scheduling rule used for sequencing jobs through two work centers is (Points : 5) 4. (TCO 3) The owner and operator of the local franchise of Handyman, Inc., has four jobs to do today, shown in the order they were received:……………….If he uses the first-come, first-served (FCFS) priority rule to schedule these jobs, what will be the average completion time? (Points : 5) 5. (TCO 5) The ultimate goal of JIT operations is to have (Points : 5) 6. (TCO 6) Building up an inventory of standard parts or modules instead of immediately producing the finished end items is the essence of (Points : 5) 7. (TCO 7) A kanban card is used to signal that (Points : 5) 8. (TCO 10) The type of processing system that is used for highly standardized products is (Points : 5) Page 2 • 1. 1.(TCO 8) Does cellular manufacturing apply best to repetitive, high-volume product or nonrepetitive, low-volume product? Explain and give an example.(Points : 25) 2. (TCO 11) Validate or invalidate the statement that although inventories are maintained, the goal of lean operations is to maintain a minimum of safety stock. (Points : 25) 3. (TCO 9)Elaborate on the statement: “The output of the system cannot exceed the output of the bottleneck operation(s).” (Points : 25) 4. (TCO 4) Differentiate between infinite loading and finite loading as two major approaches used to load work centers. (Points : 25) 5. (TCO 12) Explain why batch process helps maximize worker efficiency. (Points : 25) 6. (TCO 2) Refer to the following data for jobs waiting to be processed at a single work center (jobs are shown in order of arrival):……………………Batch job requires specialized operations carried out by different workers or group of workers and so there is a need for more specialization and standardization. What is the schedule sequence using the first-come, first-served (FCFS) priority rule? (Points : 25) 7. (TCO 10) Respond to the question: “Which is better, MRP or JIT?” (Points : 25) 8. (TCO 1) The design of the MPC system is influenced by some key features of market demand and product design. Name the key features that will lead to a make- to-stock system and explain the rationale. (Points : 25)

  4. 9. (TCO 6) Market requirements drive the choice of the shop floor system approach. Describe and explain the type of market requirements that would be suitable for an MRP-based system, along the lines of product design, product variety, and product volume per period, product mix changes, and delivery schedule changes. (Points : 25) 10. (TCO 10) Manufacturing strategy also drives the choice of shop floor system. Describe and explain the strategies that lend themselves to a JIT-based system, from the perspective of WIP, changeover cost, and process choice. (Points : 25) Download File Now

More Related