What successful Cost Estimators know….and you should, too. ELEMENTAL COST ANALYSIS (ECA). Prepared by: Assoc. Prof. Sr Dr. Mastura Jaafar. WHAT IS ECA ?.
E N D
What successful Cost Estimators know….and you should, too. ELEMENTAL COST ANALYSIS (ECA) Prepared by: Assoc. Prof. Sr Dr. Mastura Jaafar
WHAT IS ECA? As a systematic breakdown of the cost of a building to a Client into various building/construction elements in terms which are meaningful to both Client and the members of the Design Team. (ISM)
OBJECTIVES OF THE ECA • To enable the Design Team to determine how much had been spent on each building element. • To assess whether a balanced distribution of costs have been achieved amongst the various elements of the building. • To provide comparison of costs of the same elements that may be used in different buildings. • To obtain cost data for use in the cost planning for other projects.
BRIEF SPECIFICATION • Brief specification in the ECA describes the type and quality of materials to be used in project. • Usually consists of 6 elements: substructure, superstructure, finishes, fittings and furnishings, services and external works
BASIC ELEMENTS • Basic elements
BASIC ELEMENTS (CONT.) • Basic elements
COST PLANNING • To be able to carry out elemental estimating based on historic data. • This data is then manipulated to suit the requirements of the current project under consideration. • A good cost planning will store its data in the appropriate form for later retrieval. This usually takes the form of elemental cost analysis.
COST PLANNING • Form 1 • Calculating Gross Floor Area (GFA) and Total Cost of Element – Form 2 • Up date specifications – Form 3 • The Cost Estimate for the new project is ready. PROCEDURE
FORM 1 Type of building