1 / 25

PSE&G Condition-Based Maintenance

PSE&G Condition-Based Maintenance. Angela Rothweiler October 13, 2009 PI Seminar - Philadelphia. Agenda. Background Problem Solution Asset Registry CMMS Functional Areas Data Collection Condition Assessment & Criticality Inspection Process Example Critical Success Factors.

dooley
Download Presentation

PSE&G Condition-Based Maintenance

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PSE&G Condition-Based Maintenance Angela RothweilerOctober 13, 2009PI Seminar - Philadelphia PSEG T&D CBM

  2. Agenda • Background • Problem • Solution • Asset Registry • CMMS Functional Areas • Data Collection • Condition Assessment & Criticality • Inspection Process • Example • Critical Success Factors 2009 PI Seminar - Philadelphia PSEG T&D CBM

  3. Background • Utility Overview • New Jersey Based • Total Assets ~ $14 Billion • Total Revenue ~ $7 Billion • Service Territory • 70% of New Jersey’s population • 2.0 million Electric customers • 1.6 million Gas customers • 2,600 Square Miles • Delivery Implementation • 1999 – SAP • 2000 - OMS, GIS & CAD • 2002 - CMMS PSEG T&D CBM

  4. Problem • No predictive maintenance program or strategy • Significant liability risk and system outage potential from old equipment vulnerable to failure • Limited assessment tools for determining asset condition • Decreasing expertise in both field maintenance and engineering • No formalized capital spending program • Asset Information in a variety of disparate systems Asset Population by Division and Age Class Within Equipment PSEG T&D CBM

  5. Inside Plant Electric Asset Registry • Equipment & Locations • Class and Characteristics • Nameplate • Maintenance Plans (56k Plans) • Calendar-based • Counter-based • Condition-based • Notifications • Damage and Cause Codes grouped by Equipment • Equipment Visibility • PM Plan Cost/Hours vs. Actual • CM Cost PSEG T&D CBM

  6. Data Collection Raw data Analysis & Reporting Measurementpoints Feedback Maintenance Management Notification Functional Areas • Data Collection • SAP Asset Information • Time-Series Data Collection Application • Diagnostic and Inspection Data • Asset Analysis and Reporting • Condition Assessment • Work Prioritization • Alerts / Notifications • Maintenance Management • Measurement Points • Maintenance Plan Modifications • Notifications PSEG T&D CBM

  7. Data Collection & Consolidation PI - OPC Doble Distribution SCADA Electrical test results Breaker Tests Transmission SCADA PI HDW Diagnostic data ESOC PI Transformer loads Delta-X MV90 Transformer oil analysis SAP-PM MDT Hydran PI Manual Logger SAP order history and technical object updates Weekly substation inspection Gas equipment results PSEG T&D CBM

  8. MDB Hierarchy Structure

  9. MDB Properties & Aliases

  10. Condition Assessment Overview • Calculation Structure • CA = F1(M1) + F2(M2) + F3(M3) + … • Factors driven by data available • Example Factors • CM Cost & Count for Past 6 Months • Operation Count for Past 6/12 Months • Gas Analysis – Change over time • Average Load over Time • Peer Groups • Apply calculations by peer group • Voltage, Class, Type • Example Groups: • 26KV – 69KV GCB • 138KV+ Power Transformer • LTC Vacuum Tanks PSEG T&D CBM

  11. Criticality • Calculation Structure • CA = F1(M1) + F2(M2) + F3(M3) + … • SAP Static Factors • Voltage • Location • Replacement Cost • Age • Peer Groups • Apply calculations by Equipment Class • Example Groups: • Gas Circuit Breaker • Power Transformers • Use as a tie breaker in CA evaluation

  12. Triggers Measurement Document Interface PM Orders Notifications Order & Status Updates Data Tour Tour and Values Job and Status CAD/PI Substation Inspection Process PI Manual Logger database PI Manual Logger Data entry • SAP generates inspection order • CAD Auto-dispatch orders to operators groups • Operator collects inspection data via PI-ML and sends to PI • PI evaluates data and generates SAP notifications or transfers measurement document to SAP via PI RLINK PSEG T&D CBM

  13. Alerts / Notifications • PI-ACE Algorithms monitor real-time & weekly inspection data • Creates emails and SAP notification • Examples: • Excessive LTC Operations • High GCB Temperatures • Low GCB Pressure • Low Transformer Oil Tank Levels • Low Nitrogen Cylinder Pressure PSEG T&D CBM

  14. PSEG T&D CBM

  15. Algorithm Rules

  16. Critical Success Factor • Right Vision (Business & Technical) • Organizational Changes to support system • LOB Control • Change SME thought process • Tied success directly to SME and Asset Engineers Goals • Constantly Measuring Inputs PSEG T&D CBM

  17. Q&A PSEG T&D CBM