Power Sector Market Functions and Stakeholders

This article discusses the important market functions in the power sector and the key stakeholders involved, including government organizations, regulators, service providers, and market players. It also provides an overview of the regulatory framework and the roles of the system operator in generation planning and transmission operations.

dmicheal
Download Presentation

Power Sector Market Functions and Stakeholders

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Important Market FunctionsEMP @ LUMS Sep 16-20, 2019 www.cppa.gov.pk

  2. Power Sector Stake-holders GoP MoE NEPRA NTDC AEDB WAPDA CPPA-G PPIB NPCC IPPs K Electric DISCOs GENCOs ‘Vital link’ between the administrators, planners & regulators on one end and physical system and market players on the other end www.cppa.gov.pk

  3. Institutions – Regulator and Service Providers www.cppa.gov.pk

  4. Regulator www.cppa.gov.pk

  5. Market Operator www.cppa.gov.pk

  6. Transmission Network Operator www.cppa.gov.pk

  7. Distribution Service Provider www.cppa.gov.pk

  8. Metering Service Provider www.cppa.gov.pk

  9. System Operator www.cppa.gov.pk

  10. Regulatory Framework of System Operations • Operation of power system regulated under NEPRA’s Grid Code • OC-1 : General operating principles • OC-2 : Demand Forecast • Input from all stakeholders for different time horizons consolidated by NPCC • OC-3 : Demand Management • OC-4: Operational Planning • Network operation and outage planning / coordination • Generation dispatch and outage coordination • Insufficient power operating margin • Frequency and voltage control and operating margins www.cppa.gov.pk

  11. System Operator • Roles of the system operator can be broadly classified in two categories: • Generation planning and dispatch • Transmission operations and control www.cppa.gov.pk

  12. Generation Planning & Dispatch Procedure and steps. • Generation forecasting/estimation on daily, weekly, monthly, quarterly, yearly basis keeping in view: • Irrigation indents of Hydel stations • Schedule outages • Forced outages • Constraints if any • Demand forecasting/estimation on historical trends • Dispatch of available generation in merit order. www.cppa.gov.pk

  13. Transmission Operation and Control Objectives: • Keeping stable voltages over primary network • Monitoring of transmission & transformer parameters Operations: • Planned shutdowns for maintenance, cleaning and washing activities • Emergent shutdowns in case of abnormal situations. • Transmission lines and transformers tripping. www.cppa.gov.pk

  14. Generation Demand Balance and Dispatch of Electric Power www.cppa.gov.pk

  15. Managing Demand Fluctuations www.cppa.gov.pk

  16. Forecast Real-time Contingency Contingency Re-schedule / Adjustment Typical Dispatch Deviations Schedule 1000 MW Peak Generators Adjusted Schedule Load Following / Intermediate Generators Must Run + Base Load Generators Hours www.cppa.gov.pk

  17. Unit Commitment, Scheduling and Dispatch • The process of continuously adjusting the output of power plants to meet electricity demand is known as dispatch of power plants. • There are actually two stages to the dispatch process, and they occur over different time horizons. • Scheduling / Commitment: occurs a day or more in advance of the need to meet real-time electricity demand • Dispatch: where the scheduled plants are selected to run at a given level to meet total electricity demand • The dispatch decision is driven primarily by economic factors, but other types of operational considerations such as ramp rates and minimum run times are also considered in the dispatch decision www.cppa.gov.pk

  18. Scheduling Process • Hourly Generation availability notice by Power Producers for scheduled day • Day ahead energy assessment of hydro plants based on allowed indents and hourly scheduling of hydro resources • Hourly Demand Forecast by SO for scheduled day • Hourly notice of generation required from each generator by SO (indicative) based on forecasted demand www.cppa.gov.pk

  19. Real Time Dispatch • Demand is continuously varying in time • Every MW of power required at any point in time must be supplied at the same instance • Indication to SO – System Frequency Frequency = 50 Hz Frequency < 50 Hz Generation Generation Demand Demand www.cppa.gov.pk

  20. Thank You Questions??? www.cppa.gov.pk