Cluster D Outbrief GENI Engineering Conference 5 Seattle, WA

Cluster D Outbrief GENI Engineering Conference 5 Seattle, WA. July 22, 2009 www.geni.net. Cluster D Projects. ORCA-BEN (RENCI, Duke) ORCA control framework, clearinghouse BEN experimental optical network DOME (UMass – Amherst) Outdoor, mobile testbed ViSE (UMass – Amherst)

dianne
Download Presentation

Cluster D Outbrief GENI Engineering Conference 5 Seattle, WA

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Cluster D OutbriefGENI Engineering Conference 5Seattle, WA July 22, 2009 www.geni.net

  2. Cluster D Projects • ORCA-BEN (RENCI, Duke) • ORCA control framework, clearinghouse • BEN experimental optical network • DOME (UMass – Amherst) • Outdoor, mobile testbed • ViSE (UMass – Amherst) • Wireless sensor and actuator network • Kansei (Ohio State, Wayne State) • Sensor networks • Embedded Real-Time Measurements • Cross-layer, real-time measurements • Recently joined cluster, ready to begin prototyping phase

  3. Cluster D Tasks to End of Spiral 1 • Overall: on track to end of Spiral 1 • ORCA • Release ORCA code (completed) • Setup clearinghouse at RENCI (due 8/1, on track)

  4. Cluster D Tasks to End of Spiral 1 • Each substrate project (BEN, DOME, ViSE, Kansei) • Setup local container of ORCA actors, including broker (completed) • Formulate resource description and policies for substrate (completed) • Integrate researcher portal and substrate with ORCA actors (completed) (BEN includes stitching with NLR) • Move broker to RENCI (on track, due 8/1 – 9/1) (Kansei has separate broker at Wayne State) • Layer 2 connection to I2 backbone (due 10/1, some issues) (BEN has connection to NLR) • Allow other GENI researchers (due 10/1, on track)

  5. Cluster D Spiral 2 Roadmap Process • Aim for GENI Spiral 2 goals • Most important: “Live Experiments” • Roadmap for Spiral 2 completed • Each item rated • Critical • Important • Not Important

  6. ORCA Spiral 2 Roadmap Items • ORCA code (one C, four I items) • ORCA clearinghouse (one C, one I items) • Resource description mechanisms (C) (early Spiral 2) • Resource discovery mechanism (I) (mid Spiral 2) • VLAN connections to I2 (I) (early Spiral 2) • VLANs stitched between multiple testbeds (I) (mid Spiral 2) • Experiment control tools (portals) and Srvc Mgr for experiments across multiple testbeds (I) • Interface on Srvc Mgr for external exp cntrl tools (I) • Instrumentation improvements, repository (I) (end Spiral 2)