500 likes | 675 Views
DAFNE UPGRADE. DA F NE Upgrade Team. Scientific Committee-May 14-15, 2007 LNF - Italy. Crabbed Waist in 3 Steps. Large Piwinski’s angle F = tg( q)s z / s x Vertical beta comparable with overlap area b y s x / q Crabbed waist transformation y = xy’/(2 q ). P. Raimondi, November 2005.
E N D
DAFNE UPGRADE DAFNE Upgrade Team Scientific Committee-May 14-15, 2007 LNF - Italy
Crabbed Waist in 3 Steps • Large Piwinski’s angle F = tg(q)sz/sx • Vertical beta comparable with overlap area bysx/q • Crabbed waist transformation y = xy’/(2q) P. Raimondi, November 2005
Crabbed Waist Advantages • Geometric luminosity gain • Very low horizontal tune shift • Large Piwinski’s angle • F = tg(q)sz/sx • 2. Vertical beta comparable • with overlap area • bysx/q 3. Crabbed waist transformation • y = xy’/(2q) • Geometric luminosity gain • Lower vertical tune shift • Vertical tune shift decreases with oscillation amplitude • Suppression of vertical synchro-betatron resonances • Geometric luminosity gain • Suppression of X-Y betatron and synchro-betatron resonances
Parameters used in simulations L => 2.2 x 1033 cm-2 s-1
SIDDHARTA IR Luminosity Scan Crab On --> 0.6/q Crab Off Lmax = 2.97x1033 cm-2s-1 Lmin = 2.52x1032 cm-2s-1 Lmax = 1.74x1033 cm-2s-1 Lmin = 2.78x1031 cm-2s-1
Dynamic Aperture D.Shatilov, M.Zobov Dynamic Aperture tune scan Luminosity tune scan
Off Energy Dynamic Aperture D.Shatilov, M.Zobov
Beam Lifetime Comparison between Siddharta and FINUDA lattices for the same beam parameters RF 1% No scrapers Touschek lifetime is evaluated taking into account vacuum chamber aperture but no dynamic aperture S. Guiducci
Trajectories of Touschek particles generated all along the ring that get lost at the IR Simulation shows how collimators strongly reduce background at the IR SCHPS101 SCHPL201 SCHPL110 IP SCHPL101 SCHPS201 Set of scrapers minimizing IR background SCHPL101 = 8.5sx = 11 mm (moved at s = -8.2 m from IP) SCHPL110 = 18sx = 18 mm SCHPS201 = 21 sx = 21 mm (moved at s = -44 m from IP) M. Boscolo
Beam lifetime as a function of the scraper’s aperture S. Guiducci
New Crossing Regions Layout • remove splitters (on both interaction regions) • new vacuum chambers for IP regions • adjust dipole fields and position (Blong lower, Bshort higher - splitters power supplies) • new permanent magnets in the IP1 region • readjust all the other elements (quads, sexts etc) • new components construction (kickers, bellows, diagnostics, etc) • new vacuum system for IP regions
New beam line Crossing Region layout cont. IP QF1s QD0s
150 W F.Marcellini and D. Alesini mode1 mode2 mode3 mode4 • Aluminum made (very cheap) • Thin window thickness= 0.3 mm • Mechanical and Vacuum test done • Construction in progress permanent SmCo quads
new compensator position, will not installed in SIDDHARTA setup new pumping system needed to replaceprevious slitter pumping system power new bellows
New Shielded bellows Axial working stroke = ±5 mm Radial offset = ±3 mm • HFSS simulation • Beam excited fields in the bellows structure • No significant fields in the volume beyond the shield F.Marcellini, G. Sensolini
tilted and separately powered dipoles bellows crab sextupoles compensator
“half moon” chamber complete beam separation shape to fit inside existing quads
IP2 Y is completely symmetric to IP1 except forcrab waist sextupoles and compensator
New Injection Kickers New injection kickers with 5.4 ns pulse length have been designed to reduce the perturbation on the stored beam during injection VT VT 3 bunches 50 bunches t t present pulse length ~150ns (old kickers) FWHM pulse length ~5.4 ns • Expected benefits: • higher maximum stored currents • Improved stability of colliding beams during injection • less background allowing acquisition on during injection F. Marcellini, D. Alesini, G. Sensolini , S. Pella
