1 / 7

DCal Funding and Start up in the US

DCal Funding and Start up in the US. Funding. US Participation in DCal : Latest, Highly Technical Feedback: US DOE says participation in DCal at the level of 3SM is “ No Brainer”* US Idiom Dictionary: “No Brainer” = A decision that can be made without serious thought

diata
Download Presentation

DCal Funding and Start up in the US

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. DCal Funding and Start up in the US

  2. Funding US Participation in DCal: Latest, Highly Technical Feedback: US DOE says participation in DCal at the level of 3SM is “No Brainer”* US Idiom Dictionary: “No Brainer” = A decision that can be made without serious thought Something that is obvious Super Module Installation Test Near the 90 degree position

  3. ALICE - EMCal The DOE has confirmed that they prefer to reconfigure the two 1/3 EMCal SMs as the first US DCal SM => One DCal SM already funded by US part of EMCal project

  4. Assuming material availability DCal Production Start Date is approximately March 26th. Super Module Installation Test Near the 90 degree position

  5. Funding • Full proposal to DOE due February 26th • Cost and Schedule Finalized • New Simulation Studies: • pi_zero + Jet model studies with Qpythia • => geometric bias • Jet + Jet di-jet energy balance • studies with Qpythia • => path length in-medium Super Module Installation Test Near the 90 degree position

  6. Super Module Installation Test Near the 90 degree position

  7. EMCal Parameters Super Module Installation Test Near the 90 degree position

More Related