1 / 2

CMID REPORT SEQUENCES

CMID REPORT SEQUENCES. This report is prepared along the following headings of: 1. 0 Background of Company Cooperate Mission Vision Range of Engineering Consultancy Range of Services Bank Facilities (If any) Asset and Machinery Previous and on going project Company membership (if Any)

dex
Download Presentation

CMID REPORT SEQUENCES

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CMID REPORT SEQUENCES This report is prepared along the following headings of: 1. 0 Background of Company • Cooperate Mission • Vision • Range of Engineering Consultancy • Range of Services • Bank Facilities (If any) • Asset and Machinery • Previous and on going project • Company membership (if Any) • Corporate Information (detail) • Organisation Chart • Personal Information staff 2.0 Background of Project • Introduction • Objective • Problem Statement • Project Particular • Scope of Project • Project Planning • The join venture company (if Any) • 3.0 Feasibilities Studies Report • 3.1 Site Preparation and Analysis • Strategy Located • Existing Condition • Site analysis (photograph, Map, etc) • Topography • Soil investigation data • Or Surveying data • Or water related data, etc • 3.2 Preliminary Studies • SWOT Analysis of Proposed Project • Advantage of The Project • 3.3 Project Development Cost • Introduction • Development Program • Assumption • Estimated Project Development Cost • Pre Development Cost • Construction Cost (building/road/water structure/infrastructure, etc) LINTON UNIVERSITY COLLEGE SCHOOL OF CIVIL ENGINEERING

  2. 4.0 Agreement with Specification • Procurement Methods • Contract Agreements • Contract Document • Condition • Form of Tender • Special of provision • Letter of Acceptance • Contract Drawing • Specification of infrastructure (building, road, etc) • 5.0 Detail Design Development + Drawing • Introduction • Plan and Elevation • Structural/Road/Water structure Design (using Staad pro/Mx Road/etc) • (3D)+crosss Section detail----- emphasize…!!!!! • Standard Code (BS. AASHTO, etc) • 6.0 Infrastructure and Utilities • Parking and road network • Electricity • Water Supply • Sewerage and Drainage system • Etc • 7.0 Project management Technique • Project Schedule and Planning • Work Breakdown Structures • Gantt Chart (use Microsoft Project) • Critical Path Methods (CPM) • 8.0 Health Safety Aspect and Construction methods • Introduction • Health and safety project • Safety Management • Regulation building/road/water treatment for health and safety • Procedures of Works • Quality Management (QA/QC) • Machinery and Material management • Procedures of works • Surveying work • Piling • RC • Or earthwork • Cut and fill • Retaining wall, etc • 9.0 Conclusion and Recommendation • References • Appendices LINTON UNIVERSITY COLLEGE SCHOOL OF CIVIL ENGINEERING

More Related