DATA LINK IMPLEMENTATION IN EUROPE Presented byGeoffrey BaileyHead of Communications UnitEUROCONTROL
Strategic Need To make more efficient use of communications To enable air traffic capacity to be increased
The Solution • supplying a second communication channel for routine/strategic ATC messages • to reduce the controller’s communication workload The Problem • Controller workload is a bottleneck • At least 1/3 of controller workload is radio. • Voice channel congestion leads to less than optimal service.
Objective of LINK 2000+ Co-ordinate the implementation of • selected air ground data link services for ATC, • at a number of ACCs/airports, • with benefit driven equipage by airlines, • based on ATN and VDL Mode 2 • from 2000 to 2007 to reduce controller workload…with a safety benefit
Functional Scope • DLIC Establish the application communication • ACM Transfer flights between sectors/centres • ACL Request/give ATC clearances • AMC Microphone stuck? • CAP Show flight instruments to controller • FLIPCY Compare FMS and FDP flight plans • DCL Request/give departure clearances • DSC Request/give oceanic/STAR clearances • D-ATIS Request/give terminal information Supplementing voice for routine/strategic messages
System Scope • Airlines: Avionics Modifications • HMI, CMU, radios (FMS) • ATSPs: ATC System Modifications • HMI, FDPS • CSP: Communications Infrastructure • routers, transmitters/receivers • RTCA/EUROCAE specifications
What will the Agency do? • provide a forum for technical and operational discussions, • agree implementation scenarios, • track and communicate progress, • initiate changes to ICAO regulation • co-ordinate, • facilitate, • support.
VDL-Mode 2 (ATN) First Airports First ACC’s LINK Area Pioneers Forward-Fit Retrofit Implementation Schedule COM Infrastructure Services ATN Avionics 2000 2001 2002 2003 2004 2005 2006 2007
Implementation Planning Decision Get common understanding and commitment through -Master Plan -Business Case Implementation April 1999 November 2000 2007
Business Case (Strategic) • Higher safety levels • Extra capacity • Essential for more ATC automation • Global communication “Data link is essential, it’s inevitable and it’s coming” (AA)
Business Case (CBA) • Airline lead initiative • Using Boeing facilities • Allows variation of input • Data sources: • ACC costs: ATSP • aircraft upgrade: Airbus & Boeing • operating costs: CSP • benefits: simulations 4% capacity with 25% equipage
Business Case (CBA) “Data link is an essential step to future concepts”
Effective VHF spectrum use is a critical factor in the provision of air traffic capacity • However, frequency assignment is already a major problem • There is a need to use the spectrum more efficiently • The use of data link offers the potential for better spectrum utilisation
Allowing controllers to focus on air traffic control could significantly increase capacity • This would lead to improved safety and reduced delays