An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Allocating Time on the Hubble Space Telescope Olivia Gillham

  2. Contents • What is Hubble Space Telescope? • Current scheduling framework • Formalization as a scheduling problem • Optimization of basic problem • Additional issues • Recommendations

  3. What is Hubble Space Telescope? • 2.4 meter mirror collects light (and some forms of radiation), directs it to scientific instruments • Orbits 569 km above the Earth • Solar-powered • Location above Earth’s atmosphere provides unusual clarity - no distortion or absorbtion • Completes an orbit every 97 minutes

  4. Who gets to use Hubble? • Anyone can apply for time on Hubble • Proposals are submitted and reviewed annually • Proposals are accepted based on their value to the scientific community • Mostly professional astronomers, but amateurs are occasionally approved

  5. How are proposals selected? • Time Allocation Committee(TAC) composed of international experts selects proposals based on their value to the scientific community • TAC tries to select even proportions of long, medium, and short projects • Director of Space Telescope Science Institute (STScI) approves selection

  6. How are projects scheduled? • STScI scheduling experts form a tentative long-range schedule for the year • Detailed schedules are created ~ 3 weeks ahead of time and transmitted to Hubble weekly

  7. Contents of a Phase I Proposal • A summary of the observations requested • The scientific justifications for the project. • A list of targets with their celestial coordinates. • The instrument(s) to be used with desired modes, filters, and dispersers. • An estimate of the number of spacecraft orbits needed to accomplish the observing program

  8. Basic Formalization • Single machine • pj = # orbits required • wj = scientific value • All jobs must be completed within 1 year, so dj = D = 1 year = 5422 orbits • Maximize value => minimize weight of tardy jobs = sum of wjUj. • 1/ dj=D /sum wjUj = knapsack! • Dynamic algorithm runs in O(nD)~O(5.5mil)

  9. Complications • “Snapshot” proposals requiring 45 minutes or less (<1/2 orbit) are prioritized • Targets of Opportunity(TOO) occur at unknown times • Unforeseen celestial events • Set-up times (to lock on to new coordinates) vary • STScI Director allots 10% of total time (usually to TOO and projects too large to be approved by the committee)

  10. Snapshots can be treated as normal jobs, pj ≤ .5 • Targets of Opportunity have unknown rj, dj, but wj and pj are known, so they can be included in the selection process • Unforeseen events have unknown parameters - online scheduling scenario • Weekly programming means we can address TOO and unknown jobs dynamically, as they come up • Create original schedule for 90% of total time, or 4880 orbits

  11. Further Complications • Some jobs can only be completed at certain times of the year (differing rj and dj) • Set-up time between jobs varies (locking onto guidance stars) • Both can be incorporated into the formal model as stochastic elements, but complicate the solution enormously

  12. Blue box = set-up White box = observation Pink bars = target blocked Red bars = guide star blocked

  13. Preliminary Recommendations • Re-allocate responsibility so that TAC expert committee assigns weights, STScI scheduling staff selects and schedules • Include snapshots, TOOs, and “too long” projects in weighting and selection • Dynamic knapsack algorithm on 4880 orbits provides initial “optimal” solution • Use Director’s time primarily for TOOs and unexpected events, possibly reducing from 10%

  14. Q&A

  15. References • Villard, Ray “The Hubble Space Telescope Observing Program.” http://www.nasa.gov/mission_pages/hubble/servicing/series/How_science_is_done.html • “Hubble Essentials.” Hubble Site http://hubblesite.org/the_telescope/hubble_essentials/ • Space Telescope Science Institute, Hubble Space Telescope. http://www.stsci.edu/hst/