1 / 30

600 East Boulevard Ave. - Dept 405 Bismarck, ND 58505-0840 (701) 328-8020 (701) 328-8000

North Dakota Department of Mineral Resources. http://www.oilgas.nd.gov. http://www.state.nd.us/ndgs. 600 East Boulevard Ave. - Dept 405 Bismarck, ND 58505-0840 (701) 328-8020 (701) 328-8000. Development area > 15,000 sq mi Size of West Virginia. 2,400 wells=90MW. 350-375 wells 2013-2020.

dewitt
Download Presentation

600 East Boulevard Ave. - Dept 405 Bismarck, ND 58505-0840 (701) 328-8020 (701) 328-8000

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. North Dakota Department of Mineral Resources http://www.oilgas.nd.gov http://www.state.nd.us/ndgs 600 East Boulevard Ave. - Dept 405Bismarck, ND 58505-0840(701) 328-8020 (701) 328-8000

  2. Development area > 15,000 sq mi Size of West Virginia

  3. 2,400 wells=90MW

  4. 350-375 wells 2013-2020

  5. Western North Dakota 1,100 to 2,700 wells/year = 2,000 expected 185 rigs = 22,000 temporary drilling jobs Another 13,000 temporary jobs building infrastructure 2,000-3,000 permanent jobs added each year 185 rigs will complete the first phase of drilling in 6-12 months 185 rigs will require about 20 years to complete phase 2 drilling 2,000 new wells per year requires 11-22 million gallons of frac water per day 40,000-45,000 new wells = 40,000-70,000 long term jobs 17-28 million gallons per day maintenance water

  6. Reclamation • 26,346 wells permitted as of 9/1/13 • 1,291 approved locations • 1,136 drilling and completing • 2,837 cancelled and expired permits • 9,096 producing • 972 idle producers • 447 active EOR injectors • 390 idle EOR injectors • 398 active disposal wells • 234 idle disposal wells • 1,113 bond not released • 8,432 reclaimed locations

  7. NDIC Goals • Reduce Flared volume • Reduce number of wells flaring • Reduce duration of flaring from wells

  8. NDIC 2013-2014 Rulemaking • 41 sections proposed • 16 due to statute changes • 11 apply to treating plants • 13 administrative or industry request/friendly • Hearing 8:30am October 1, 2013 • Comment period ends 5:00pm October 11, 2013 • Final NDIC approval November 26, 2013 • Effective date April 1, 2014

  9. WILLISTON BASIN TEMPERATURE PROFILE PROJECT

  10. NDIC Drill Cuttings Samples • Multi-well pads • Sample the one/two well(s) per pad to the deepest layer/bench • Sample vertical and build section at 30 foot intervals • Sample horizontal section at 90 foot intervals • Single well pads • Sample vertical and build section at 30 foot intervals • Sample horizontal section at 90 foot intervals