130 likes | 449 Views
Probe MMX Approach. 12.20. 11.60. Sampling. Desired Audit Risk. 11.60. 11.50. Significant risks. Control risk. Assertion level. Inherent risk. Fraud risk. 11.40. 11.30. Click here to view. 10.20. 11.20. 10.20 Engagement Evaluation. 11.20 Inherent Risk Assessment.
E N D
Probe MMX Approach 12.20 11.60 Sampling Desired Audit Risk 11.60 11.50 Significant risks Control risk Assertion level Inherent risk Fraud risk 11.40 11.30 Click here to view 10.20 11.20