1 / 13

International Polar Year 2007-2008 Progress report to STG 2

International Polar Year 2007-2008 Progress report to STG 2. International Polar Year 2007-2008 started.

dorie
Download Presentation

International Polar Year 2007-2008 Progress report to STG 2

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. International Polar Year 2007-2008 Progress report to STG 2

  2. International Polar Year 2007-2008 started IPY as an intensive and internationally coordinated campaign of high quality research activities and observations in the polar regions started on 1 March 2007 and will continue up to 1 March 2009. The WMO/ICSU Joint Committee (JC) for IPY and its three Sub-Committees including the Space Task Group worked actively to facilitate implementation of IPY projects that are consistent with the six themes and observational initiatives outlined in the IPY Framework document and in the Scope of Science for IPY 2007-2008. The WMO Inter-commission Task Group (ITG) on IPY and technical commissions addressed the IPY preparation at their sessions and developed relevant actions to facilitate the effective IPY implementation.

  3. Funding for IPY projects According to reliable information the IPY International Programme Office now estimates US$ 430 million in new IPY science funding. Those new funds combined with roughly US$ 800 million in existing polar research funding applied to IPY provide a total of approximately US$ 1.25 billion over the two IPY years. Of 222 endorsed projects: 100 projects received substantial funding, 70 projects- partial funding 52 projects - information is not yet received.

  4. IPY implementation The implementation of the IPY projects in the field has started in both polar regions, more widely in the Arctic. • Several international multidisciplinary marine expeditions were actively working in July - September 2007 in the Arctic Ocean, implementing a large number of IPY projects related to studies of physical and chemical oceanic processes, sea-ice properties and changes, physical and chemical interaction between atmosphere, sea-ice and ocean, marine geology and biology. • On land IPY projects are implemented at present in both polar regions, carrying out the studies of atmospheric processes, glaciers and ice sheets, permafrost, hydrological cycle, the ecosystems, circumpolar human societies, etc.

  5. Circumpolar Atmospheric Observatories Network proposed in International Arctic Systems for Observing the Atmosphere (IASOA) Project Courtessy by Y. Viisanen

  6. No data on temperature and salinity under sea ice…

  7. satellite ITP ITP sea ice hydrophone LF2 hydrophone LF2 hydrophone LF2 modem HF modem HF modem HF transponder transponder transponder IPS modem HF transducer LF1 hydrophone LF1 CTD transducer LF1 transducer LF1 modem HF glider float hydrophone LF1 halocline transducer LF2 IPY Project No 14 AOSB and WCRP/CliC, EU Project DAMOCLES Gascard’s iAOOS plan

  8. Geographic coverage maps by the space agencies proposed for Global Inter-agency IPY Polar Snapshot Year (GIIPSY) project A. Antarctica and Greenland (Glaciers, ice caps, ice sheets) B. Arctic and Antarctic Sea Ice E. Lake and River Ice C. Terrestrial Snow Cover D. Permafrost Full array of geographic coverage maps available at www-bprc.mps.ohio-state.edu/rsl/GIIPSY

  9. Activities of IPY Joint Committee and its bodies in IPY preparation (1) The JC 6 (Quebec, October 2007) focussed on IPY’s legacies. With respect of IPY’s observing systems legacy, JC endorsed the proposal of SCOBS to develop a roadmapthat will provide a consolidated vision of IPY observing systems legacy, which should be based on the outcomes of series of meetings such as: - sessions of IPY Space Task Group; - planning meetings on the Southern Ocean Observing System; - series of workshops on Sustaining Arctic Observing Networks; - a workshop planned to be organized by WCRP/CliC in cooperation with GEO on legacy of IPY observing systems related to the establishment of Global Cryosphere Watch (this proposal was welcomed by WMO Cg-XV). The roadmap developed by SCOBS should include a detailed proposal on establishing a mechanism for early assessment of benefits acquired from IPY observations in order to prepare for the support of long-term reinforcement and maintaining of networks in polar regions.

  10. Activities of IPY Joint Committee and its bodies in IPY preparation (2) As regards IPY’s data legacy, the JC 6 stressed that a lack of support for international data coordination hindered IPY’s progress toward a complete data inventory and eventual full data accessibility, two basic elements of IPY free and open data policy.  In the longer term, the JC foresees need for substantial new data archive services.  The JC will report these concerns as part of a short overall assessment of IPY status addressed to ICSU and WMO as well as to IPY community. 

  11. IPY conferences JC 6 reviewed and adopted planning process for IPY conferences and events including: • the SCAR-IASC Joint IPY Conference “ Polar Research - Arctic and Antarctic Perspectives in the International Polar Year"will be held in St Petersburg on July 8-11, 2008; • an Early Science Conference in Oslo in 2010 proposed to host by Norwegian government; • a ‘concluding’ conference in 2012 with focus on scientific results and assessments and on IPY practical and political implications proposed to host by Canada.

  12. Thank you!

More Related