PSD upgrade - schedule/resources: e lectronics and cooling system F. Guber INR, Moscow

PSD upgrade - schedule/resources: e lectronics and cooling system F. Guber INR, Moscow. NA61 /SHINE upgrade workshop, CERN 3 – 5 March , 201 4. 2013: PSD upgrade July – September (Moscow) Development and construction of FEE/HV/control prototype

diamond
Download Presentation

PSD upgrade - schedule/resources: e lectronics and cooling system F. Guber INR, Moscow

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PSD upgrade - schedule/resources: electronics and cooling system F. Guber INR, Moscow NA61/SHINEupgrade workshop, CERN3– 5 March, 2014

  2. 2013: PSD upgrade • July – September (Moscow) • Development and construction of FEE/HV/control prototype • and test at test-bench at INR - DONE • October-November (CERN) • Assembling and test of new electronics for one module at CERN - DONE • November – December (Moscow) • Mass production of new PSD electronics– DONE • - December (CERN) • Development, construction and test of the cooling system prototype for • one PSD module based on Peltierelement with real TEC controller. • - DONE

  3. 2014: PSD upgrade plans/schedule (I) • January (Moscow) • - Test of 28 FEE/HV/control for 28 modules prototype • at INR – DONE • February – March, 9 (CERN) • - Assembling, installation and test of electronics and temperature control system at 28 modules at the PSDand test its readout with old PSD electronics (one-by- one module)- DONE • ------------------------------------------------------------- • March 10 –April 5 (Moscow) • Test of FEE/HV/control for the rest of 22 modules at INR test-bench. • -Development of the PSD stand alone slow control –O.Petukhov, S.Morozov. • Development of the PSD stand alone cooling control system - O.Petukhov, S.Morozov. • 5-12 April (Dubna) -Development of the PSD slow control for NA61 DCS – • Oleg, Sergei, Tobiasz

  4. 2014: PSD upgrade plans/schedule (II) • - April, 13 - 30 (CERN)- Installation of FEE/HV/control/cooling and test of the PSD electronics and temperature control system at NA61. • June, 1 - 15 (CERN) • Test of FEE/HV/cooling/control systems for the whole PSD with old PSD readout electronics. Fight with noises! • Integration of the PSD cooling monitoring systems into NA61 DCS-O.Petukhov • Test of the PSD platform. • Development of the PSD event display in the existing event browser – O.Petukhov • - September 8 – 30 (20-26 Sep: NA61 CM) • The PSD commissioning and test on cosmic; • October 25 - December 16 • PSD run preparation and calibration (muons, protons). • Participation in the physics p-Pb run • Operation of the PSD during the run ???

  5. PSD upgrade resources • Development and construction of the PSD FEE/HV/control • NA61 – INR agreement; • ~ 30 KCHF – INR in-kind contribution (workshop, travel, subsistence) • Development and construction of the PSD cooling & control system • ~ 12 KCHF - NA61 CF (materials) • ~ 6 KCHF – NA61 CF (subsistence, February, 2014) • ~ 12 KCHF – INR contribution(workshop, subsistence, travel) • ---------------------------------------------------- • Additional expenses are needed: • Power supply for cooling ~ 3K CHF (INR, if necessary) • Travel (tickets) ~ 9K CHF (INR) • Subsistence: ~ 50 kCHF is necessary! • - 18K CHF + (10 KCHF ??) - INR; • ~ 20 – 30 KCHF – ??

  6. Thank you