Cluster D Outbrief GENI Engineering Conference 5 Seattle, WA. July 22, 2009 www.geni.net. Cluster D Projects. ORCA-BEN (RENCI, Duke) ORCA control framework, clearinghouse BEN experimental optical network DOME (UMass – Amherst) Outdoor, mobile testbed ViSE (UMass – Amherst)
E N D
Cluster D OutbriefGENI Engineering Conference 5Seattle, WA July 22, 2009 www.geni.net
Cluster D Projects • ORCA-BEN (RENCI, Duke) • ORCA control framework, clearinghouse • BEN experimental optical network • DOME (UMass – Amherst) • Outdoor, mobile testbed • ViSE (UMass – Amherst) • Wireless sensor and actuator network • Kansei (Ohio State, Wayne State) • Sensor networks • Embedded Real-Time Measurements • Cross-layer, real-time measurements • Recently joined cluster, ready to begin prototyping phase
Cluster D Tasks to End of Spiral 1 • Overall: on track to end of Spiral 1 • ORCA • Release ORCA code (completed) • Setup clearinghouse at RENCI (due 8/1, on track)
Cluster D Tasks to End of Spiral 1 • Each substrate project (BEN, DOME, ViSE, Kansei) • Setup local container of ORCA actors, including broker (completed) • Formulate resource description and policies for substrate (completed) • Integrate researcher portal and substrate with ORCA actors (completed) (BEN includes stitching with NLR) • Move broker to RENCI (on track, due 8/1 – 9/1) (Kansei has separate broker at Wayne State) • Layer 2 connection to I2 backbone (due 10/1, some issues) (BEN has connection to NLR) • Allow other GENI researchers (due 10/1, on track)
Cluster D Spiral 2 Roadmap Process • Aim for GENI Spiral 2 goals • Most important: “Live Experiments” • Roadmap for Spiral 2 completed • Each item rated • Critical • Important • Not Important
ORCA Spiral 2 Roadmap Items • ORCA code (one C, four I items) • ORCA clearinghouse (one C, one I items) • Resource description mechanisms (C) (early Spiral 2) • Resource discovery mechanism (I) (mid Spiral 2) • VLAN connections to I2 (I) (early Spiral 2) • VLANs stitched between multiple testbeds (I) (mid Spiral 2) • Experiment control tools (portals) and Srvc Mgr for experiments across multiple testbeds (I) • Interface on Srvc Mgr for external exp cntrl tools (I) • Instrumentation improvements, repository (I) (end Spiral 2)