An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. RF discussion on 3DL CA 21.8.2014 Jussi Kuusisto, Microsoft

  2. Overview • Requirements • FDD-TDD CA (RF, Demod/CSI, RRM) • Minimum requirements TBD • 3DL configurations • Description of Configurations – general sections • Generic RF requirements – mainly section 7, potential for section 6 • Details still open (e.g. relaxations), but expected impact on every requirement for 3 active DLs • Demod/CSI – open issue • RRM – open issue • New 2DL configurations – As the existing 2DL implementation • Configurations within individual 3DL configuration • New BW combinations sets • Rel-12 CA 2DL Demod/CSI/RRM requirements in scope of 2DL CA • TCs to be included in the WP

  3. Considerations for the work plan 1/2 • TDD-FDD Demod/CSI/RRM tbd • TCs currently are for FDD or TDD only. • New requirements or existing to be modified? • TDD-FDD RF TCs tbc • Minimum requirements impact on UL tbd • Test Case Structure for Section 7 tbd • Requires complete requirements in 36.101 • Only Class D available • Annex I? • Test Case Structure for Sections 8 & 9 tbd • To be in line with upcoming 2DL changes • Annex I?

  4. Considerations for the work plan 2/2 • Test Configurations & Table – update? • Applicability of different CA types • Potential change to existing TCs applicability (both RF and Demod/CSI)? • Need for new TCs for each CA type? • Possibility to align the Test Procedures to all types? • Possibility to create only 1 TC for each requirement? • 36.521-2 CA capability tables impact • 3DL CA Band independency against Demod/CSI requirements • Any lower order DL CA requirements covered by 3DL CA? • New connection diagrams & additional system complexity • Annexes • Analysis of 36.508 test frequencies based on the minimum requirements • 3DL impact on RRM tbd