Lecture 22- Exterior Cladding Systems a.k.a skins

Lecture 22- Exterior Cladding Systems a.k.a skins. ARCH 330 Materials & Methods Fall 2008. Cladding/ Curtain Wall. Constructed in Place Prefabricated. Cladding. A.K.A Skin Curtain Wall – glass + metal systems. Cladding. Non-load bearing exterior wall enclosure.

dooley
Download Presentation

Lecture 22- Exterior Cladding Systems a.k.a skins

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Lecture 22- Exterior Cladding Systems a.k.a skins ARCH 330 Materials & Methods Fall 2008

  2. Cladding/ Curtain Wall • Constructed in Place • Prefabricated

  3. Cladding A.K.A Skin Curtain Wall – glass + metal systems

  4. Cladding • Non-load bearing exterior wall enclosure. • Most visible, most subject to attack by natural forces. • Separates indoor environment from outdoors in such a way that the indoor environment can be maintained at a level suitable for the building's intended use.

  5. Primary Functions of Cladding • Keep Water Out • Prevent Air Leakage • Control Light (heat, glare, ultraviolet) • Control Radiation of Heat  • Control Conduction of Heat • Control Water Vapor  • Control Sound

  6. Secondary Functions of Cladding • Resist Wind Forces:  • Adjust to Movement: Thermal expansion and contraction, Moisture expansion and contraction, Structural deflections. • Resist Fire • Weather Gracefully

  7. Forces that Move Water • Gravity • Momentum • Surface Tension • Capillary Action • Wind/ Air Currents

  8. Rainscreen Principle • Let wind pressure differences between the outside and inside neutralize themselves

  9. PECPressure Equalization Chamber • Pressure equalized wall design • Airtight barrier at the internal side • Rainscreen - loose fitting jointed layer • Current of air can pass back and forth through the unsealed joints.

  10. Sealant Joints in Cladding • Fill/seal the joints • Prevent flow of air and/or water • Permit assembly tolerance • Permit movement

  11. Design Process - Prefabricated (a) Curtain wall manufacturer selected and made a part of the building design team from the first stages of the project. (b) The architect prepares a rough design and performance specification and submit these to several manufacturers for proposals.

  12. STICK 1. Anchor 2. Mullion 3. Horz rail 4. Spandrel panel 5. Horz rail 6. Glass

  13. Constructed in Place Stiffening Method • Steel Sub Frame • Back-up Wall of Masonry • Back-up Wall of Light Gauge Studs

  14. Prefabricated Method of Assembly • Stick • Unit • Unit + Mullion • Panel • Column Cover + Sprandrel

  15. Masonry • Constructed in place • Prefabricated

  16. Metal + Glass • Prefabricated

  17. Structural Glass

  18. Gehry - Guggenheim

  19. Nicholas Grimshaw and Partners Ludwig Erhard Haus Financial Centre