20 likes | 126 Views
CMID REPORT SEQUENCES. This report is prepared along the following headings of: 1. 0 Background of Company Cooperate Mission Vision Range of Engineering Consultancy Range of Services Bank Facilities (If any) Asset and Machinery Previous and on going project Company membership (if Any)
E N D
CMID REPORT SEQUENCES This report is prepared along the following headings of: 1. 0 Background of Company • Cooperate Mission • Vision • Range of Engineering Consultancy • Range of Services • Bank Facilities (If any) • Asset and Machinery • Previous and on going project • Company membership (if Any) • Corporate Information (detail) • Organisation Chart • Personal Information staff 2.0 Background of Project • Introduction • Objective • Problem Statement • Project Particular • Scope of Project • Project Planning • The join venture company (if Any) • 3.0 Feasibilities Studies Report • 3.1 Site Preparation and Analysis • Strategy Located • Existing Condition • Site analysis (photograph, Map, etc) • Topography • Soil investigation data • Or Surveying data • Or water related data, etc • 3.2 Preliminary Studies • SWOT Analysis of Proposed Project • Advantage of The Project • 3.3 Project Development Cost • Introduction • Development Program • Assumption • Estimated Project Development Cost • Pre Development Cost • Construction Cost (building/road/water structure/infrastructure, etc) LINTON UNIVERSITY COLLEGE SCHOOL OF CIVIL ENGINEERING
4.0 Agreement with Specification • Procurement Methods • Contract Agreements • Contract Document • Condition • Form of Tender • Special of provision • Letter of Acceptance • Contract Drawing • Specification of infrastructure (building, road, etc) • 5.0 Detail Design Development + Drawing • Introduction • Plan and Elevation • Structural/Road/Water structure Design (using Staad pro/Mx Road/etc) • (3D)+crosss Section detail----- emphasize…!!!!! • Standard Code (BS. AASHTO, etc) • 6.0 Infrastructure and Utilities • Parking and road network • Electricity • Water Supply • Sewerage and Drainage system • Etc • 7.0 Project management Technique • Project Schedule and Planning • Work Breakdown Structures • Gantt Chart (use Microsoft Project) • Critical Path Methods (CPM) • 8.0 Health Safety Aspect and Construction methods • Introduction • Health and safety project • Safety Management • Regulation building/road/water treatment for health and safety • Procedures of Works • Quality Management (QA/QC) • Machinery and Material management • Procedures of works • Surveying work • Piling • RC • Or earthwork • Cut and fill • Retaining wall, etc • 9.0 Conclusion and Recommendation • References • Appendices LINTON UNIVERSITY COLLEGE SCHOOL OF CIVIL ENGINEERING