An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. December 6, 2006 Panama City – Bay County International AirportProjectUpdate

  2. 1970 1942 1995 Source: Panama City – Bay County Airport Authority

  3. Sector Overlay Plan Land Uses

  4. Economic Development • Airline / General Aviation • Aviation Related Industry • Thru-the-Fence Aviation Operations • West Bay Area Sector Plan • Regional Economic Development

  5. Feasibility Study Site Selection Study Sector Plan and DSAP State Permits FAA Environmental Impact Statement (EIS) Land Donation Agreement Design USCOE 404 Permit Permit Challenge Zoning Regulations Existing Airport Sale Finalize Funding Construction Major Milestones

  6. Design – Percent Complete • Site Development - 95% • Paving/Lighting/Navaids – 50% • Utilities – 50% • Terminal Building – 50% • Facilities (Rental Car, ATC, Maint., General Aviation, Public Safety) – 10% • Landscaping, Irrigation, & Signage – 30%

  7. Terminal Design • Leadership In Energy and Environmental Design (LEED) Certification • Silver Level – U.S. Green Building Council • 20% reduction in energy use required (30% design goal) • Approximately 100,000 sq. ft. (56,000 existing) • Includes Customs and Immigration