Fast Kickers • Kicker prototype preliminary test performed • Kicker final design completed • Pulse generator prototype under test (80 hours tested @3Hz done) • 50 KV final feedthrough will be tested next week • Delivery of the first Kicker by the end of May • Engineering of pulse system supply and controls implementation already order to the manufacture • Improved pulser version by the end of May • Remote controls implementation for August F. Marcellini, D. Alesini, G. Sensolini, S. Pella
VACUUM CHAMBER modifications • 80 m long of storage ring reshaped (40% of DAFNE storage ring) • 70 m long of new vacuum chambers designed and under manufacturing • Designed new shielded bellows • Vacuum plant upgraded; quotation for new pumping units in progress • New fast kickers manufacturing in progress
SIDDHARTA Kaon monitor bhabha monitor gamma monitor lead shield focusing quads SIDDHARTA Setup
Machine luminosity monitors and IP diagnostics tool • e+ e- e+ e-g (8.5e-26 cm-2s-1@E>100MeV, 95% 1.7mrad)e+ e- e+ e- Z g (<10% background) • e+ e- e+ e-g g (6.6e-29 cm-2s-1@E>100MeV, 15% 1.7mrad)now limited by accidentals (@10^32 and chamber vertical acceptance) • e+ e- e+ e-Bhabha scattering - more clean process312.5 Hz @ 18o<q<27o @ 1033cm-2 s-1 F. Bossi, P. Branchini, B. Buonumo, G. Mazzitelli, F.Murtas, P.Valente DAFNE-KLOE collaboration with the support of SSCR
Luminosity monitor for SIDDAHRTA run TILE CALORIMETER g MONITOR PbWO4 crystal GEM RING
Tile Bhabha calorimeter (lumi) • 4 calorimeter composed by 5 30o sectors • 7 lead sheet 5mm - 3 final lead sheet 10mm • 12 30o scintillating tile for sector • 3 WLS each tile • 1 PM for any sector (20 PM) • 12.5 X0 15% resolution @ 510 MeV • First tail Russian sample arrived • WLS installed and light emission tested • BTF test planed for October • PM, Electronics and DAQ by KLOE
A 3GEM Monitor for DAFNE rectangular GEM prototype under test @ DAFNE 10 cm 2.4 cm Annular gem foil design for bhabha detector@ DAFNE 2.4 cm 64 pads 10 cm The read out has been realized using 8 chip ASDQ (8 channel each) Test at BTF 99% efficiency for electron (signal in bhabha measure) ~ 1% efficiency for photons (background in bhabha measure) 32 + 32 channels
3GEM monitor test on DAFNE On April 2007 the 3gem chamber has been put at zero degree on DAFNE for photon detection coming from the FINUDA interaction region e - 3GEM e + lead beamstrahlung g number of photon vs timeand FINUDA luminosity photon spot-size
Luminosity and crossing angle + crossing angle q (Piwinski angle F) luminosity is limited by hourglass and tune-shift effects high density N low by low sx y y by by z z The introduction of a crossing angle do NOT improve luminosity
luminosity and tune-shift bat allows to play with transversal dimension sx and by optical function, kipping limited the vertical tune-shift and strongly depressing horizontal tune-shift • sz large sx small bat a large Piwinski angle can generate strong sincro-bethatron oscillation
Suppression of X-Y Resonances Horizontal oscillations sextupole • Performing horizontal oscillations: • Particles see the same density and the same (minimum) vertical beta function • The vertical phase advance between the sextupole and the collision point remains the same (p/2)
Increase Positron Current • New Injection Kickers • New Feedback Systems • Ti-Coating
Wiggler linearization CURVED POLE Reduction of the octupole around the beam trajectory in the region of the poles Proposed by Pantaleo MOVING MAGNETIC AXIS Compensation of the integrated octupole in each semiperiod S. Bettoni 28/3 New method
Shifted Poles Model S. Bettoni 28/3 For the moment shifted the coils with the poles
Analysis of the results: comparison with the experimental data S. Bettoni 28/3