1 / 11

API S64, 3 rd Edition.

API S64, 3 rd Edition. 18 Dec 2013 Update. API S64. Chair Tony Hogg Co-Chair Open Current Edition 2nd Edition, November 2001 Listing of Meetings 8 Nov 2012, 20 Dec 2012, 13 Mar 2013, 1 May 2013, 18 Jul 2013, 7 Aug 2013, 2 Oct 2013, 23 Oct 2013, 20 Nov 2013, 18 Dec 2013

dior
Download Presentation

API S64, 3 rd Edition.

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. API S64, 3rd Edition. 18 Dec 2013 Update

  2. API S64 • Chair • Tony Hogg • Co-Chair • Open • Current Edition • 2nd Edition, November 2001 • Listing of Meetings • 8 Nov 2012, 20 Dec 2012, 13 Mar 2013, 1 May 2013, 18 Jul 2013, 7 Aug 2013, 2 Oct 2013, 23 Oct 2013, 20 Nov 2013, 18 Dec 2013 • Anticipated Ballot • 2014 • Issues • None; we are making progress. • Comments • Next scheduled meeting is 12 Feb 2014.

  3. API S64 Scope • This standard is intended to provide information on the design, installation, maintenance, testing, and operation of the diverter system and associated components. • It will also provide a general overview of operating procedures. • This document will change from a Recommended Practice to a Standard to both allow the inclusion of the design details and also to give more ‘weight’ to the maintenance, testing and operation requirements.

  4. Diverter System Design • This standard is intended to provide information on the design,installation, maintenance, testing, and operation of the diverter system and associated components. • There has not been any prior guidance on the design of a diverter system from API. • We are correcting this anomaly with the new edition of this document.

  5. Diverter System Installation • This standard is intended to provide information on the design, installation, maintenance, testing, and operation of the diverter system and associated components. • Installation is also closely associated with design and selection as it will cover pipe sizes, routing, targets, bends, supports, etc.

  6. Diverter System Maintenance • This standard is intended to provide information on the design, installation, maintenance, testing, and operation of the diverter system and associated components. • Maintenance shall be performed every 90 days, after each well, or in accordance with documented equipment owners reliability data, whichever is greater. • A Product History File shall be kept for each major component.

  7. Diverter System Testing • This standard is intended to provide information on the design, selection, installation, maintenance, testing, and operation of the diverter system and associated components. • Function testing will follow the frequencies prescribed by API S53. • Pressure and flow testing are being discussed. • This is not a pressure controlling system. • Do we need to pressure test? • What exactly would we test? • When would we test? • Flow testing could cause pollution.

  8. Diverter System Operation • This standard is intended to provide information on the design, selection, installation, maintenance, testing, and operation of the diverter system and associated components. • Suggested operating procedures will include planning and training topics.

  9. Diverter Control System • We have discussed the control system requirements with our API 16D colleagues to the point where API S64 will simply refer to API 16D 3rd Edition for the control requirements.

  10. Moving forward……. • We are still focusing on floating rig use. • We will review the completed document to see what, if anything, contradicts or conflicts from a land or jack-up perspective. • The volume of such contradictions/conflicts will help us determine whether we need a second document.

  11. Active Participants

More Related