1 / 21

8798 10/10

50 Years of History and More to Come. 8798 10/10. -----------------------------------------------------------------------------. 1950 1955 1960 1965 1970 1975 1980 1985 1990 1995 2000 2005. Fernald Area. 8798 10/10.

Download Presentation

8798 10/10

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 50 Years of History and More to Come 8798 10/10

  2. ---------------------------------------------------------------------------------------------------------------------------------------------------------- 1950 1955 1960 1965 1970 1975 1980 1985 1990 1995 2000 2005 Fernald Area 8798 10/10

  3. ---------------------------------------------------------------------------------------------------------------------------------------------------------- 1950 1955 1960 1965 1970 1975 1980 1985 1990 1995 2000 2005 National Concerns 8798 10/10

  4. ---------------------------------------------------------------------------------------------------------------------------------------------------------- 1950 1955 1960 1965 1970 1975 1980 1985 1990 1995 2000 2005 First Link Feed Materials Production Center Large-scale, integrated facility designed to produce high-purity uranium metal for the U.S. Department of Energy defense programs. 8798 10/10

  5. ---------------------------------------------------------------------------------------------------------------------------------------------------------- 1950 1955 1960 1965 1970 1975 1980 1985 1990 1995 2000 2005 Feed Materials Production Center Production Mission 8798 10/10

  6. ---------------------------------------------------------------------------------------------------------------------------------------------------------- 1950 1955 1960 1965 1970 1975 1980 1985 1990 1995 2000 2005 Feed Materials Production Center Production Mission 1951–1989 • Converted uranium ore into high-purity uranium metal through chemical and metallurgical processes • Construction began in 1951 • Operational in 1952 • Facility designed for 1,200 employees/3,000 in 1962 • Production contractors: National Lead of Ohio/Westinghouse • Produced 500 million pounds of uranium metal 8798 10/10

  7. ---------------------------------------------------------------------------------------------------------------------------------------------------------- 1950 1955 1960 1965 1970 1975 1980 1985 1990 1995 2000 2005 Community Cleanup Mission Community involvement • Future use of the site • Cleanup levels • Balanced approach to waste disposition 8798 10/10

  8. ---------------------------------------------------------------------------------------------------------------------------------------------------------- 1950 1955 1960 1965 1970 1975 1980 1985 1990 1995 2000 2005 Cleanup Cleanup Mission • Operable Unit 1 – Waste pits • Operable Unit 2 – Other waste units • Operable Unit 3 – Production area • Operable Unit 4 – Silos • Operable Unit 5 – Environmental media (soil, groundwater, surface water) 8798 10/10

  9. ---------------------------------------------------------------------------------------------------------------------------------------------------------- 1950 1955 1960 1965 1970 1975 1980 1985 1990 1995 2000 2005 Cleanup Cleanup Mission 8798 10/10

  10. ---------------------------------------------------------------------------------------------------------------------------------------------------------- 1950 1955 1960 1965 1970 1975 1980 1985 1990 1995 2000 2005 Cleanup Cleanup Mission • Partnering for a higher cleanup standard – Fernald Citizens Advisory Board – Citizen and community groups – U.S. EPA and Ohio EPA – Contractor – U.S. Department of Energy • Remediation infrastructure • $4.4 billion cleanup and restoration – OSHA recordable rate of 0.74 (DOE average 1.9, construction average 5.9) • Worker transition – $20 million invested in “life after Fernald” – Staffed Career Development Center – Over 600 degrees/certificates achieved 8798 10/10

  11. Fernald Preserve Legacy Mission Manage DOE’s post-closure responsibilities and ensure the protection of human health and the environment. 8798 10/10

  12. Fernald Preserve Legacy Mission As a community asset, the Fernald Preserve will foster wildlife habitat and provide educational opportunities through environmental stewardship. 8798 10/10

  13. Long-Term Surveillance and Maintenance Legacy Mission 8798 10/10

  14. Long-Term Surveillance and Maintenance Legacy Mission 8798 10/10

  15. Land Use Legacy Mission • 395 acres of forest • 332 acres of prairie • 120 acres of OSDF • 81 acres of wetland • 60 acres of open water • 33 acres of savanna • 29 acres of infrastructure 8798 10/10

  16. Nature Legacy Mission 8798 10/10 8798 10/10

  17. Visitors Center Legacy Mission • Public Reading Room • Exhibits – History and cultural – Production mission – Cleanup mission – Legacy mission – Environmental and ecological • Education programs • Community meeting room 8798 10/10

  18. Visitors Center Legacy Mission 8798 10/10

  19. Fernald Preserve Legacy Mission 8798 10/10

  20. Fernald Preserve

  21. 8798 10/10

More Related